HOME   Cart(3)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

CCAP-GZ-49942-2021 PDF English

US$1380.00 · In stock · Download in 9 seconds
CCAP-GZ-49942-2021: Implementation rules for CCAP mark certification - Frame, fork and handle of electric bicycle
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
CCAP-GZ-49942-2021English1380 Add to Cart 0-9 seconds. Auto-delivery Implementation rules for CCAP mark certification - Frame, fork and handle of electric bicycle

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: CCAP-GZ-49942-2021
      

Similar standards

CCAP-GZ-5561   CNCA-No10   CCAP-GZ-464204   

CCAP-GZ-49942-2021: Implementation rules for CCAP mark certification - Frame, fork and handle of electric bicycle


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/CCAP-GZ-49942-2021
Serial No.. CCAP-GZ-49942.2021 Implementation Rules for CCAP Mark Certification Frame, Fork and Handle of Electric Bicycle Issued on. DECEMBER 31, 2021 Implemented on. DECEMBER 31, 2021 China Certification Centre for Automotive Products

Table of Contents

1 Application scope... 5 2 Certification basis and standards... 5 3 Certification mode selection and relevant requirements... 5 4 Classification of certification unit... 6 5 Certification entrusting... 6 6 Certification implementations... 10 7 Post-certification supervision... 16 8 Certificate... 19 9 Certification marks... 21 10 Charges... 21 11 Certification responsibilities... 22 12 Process and time-limit requirements related to technical disputes, complaints and appeal... 22 Attachment 1 -- Description of Frame, Fork and Handle of Electric Bicycle... 23 Attachment 2 -- List of Critical Components / Materials of Frame, Fork and Handle of Electric Bicycle ... 25 Attachment 3 -- Type Test Items... 26 Attachment 4 -- Production conformity requirements... 28 Appendix 1 -- Factory quality assurance capability requirements... 30 Attachment 5 -- Compilation requirements of production conformity control plan and implementation report... 35 Appendix 1 -- Recommended format of production conformity control plan... 39 Attachment 6 -- Principles of producing enterprise classification... 42 Attachment 7 -- Requirements for the utilization of producing enterprise��s test resources to implement tests and the utilization of other certification results... 44 Preface This Rules was formulated and issued by China Certification Centre for Automotive Products (CCAP). The copyright rests with China Certification Centre for Automotive Products. No organization or individual may use it in whole or in part in any form without the permission of China Certification Centre for Automotive Products. Drafting organization. China Certification Centre for Automotive Products Drafters. Wang Lei, Wu Xiangliang, Zhao Hongli, Dong Degang, Gong Jinlong, Xu Shuanglong, Lu Haixu.

1 Application scope

This Rules is applicable to frame, fork and handle of electric bicycle.

2 Certification basis and standards

GB 17761-2018, Safety Technical Specification for Electric Bicycle GB 3565-2005, Safety Requirements for Bicycles QB/T 1880-2008, Front Forks for Bicycles QB/T 1881-2008, Front Forks for Bicycles QB/T 1715-1993, Handles for Bicycles In principle, the above standards shall be the latest version issued by the national standardization administrative department. When other versions of the standards are to be used, they shall be in accordance with the announcement, which is applicable to relevant standards issued by CCAP.

3 Certification mode selection and relevant requirements

3.1 Basic certification modes Basic certification mode of CCAP mark certification for the frame, fork and handle of electric bicycle is. Type test + initial factory inspection + post-certification supervision In the above basic certification mode, post-certification supervision includes two modes. post-certification follow-up inspection and supervision sampling test. In which, supervision sampling test includes production on-site sampling test or inspection and market sampling test or inspection. 3.2 Applicability of certification mode CCAP shall discretionally increase / decrease the certification elements for various types of enterprises based on the basic certification mode, including. Class A. Post-certification follow-up inspection, or production on-site sampling test or inspection, or market sampling test or inspection, or any combination of the three methods can be taken as post-certification supervision methods.

4 Classification of certification unit

In principle, the frame, fork and handle of electric bicycle produced by the same- producer (manufacturer) and same producing enterprise (location), and having no significant difference in the following aspects could be classified as one certification unit. 4.1 Frame 4.2 Fork 4.3 Handle

5 Certification entrusting

5.1 Proposal and acceptance of certification entrusting The certification client shall submit a certification entrusting to CCAP in an appropriate mode in accordance with CCAP��s certification process and requirements, and shall be responsible for the authenticity and legality of the certification entrusting materials submitted. The certification client shall be able to assume relevant quality and legal responsibilities. Producers (manufacturers) and producing enterprises of the frame, fork and handle of electric bicycle entrusted with certification shall be able to normally produce, and comply with the requirements of national laws, regulations and relevant industry policies. 5.2 Certification entrusting materials The certification client shall provide the materials required for the certification entrusting in accordance with the following requirements. 5.3 Implementation arrangements The certification client submits the certification entrusting application to CCAP (completed on the CCAP certification platform for clients. http.//3c.cccap.org.cn). The normal certification process is as follows.

6 Certification implementations

6.1 Type test 6.1.1 Type test plan CCAP shall formulate the type test plan after reviewing the materials and inform the certification client. The certification client may select the contracted laboratory on its own. Once the laboratory is selected, in principle, no adjustments will be made. The certification client may propose opinions on the type test plan. If the contracted laboratory has any objection to the type test plan, it shall explain the situation to CCAP. The type test plan includes requirements and quantity of all samples, the inspection standard, inspection items, and information of the contracted laboratory, etc. (including differential test requirements). 6.1.2 Sample requirements of type test Normally, the certification client shall choose representative samples for the type test and send them to the contracted laboratory for testing in accordance with CCAP requirements. When necessary, CCAP can also obtain samples through on-site sampling / sample sealing. 6.1.2.1 Quantity of type test samples (1) Frame of electric bicycle. 7 PCS; (2) Fork of electric bicycle. 12 PCS; (3) Handle of electric bicycle. 13 PCS. 6.1.3 Type test items and testing basis The type test items and testing basis are shown in the applicable clauses and items of the standards in Article 2 of this Rules. See Attachment 3 for details. 6.1.4 Selection and confirmation of the contracted laboratory The certification client may select and confirm a testing laboratory within the range of laboratories provided by CCAP for the certification products. According to the client��s confirmation, CCAP shall give inspection commission to the contracted laboratory to conduct type test. 6.1.5 Implementation of type test Type test shall be completed by the contracted laboratory entrusted by CCAP. The contracted laboratory shall complete the sample test within the stipulated time according to relevant stipulations of CCAP. The laboratory shall make a complete record of the whole test process and put it on file in order to ensure traceability of the test process and results. 6.1.6 Type test report CCAP stipulates a uniform format for the type test report. After the type test finishes, the laboratory shall issue a type test report to CCAP. The test report shall be accurate, clear and complete, and include product description within the application unit, and relevant certification information. After the certification completes, CCAP shall send the type test report, together with the certificate (or certification decision), to the certification client. The certification client shall ensure to provide the complete and effective type test report to CCAP and law-enforcement agencies during post-certification supervision. 6.2 Initial factory inspection Initial factory inspection is an assessment conducted by CCAP on whether the enterprise��s production conformity control system meets the certification requirements. It is conducted in the mode of ��production conformity control plan inspection + production conformity factory on-site inspection��. 6.2.1 Basic principle The producer and producing enterprise shall establish, implement and maintain the production conformity control system according to requirements specified in Attachment 4 and Attachment 5, so as to ensure that the certification products can continuously meet the certification requirements. 6.2.2 Production conformity control plan auditing The factory shall formulate the production conformity control plan in accordance with the requirements of Attachment 4 and Attachment 5 and submit it to CCAP for auditing. After the review is completed, CCAP shall inform the certification client of the review results. If the production conformity control plan can meet the requirements, the audit is PASS. If CCAP considers that the production conformity control plan is not up to standard, the client shall make rectifications and submit again. After completing the new review, CCAP shall inform the client of the audit results. 6.2.3 Production conformity factory on-site inspection In general, after the type test and the production conformity control plan auditing are qualified, CCAP shall conduct the production conformity inspection. If required, the type test and factory on-site inspection of conformity can be simultaneously conducted. 6.3 Certification evaluation and decision CCAP conducts comprehensive assessment of the type test results, the initial factory inspection results and relevant materials / information. If the evaluation is PASS, the certificate shall be granted according to certification unit. If not, the certification is terminated. 6.4 Time-limit of certification Time-limit of certification refers to the period FROM the date when CCAP formally accepts the entrusting TO the date when the certificate is issued. Usually, FROM the date when CCAP accepts the entrusting TO the date when the certificate is issued, the time is not more than 90 days. In which, it includes type test time, factory inspection time, test report submission time, evaluation and approval time of the certification results, and the certificate-making time.

7 Post-certification supervision

Post-certification supervision refers to that CCAP conducts supervision to the certified products and their producing enterprise. The supervision mode is one of or combination of the following three modes. post-certification follow-up factory inspection, production on-site sampling test, and market sampling test. 7.1 Post-certification follow-up inspection 7.1.1 Principles of post-certification follow-up inspection CCAP shall conduct effective follow-up inspection to the certified products and their producing enterprise based on the producing enterprise classification management, so as to verify that producing enterprise��s quality assurance capacity continuously meets the certification requirements; ensure that the certified products continuously meet the certification requirements; and maintain the conformity with type test samples. 7.1.2 Content of post-certification follow-up inspection Under the principle of ensuring that the certification risks are controllable, the post- certification follow-up inspection mainly includes the following contents. 7.2 Production on-site sampling test or inspection 7.2.1 Principles of production on-site sampling test or inspection If the mode of production on-site sampling test or inspection is adopted for post- certification supervision, then, the certification client, producer and producing enterprise shall cooperate. 7.2.2 Content of production on-site sampling test or inspection In principle, different units / models of products shall be drawn as samples for each time of supervision. CCAP formulates the sampling inspection plan according to the producing enterprise classification principles and features of the products. For the inspection items, all or several of the type test inspection items shall be inspected, and at least the photometric requirements shall be covered. 7.2.3 Utilization of self-test resources of enterprise If the producing enterprise has the test conditions that meet the certification standard requirements and complies with the requirements specified in Attachment 7 of this Rules, then, it may utilize the test resources of the producing enterprise to conduct production on-site sampling test (or visual test). 7.3 Market sampling test or inspection According to situations of the producing enterprise classification management and the certification risk, when necessary, CCAP shall draw up a market sampling test (or inspection) plan for certified products of the enterprise to conduct market sampling test or inspection. 7.4 Frequency and time of post-certification supervision See Table 1 for the frequency of post-certification supervision. In non-continuous production, the certification client and the producing enterprise shall actively submit the production plan to CCAP in order to ensure effective implementation of the post- certification supervision. 7.5 Record of post-certification supervision CCAP shall make appropriate record of the whole process of post-certification supervision and archive it on file in order to ensure the traceability of the certification process and the results. 7.6 Evaluation of post-certification supervision results CCAP shall conduct a comprehensive assessment to the follow-up inspection results, the sampling inspection results and relevant materials.

8 Certificate

8.1 Maintenance of certificate This Rules covers the 5-year valid period of product certificate. Within the valid period, the validity of the certificate is maintained by depending on the ��post-certification supervision�� of CCAP. 8.2 Content of certificate If the certified product and selling package are marked with the content contained in the certificate, it shall be consistent with the content in the certificate. 8.3 Change of certificate 8.3.1 Change of certification requirements (including standard change-version) When the certification requirements are changed, CCAP shall issue the above- mentioned certification requirements on the public website. At the same time, CCAP shall notify the certification enterprises by business system, fax, email or other methods. After the certification enterprises receive the notice, it shall submit the certification change application and the required materials to CCAP through the CCAP certification platform for clients. 8.4 Cancellation, suspension and withdrawal of certificate Certificate��s cancellation, suspension and withdrawal shall be implemented in accordance with relevant provisions of ��Certificate and certification mark management regulations��. CCAP shall adopt an appropriate mode to publicly announce the certificate of cancellation, suspension and withdrawal. 8.5 Use of certificate Use of the certificate shall comply with the requirements of ��Certificate and certification mark management regulations��.

9 Certification marks

If the certified organization uses the certification mark, it shall comply with the requirements of "Certificate and certification mark management regulations". 9.1 Mark style permitted to use The certified frame, fork and handle of electric bicycle are allowed to use safety-type (S) certification mark. The style is as follows. It is allowed to use a deformed CCAP mark style, that is, the mark word "CCAP". 9.2 Use requirements The certification marks shall be permanently preserved. They shall be clearly visible without damaging the vehicles and certified products. Any of the three modes of standard specifications marking, printing / molding can be used. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of CCAP-GZ-49942-2021 be delivered?

Answer: The full copy PDF of English version of CCAP-GZ-49942-2021 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of CCAP-GZ-49942-2021_English with my colleagues?

Answer: Yes. The purchased PDF of CCAP-GZ-49942-2021_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- CCAP-GZ-49942-2021 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of CCAP-GZ-49942-2021?

A step-by-step guide to download PDF of CCAP-GZ-49942-2021_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "CCAP-GZ-49942-2021".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9