NB/T 10532-2021 English PDFUS$329.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. NB/T 10532-2021: Technical regulation on monitoring of land reclamation quality for opencast coal mines Status: Valid
Basic dataStandard ID: NB/T 10532-2021 (NB/T10532-2021)Description (Translated English): Technical regulation on monitoring of land reclamation quality for opencast coal mines Sector / Industry: Energy Industry Standard (Recommended) Classification of Chinese Standard: D04 Word Count Estimation: 14,132 Issuing agency(ies): National Energy Administration NB/T 10532-2021: Technical regulation on monitoring of land reclamation quality for opencast coal mines---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Technical regulation on monitoring of land reclamation quality for opencast coal mines ICS 73.040 CCSD04 Energy Industry Standards of the People's Republic of China Technical Regulations for Quality Monitoring of Land Reclamation in Open-pit Coal Mines Released on 2021-01-07 Implementation on 2021-04-01 Issued by the National Energy Administration Table of contentsForeword Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 General requirements 2 5 Work process 2 6 Preparation stage 2 7 Monitoring unit 3 8 Monitoring indicators 3 9 Monitoring method 3 10 Monitoring report 6 Appendix A (Informative) Survey Form 7 of the Status Quo of Land Reclamation in Opencast Coal Mines Appendix B (informative) Monitoring index system for land reclamation quality of open-pit coal mine 8 Appendix C (informative) Monitoring point setting method 9 Appendix D (Informative) Outline for Compiling Quality Monitoring Report of Open-pit Coal Mine Land Reclamation 10 Reference 11ForewordThis document is in accordance with GB/T 1.1-2020 "Guidelines for Standardization Part 1.Structure and Drafting Rules of Standardization Documents". To be drafted. Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents. This document was proposed by the China Coal Industry Association. This document is under the jurisdiction of the Science and Technology Development Department of China Coal Industry Association. This document was drafted by. State Key Laboratory of Water Resources Protection and Utilization in Coal Mining, China University of Mining and Technology (Beijing), China Coal Industry Industry Association Productivity Promotion Center, National Energy Shendong Coal Group Co., Ltd., Shenhua Zhungeer Energy Co., Ltd., Beijing Low Carbon Clean Clean Energy Research Institute. The main drafters of this document. Li Quansheng, Zhang Kai1), Cao Zhiguo, Xu Heng, Zheng Houfa, Guo Junting, Zhang Kai2), Zhang Guojun, Yang Yingming, Li Jingfeng, Zhang Bin. This document is issued for the first time. 1) China University of Mining and Technology (Beijing). 2) State Key Laboratory of Water Resources Protection and Utilization in Coal Mining. Technical Regulations for Quality Monitoring of Land Reclamation in Open-pit Coal Mines1 ScopeThis document specifies the general requirements, work flow, preparation phase, monitoring unit, monitoring indicators, Monitoring methods and monitoring report drafting outlines. This document is applicable to the monitoring of land reclamation quality in open-pit coal mines, and other types of land reclamation quality monitoring can refer to this document.2 Normative referencesThe contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to This document. GB 50026-2007 Engineering Survey Code HJ802 Determination of Soil Electrical Conductivity Electrode Method NY/T 1121.1 Soil Testing Part 1.Collection, Processing and Storage of Soil Samples NY/T 1121.2 Soil Testing Part 2.Determination of Soil pH NY/T 1121.3 Soil Testing Part 3.Determination of Soil Mechanical Composition NY/T 1121.4 Soil Testing Part 4.Determination of Soil Bulk Density NY/T 1121.6 Soil Testing Part 6.Determination of Soil Organic Matter TD/T 1036-2013 Land Reclamation Quality Control Standard3 Terms and definitionsThe following terms and definitions defined in TD/T 1036-2013 apply to this document. 3.1 Opencast coal mine reclamation area of opencastcoalmines Objects of land reclamation for open-pit coal mines. Note. Mainly include internal and external dumps, temporary land, etc. 3.2 Land reclamation quality The land damaged by production and construction activities and natural disasters has undergone remediation measures. The level of peace has reached the level of availability. [Source. TD/T 1036-2013, 3.2] 3.3 Monitoringoflandreclamationquality In the open-pit coal mine reclamation area where the soil reconstruction project has been completed, the monitoring activities of the land reclamation quality and its change trend are carried out. 3.4 Monitoringunit The monitoring area is divided according to the type of open-pit coal mine reclamation area and the direction of reclamation land use. ...... |