HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

CCAP-GZ-464204-2021 PDF English

US$1290.00 · In stock · Download in 9 seconds
CCAP-GZ-464204-2021: Implementation Rules for CCAP Mark Certification - Battery and charger for electric bicycle
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
CCAP-GZ-464204-2021English1290 Add to Cart 0-9 seconds. Auto-delivery Implementation Rules for CCAP Mark Certification - Battery and charger for electric bicycle

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: CCAP-GZ-464204-2021
      

Similar standards

CCAP-GZ-499422   CNCA-No10   CCAP-GZ-499420   

CCAP-GZ-464204-2021: Implementation Rules for CCAP Mark Certification - Battery and charger for electric bicycle


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/CCAP-GZ-464204-2021
Serial No.. CCAP-GZ-464204.2021 Implementation Rules for CCAP Mark Certification Battery and charger for electric bicycle Issued on. FEBRUARY 01, 2021 Implemented on. FEBRUARY 01, 2021 China Certification Centre for Automotive Products

Table of Contents

1 Application scope... 4 2 Certification basis and standards... 4 3 Certification mode selection and relevant requirements... 4 4 Classification of certification unit... 5 5 Certification entrusting... 5 6 Certification implementations... 9 7 Post-certification supervision... 16 8 Certificate... 20 9 Certification marks... 22 10 Charges... 23 11 Certification responsibilities... 23 12 Process and time-limit requirements related to technical disputes, complaints and appeal... 23 Attachment 1 -- Description of battery and charger for electric bicycle... 24 Attachment 2 �C Type test and production conformity test items... 26 Attachment 3 -- Production conformity requirements... 27 Appendix 1 -- Factory quality assurance capability requirements... 30 Appendix 2 -- Compilation requirements of production conformity control plan and implementation report... 36 Appendix 3 -- Recommended format of production conformity control plan... 40 Attachment 4 -- Principles for manufacturing enterprise classification... 44 Attachment 5 -- Requirements for using manufacturing enterprise testing resources to implement testing and the use of other certification results... 47

1 Application scope

This Rules is applicable to lithium-ion batteries, sealed lead-acid batteries, metal hydride nickel batteries and their chargers for electric bicycles.

2 Certification basis and standards

2.1 For battery GB/T 36972-2018, Lithium-ion battery for electric bicycle GB/T 22199.1-2017, Valve-regulated lead-acid batteries for moped - Part 1.Technical conditions QB/T 2947.2-2008, Electric bicycles-cell or battery and chargers - Part 2.metal-hydride Ni-ion batteries and chargers (Except charge retention capacity and cycle life) 2.2 For charger GB/T 36944-2018, Technical requirements of charger for electric bicycles QB/T 5511-2020, Lithium-ion battery charger for electric bicycle In principle, the above standards shall implement the latest version issued by the national standardization administrative department. When other versions of the standard need to be used, the announcement of applicable relevant standard requirements issued by CCAP shall be followed.

3 Certification mode selection and relevant requirements

3.1 Basic certification modes The basic certification mode for implementing CCAP mark certification for battery and charger for electric bicycle is.

4 Classification of certification unit

The battery and its charger are divided into different units. In principle, battery and charger for electric bicycle produced by the same producer (manufacturer) and the same manufacturing enterprise (site) with no significant differences in the following aspects are one certification unit. 4.1 Battery. 4.2 Charger.

5 Certification entrusting

5.1 Proposal and acceptance of certification entrusting The certification client shall submit a certification entrustment to CCAP in an appropriate manner in accordance with CCAP's certification process and requirements, and shall be responsible for the authenticity and legality of the submitted certification application materials. The certification client shall be able to assume relevant quality and legal responsibilities. The battery producers (manufacturers) and manufacturing enterprises entrusted with certification shall be able to produce normally and comply with national laws, regulations and relevant industrial policy requirements.

6 Certification implementations

6.1 Type test 6.1.1 Type 1 test plan CCAP shall formulate a type test plan after reviewing the data and inform the certification client. Certification client can choose designated laboratories by himself. Once the laboratory is selected, no adjustments will be made in principle. 6.1.2 Sample requirements of type test Normally, the certification client selects representative samples for testing according to the requirements of CCAP for type test samples. When necessary, CCAP can also obtain samples through on-site sampling/sealing. If there is only one model in the certification unit, a sample of this model will be sent. When there is more than one model in the unit, CCAP will select a representative model among them, and conduct difference tests on other models when necessary. 6.1.2.1 Specification and quantity of type test samples Quantity of type test samples. Refer to Attachment 2 "Type test and production conformity items". The final number of test samples is subject to the test plan confirmed by CCAP and the certification client or its agent. 6.1.2.2 Critical components/raw materials list and relevant requirements When sending samples, the certification client shall also submit a product description sheet and a list of critical components/raw materials. It shall be consistent with the critical components/raw materials identified in the "Production Conformity Control Plan" submitted by the enterprise. The list must at least include the name, model, specification and supplier of critical components (materials). 6.1.3 Type test items and test base See Attachment 2 of this Rules for type test items and test base. 6.1.4 Selection and confirmation of the designated lab The certification client can select a lab among the designated inspection labs provided by CCAP for the certification products. According to the client��s confirmation, CCAP shall give inspection commission to the selected lab to conduct type test. 6.1.5 Implementation of type test Type test shall be completed by the designated lab entrusted by CCAP. The designated lab shall complete the sample testing within the stipulated time according to relevant stipulations of CCAP. The lab shall make a complete record of the whole test process and put it on file in order to ensure traceability of the inspection process and result. If there is unqualified item, the lab shall inform the situation to CCAP. 6.1.6 Type test report CCAP stipulates a unified type test report format. After the type test finishes, the lab shall issue a type test report to CCAP. The test report shall be accurate, clear, and complete. It shall include a description of the products and certification-related information in the application unit. After the certification completes, CCAP shall send the type test report, together with the certificate, to the certification client (or certification decision). The certification client shall ensure to provide the complete and effective type test report to CCAP and law-enforcement agencies during post-certification supervision. 6.2 Initial factory inspection Initial factory inspection is an assessment conducted by CCAP on whether the enterprise��s production conformity control system meets the certification requirements. It is conducted in the mode of production conformity control plan inspection + production conformity factory on-site inspection. 6.2.1 Basic principle The manufacturer and the manufacturing enterprise shall establish, implement and maintain the production conformity control system according to requirements specified in Attachment 3 so as to ensure that the certification-products can meet the certification requirements continuously. 6.2.2 Production conformity control plan auditing The factory shall develop a production conformity control plan in accordance with the requirements of Attachment 3 and submit it to CCAP for review. CCAP will notify the certification client of the review results after the review is completed. If the production conformity control plan can meet the requirements, the audit is PASS. 6.3 Certification evaluation and decision CCAP conducts comprehensive assessment of the type test result, the initial factory inspection result and relevant materials/information. If the evaluation is PASS, the certificate shall be granted according to certification unit. If not, the certification is terminated. 6.4 Time-limit of certification Time-limit of certification refers to the period FROM the date when CCAP accepts the entrusting TO the date when the certificate is issued.

7 Post-certification supervision

Post-certification supervision refers to that the certification body conducts supervision to the certification-products and the manufacturing enterprise. The supervision method is one of or combination of the following three modes. post-certification follow-up factory inspection, production on-site sampling test, and market sampling test or inspection. 7.1 Post-certification follow-up inspection 7.1.1 Principles of post-certification follow-up inspection CCAP shall conduct effective follow-up inspection to the certification-products and the manufacturing enterprise based on the manufacturing enterprise classification management, so as to verify that manufacturing enterprise��s quality assurance capacity continuously meets the certification requirements; ensure the certified product continuously meets the certification requirements; and maintain the conformity with type test samples. 7.1.2 Content of post-certification follow-up inspection Under the principle of ensuring that certification risks are controllable, the post- certification follow-up inspection mainly include the following. 7.2 Production on-site sampling test or inspection 7.2.1 Principles of production on-site sampling test or inspection In principle, sampling test or inspection at the production site shall at least cover the certified product categories (i.e., lithium ion, lead-acid, metal hydride nickel, charger, etc.). 7.2.2 Content of production on-site sampling test or inspection In principle, different unit/models of products shall be drawn as samples for each time of supervision. CCAP formulate the sampling inspection plan according to the enterprise classification principles and features of the products. For the inspection items, all or several of the type test inspection items shall be inspected. 7.3 Market sampling test or inspection According to situations of the enterprise classification management and the certification risk, when necessary, CCAP shall draw up a market sampling test (or inspection) plan for certification-products of the enterprise to conduct market sampling test or inspection. The inspection items shall be selected from the type test items. CCAP shall dispatch personnel to draw samples from the products sold on market (from the finished vehicle factory or the user��s site) according to the sampling test plan and send them to the designated lab to conduct test or inspection. 7.4 Frequency and time of post-certification supervision See Table 2 for frequency of post-certification supervision. In non-continuous production, the certification client and the manufacturing enterprise shall actively submit the production plan to CCAP in order to ensure effective implementation of the post-certification supervision. For Category A enterprises, in the years when on-site supervision and inspection are exempted, a production conformity control plan implementation report shall be submitted to CCAP one month before the supervision and inspection. 7.5 Record of post-certification supervision CCAP shall make appropriate record of the whole process of post-certification supervision and archive it on file in order to ensure the traceability of the certification process and the result. 7.6 Evaluation of post-certification supervision result CCAP shall conduct a comprehensive assessment to the follow-up inspection result, the sampling inspection result and relevant materials. If it passes the assessment, the certificate can be kept and the certification mark can be continuously used; if it fails in the assessment, CCAP shall handle with suspension or withdrawal of the certificate according the corresponding situation; and an announcement shall be issued.

8 Certificate

8.1 Maintenance of certificate This Rules covers the 5-year valid period of product certificate. Within the valid period, the validity of the certificate is maintained by depending on the post-certification supervision of CCAP. 8.2 Content of certificate If the certified product and selling package are printed with the content contained in the certificate, it shall be consistent with the content in the certificate. 8.3 Change of certificate 8.3.1 Change of certification requirements (including standard change-version) When the certification requirements are changed, CCAP shall issue the above- mentioned certification requirements on the public website. At the same time, CCAP shall notify the certification enterprises by fax, email or other methods. 8.4 Cancellation, suspension and withdrawal of certificate Certificate��s cancellation, suspension and withdrawal shall be implemented in accordance with relevant provisions of ��Certificate cancellation, suspension and withdrawal implementation rules��. CCAP shall adopt appropriate way to publicly announce the certificate of cancellation, suspension and withdrawal. 8.5 Use of certificate Use of the certificate shall comply with the requirements of ��Certificate and certification mark management regulations��.

9 Certification marks

If the certified organization uses the certification mark, it shall comply with the requirements of CCAP "Certificate and certification mark management regulations". 9.1 Mark style permitted to use The certified battery and charger for electric bicycle shall use safety-type (S) certification mark. The style is as follows. 9.2 Use requirements The certification marks shall be permanently preserved. They shall be clearly visible without damaging vehicles and certified products. It shall use CCAP certification mark printed/molded with non-standard specifications. The mark shall be printed/molded on the outer surface of the vehicle interior or its smallest outer packaging. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of CCAP-GZ-464204-2021 be delivered?

Answer: The full copy PDF of English version of CCAP-GZ-464204-2021 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of CCAP-GZ-464204-2021_English with my colleagues?

Answer: Yes. The purchased PDF of CCAP-GZ-464204-2021_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- CCAP-GZ-464204-2021 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of CCAP-GZ-464204-2021?

A step-by-step guide to download PDF of CCAP-GZ-464204-2021_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "CCAP-GZ-464204-2021".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9