GB 11341-2008 PDF EnglishUS$140.00 · In stock · Download in 9 seconds
GB 11341-2008: Safety rules for overhead chain conveyers Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure Status: Valid GB 11341: Historical versions
GB 11341-2008: Safety rules for overhead chain conveyers---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB11341-2008GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 13.110 C 68 Replace GB 11341-1989 Safety rules for overhead chain conveyers Issued on. DECEMBER 11, 2008 Implemented on. OCTOBER 1, 2009 Issued by. General Administration of Quality Supervision, Inspection and Quarantine of PRC; Standardization Administration of PRC. Table of ContentsForeword... 3 1 Scope... 4 2 Normative references... 4 3 Terms and definitions... 5 4 General requirements... 5 5 Requirements for design, manufacture, and installation... 6 6 Requirements for use, maintenance, and administration... 8 Appendix A (Normative) Maintenance content and cycle of each component of an overhead conveyor... 11ForewordThe entire content of this standard is mandatory. This standard is a revision of GB 11341-1989 “Safety rules for overhead chain conveyors”. Compared with GB 11341-1989, the main changes of this standard are as follows. --- The “Foreword” is added; --- The arrangement order is adjusted; --- The chapter “Terms and definitions” is added (Chapter 3 of this edition); --- The normative appendix “Maintenance content and cycle of each component of an overhead conveyor” is added (see Appendix A). Appendix A of this standard is a normative appendix. This standard is proposed by the State Administration of Work Safety. This standard shall be under the jurisdiction of the National Technical Committee on Work Safety of Standardization Administration of China (SAC/TC288). Drafting organizations of this standard. Kailuan (Group) Limited Liability Corporation, Tangshan Research Institute of China Coal Research Institute, Jinan Southern Conveying Equipment Co., Ltd., HBIS Group Tangsteel Company. The main drafters of this standard. Pei Hua, Zhang Jian, Mei Haibin, Liu Yongge, Cheng Yugui, Chen Hongxiang, Xia Xiaoguang. The previous editions of the standard replaced by this standard are as follows. --- GB 11341-1989. Safety rules for overhead chain conveyers1 ScopeThis standard specifies the safety technical requirements for the design, manufacture, installation, use, maintenance, and management of overhead chain conveyors. This standard is applicable to general-purpose overhead chain conveyors, accumulation overhead conveyors, and ground chain conveyors; for monorail overhead trolley conveyors, this standard can be used for reference.2 Normative referencesThe provisions in the following documents become the provisions of this standard through reference in this standard. For the dated references, the subsequent amendments (excluding corrections) or revisions do not apply to this Part, however, parties who reach an agreement based on this standard are encouraged to study if the latest versions of these documents are applicable. For undated references, the latest edition of the referenced document applies to this standard. GB 2893 Safety colours GB 2894 Safety signs and guideline for the use GB 3836.15 Explosive atmospheres - Part 15.Electrical installations design, selection and erection GB 3836.16 Explosive atmospheres -- Part 16.Electrical installations inspection and maintenance3 Terms and definitionsThe following terms and definitions apply to this standard. 3.1 track Rigid carrying parts that constitute a conveyor line, and on which trolleys and chains run. 3.2 safety device for vertical curves A safety device that can jam the moving parts on the inclined section in time to prevent them from sliding down, when a traction part is accidentally broken. [JB/T 7011-1993, definition 5.6] 3.3 drop section A device that can lift and lower the carrying trolleys on a conveying line. [JB/T 7011-1993, definition 7.8] 3.5 clamp A component that fixes the sling for the conveyed object.4 General requirements4.1 All potential risk factors shall be excluded or reduced as much as possible by design. 4.2 For hazards that cannot be avoided or adequately limited by design, necessary safety guards (guards, safety devices) shall be adopted. 4.3 For remaining dangers that cannot be eliminated or reduced by design, and for which the safety guards are ineffective or not fully effective, the operators shall be notified and warned by the information.5 Requirements for design, manufacture, and installation5.1 The safety factor of a track shall not be less than 2, and the allowable deflection shall not be greater than 1/300 of the span. The allowable deflection of the track of a monorail overhead trolley conveyor shall not be greater than 1/400 of the span. 5.3 The safety factor of hanging plates and slings shall not be less than 5. 5.4 The safety factor of the main force-bearing parts of the carrying trolley shall not be less than 5. 5.5 The drop section shall be lifted by two wire ropes or chains, and buffer devices shall be provided at the ends. The safety factor calculated according to the rated load of each wire rope shall not be less than 7, and the safety factor of the chain shall not be less than 10. 5.6 All starting and stopping devices shall be clearly marked and easily accessible. Emergency stop switches shall be installed on the line of an overhead conveyor, generally not less than one within a range of 30 m. 5.7 The equipment shall be equipped with sound and light warning signals to warn other personnel to pay attention to safety before the equipment is started. 5.8 The drive device shall be equipped with an overload protection device. When the tension of the tractive chain exceeds 1.5 times the allowable value, the power supply of the motor shall be cut off. The adjustment method shall be marked on the product manual and the corresponding part of the equipment shall be marked. 5.12 At the joints of the movable rail sections (such as drop sections or turnout devices) of an accumulation overhead conveyor and a monorail overhead trolley conveyor, safety devices that prevent the carrying trolleys from falling shall be installed. 5.13 Slings and carrying trolleys shall be connected reliably and shall not be disengaged by themselves. Slings shall be able to prevent objects from slipping or falling due to tilt during operation. 5.16 Interlocking devices shall be set near the turnout of an accumulation overhead conveyor to prevent the trolleys of the working conveying line from being sent to the non-working conveying line or the full-position conveying line. 5.17 All common lubricating points shall be easy to fill with oil, and the protective cover shall not be removed when lubricating. 5.21 When an overhead conveyor passes through a floor, the opening shall be equipped with protective railings. 5.22 Vertical ladders, inclined ladders, guardrails, and platforms shall meet the requirements of GB 4053.1~4053.4 respectively. 5.23 The parts of an overhead conveyor, which are between the ground and the height of 2 m, shall not have sharp corners that are easily accessible by the personnel, otherwise, there shall be guards. 5.24 When an overhead conveyor runs at the rated load and rated speed, the noise at each point 1 m away from the equipment shall not be greater than 80 dB(A).6 Requirements for use, maintenance, and administration6.1 Except for designated personnel, no one shall start the equipment or interfere with the normal operation of the equipment. 6.2 The operators and maintenance personnel of the overhead conveyor shall pass the safety technical training and examination and hold the work permit. 6.6 The operators shall load objects according to the regulations, and the overhead conveyors shall not be overloaded. The loading operation procedures shall be indicated in the obvious position near the loading station, and the procedures shall include the allowable loading amount, positioning method, and limit size. 6.7 The equipment, especially the driving devices, tractive chains, and slings, shall be kept in good working condition and maintained in time. All loading, unloading, and operating stations as well as overhead conveyor passages shall be kept clean. 6.8 If the part where the safety guards are to be removed is located in the work area or where people pass, the part shall be separated by a fence to prevent people from approaching. 6.10 Manual lubrication shall not be carried out during the operation of the equipment, unless the location of the parts to be lubricated allows the operation; or special devices are provided and the safety can be ensured, then the operation can be carried out. If the shield needs to be opened for lubrication, the equipment shall be stopped for lubrication. 6.11 The tractive chain shall be lubricated regularly with lubricating oil, not lubricating grease. 6.12 It is strictly forbidden that objects (ladders, springboards, etc.) lean on or are placed on the chains or tracks. If the maintenance personnel have to do so, the equipment shall be stopped. 6.15 The maintenance content and cycle of each component of an overhead conveyor shall be carried out in accordance with the provisions in Appendix A. 6.16 The inspection, adjustment, maintenance, and cleaning of overhead conveyor equipment shall comply with the requirements of the manufacturer’s technical documents. 6.17 Each set of equipment shall be provided with equipment files that record the contents of maintenance, failure, repair, etc. 6.18 Tracks shall be scrapped if one of the following conditions occurs. 6.19 When the meshing pitch of the lifting chain in the drop section increases by 5%, the chain shall be scrapped. ......Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al. Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of English version of GB 11341-2008 be delivered?Answer: The full copy PDF of English version of GB 11341-2008 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.Question 2: Can I share the purchased PDF of GB 11341-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB 11341-2008_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB 11341-2008 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.Question 5: Should I purchase the latest version GB 11341-2008?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 11341-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.How to buy and download a true PDF of English version of GB 11341-2008?A step-by-step guide to download PDF of GB 11341-2008_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).Step 2: Search keyword "GB 11341-2008". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9 |