Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH
Industry Standard: TB, TB/T, TBT
              
TB <<
Std ID Description (Standard Title)
TB/T 10438-2024 (Railway power engineering inspection regulations)
TB/T 10439-2024 (Railway electric traction power supply engineering inspection regulations)
TB/T 10813-2024 (Base price of railway engineering materials)
TB/T 10814-2024 (Railway construction machinery and equipment unit cost quota)
TB/T 10821-2024 (Basic quota for railway engineering)
TB/T 10822-2024 (Railway Engineering Budget Quota (Volume 1) - Roadbed engineering))
TB/T 10823-2024 (Railway Engineering Budget Quota (Volume 2 - Bridge and culvert engineering))
TB/T 10824-2024 (Railway Engineering Budget Quota (Volume 3) - Tunnel engineering))
TB/T 10825-2024 (Railway Engineering Budget Quota (Volume 4) - Railway engineering))
TB/T 10826-2024 (Railway Engineering Budget Quota (Volume 5) - Communication engineering))
TB/T 10827-2024 (Railway Engineering Budget Quota (Volume 6) - Signal engineering))
TB/T 10828-2024 (Railway Engineering Budget Quota (Volume 7) - Information engineering))
TB/T 10829-2024 (Railway Engineering Budget Quota (Volume 8) - Electric power project))
TB/T 10830-2024 (Railway Engineering Budget Quota (Volume 9) - Electric traction power supply project))
TB/T 10831-2024 (Railway Engineering Budget Quota (Volume 10) - Housing Engineering))
TB/T 10832-2024 (Railway Engineering Budget Quota (Volume 11) - Water supply and drainage engineering))
TB/T 10833-2024 (Railway Engineering Budget Quota (Volume 12) - Mechanical engineering for locomotives and vehicles))
TB/T 10834-2024 (Railway Engineering Budget Quota (Volume 13) - Station engineering))
TB/T 1407.2-2024 (Train traction calculation - Part 2: EMU)
TB/T 2075.10-2024 (Electrified railway contact network components - Part 10: Wire branches)
TB/T 2075.11-2024 (Electrified railway contact network components - Part 11: Electrical connections)
TB/T 2075.1-2024 (Electrified railway contact network components - Part 1: Arm support device)
TB/T 2075.12-2024 (Electrified railway contact network components - Part 12: Pulley compensation devices)
TB/T 2075.13-2024 (Electrified railway contact network components - Part 13: Ratchet compensation devices)
TB/T 2075.14-2024 (Electrified railway contact network components - Part 14: Spring compensation device)
TB/T 2075.15-2024 (Electrified railway contact network components - Part 15: Plunger and Plunger restraining frame)
TB/T 2075.16-2024 (Electrified railway contact network components - Part 16: Soft cross support fixing device)
TB/T 2075.17-2024 (Electrified railway contact network components - Part 17: Soft cross connection device)
TB/T 2075.18-2024 (Electrified railway contact network components - Part 18: Soft cross suspension device)
TB/T 2075.19-2024 (Electrified railway contact network components - Part 19: Grounding clamps and connecting devices)
TB/T 2075.20-2024 (Electrified railway contact network components - Part 20: Additional wire parts)
TB/T 2075.21-2024 (Electrified railway contact network components - Part 21: Tunnel horizontal suspension device)
TB/T 2075.2-2024 (Electrified railway contact network components - Part 2: Arm base)
TB/T 2075.22-2024 (Electrified railway contact network components - Part 22: Tunnel support and positioning devices)
TB/T 2075.23-2024 (Electrified railway contact network components - Part 23: Tunnel anchor compensation device)
TB/T 2075.3-2024 (Electrified railway contact network components - Part 3: Positioning devices with limited positions)
TB/T 2075.4-2024 (Electrified railway contact network components - Part 4: Non Limiting type positioning device)
TB/T 2075.5-2024 (Electrified railway contact network components - Part 5: Terminal anchoring clamp)
TB/T 2075.6-2024 (Electrified railway contact network components - Part 6: Central anchoring device)
TB/T 2075.7-2024 (Electrified railway contact network components - Part 7: Integral suspension string and suspension string clamp)
TB/T 2075.8-2024 (Electrified railway contact network components - Part 8: Elastic sling device)
TB/T 2075.9-2024 (Electrified railway contact network components - Part 9: Connector connection wire clamp)
TB/T 2765.1-2024 (Train operation monitoring system - Part 1: Technical conditions)
TB/T 2973.1-2024 (Train rear safety protection system - Part 1: Truck tail)
TB/T 3162.4-2024 (Railway vehicle parking anti-slip device - Part 4: Anti-slip fastener)