Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

LY/T 1889-2010 English PDF

US$179.00 ยท In stock
Delivery: <= 2 days. True-PDF full-copy in English will be manually translated and delivered via email.
LY/T 1889-2010: Technical regulation of seed propagation for cedrus deodara
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
LY/T 1889-2010179 Add to Cart 2 days Technical regulation of seed propagation for cedrus deodara  

Similar standards

LY/T 2407   GB/T 30762   LY/T 1650   LY/T 3345   LY/T 1773   LY/T 1941   

Basic data

Standard ID: LY/T 1889-2010 (LY/T1889-2010)
Description (Translated English): Technical regulation of seed propagation for cedrus deodara
Sector / Industry: Forestry Industry Standard (Recommended)
Classification of Chinese Standard: B61
Classification of International Standard: 65.020.20
Word Count Estimation: 5,543
Date of Issue: 2010-02-09
Date of Implementation: 2010-06-01
Quoted Standard: GB 6000; GB/T 6001; GB/T 16620
Regulation (derived from): State Forestry Administration Notice 2010 No. 2; industry standard filing Notice 2010 No. 5 (No. 125 overall)
Issuing agency(ies): State Forestry Administration
Summary: This standard specifies the cedar planting seedlings before sowing preparation, sowing, seedling management, seedling Chupu and grading and other technical requirements. This standard applies to Cedar proper nurturing seedlings planted area.

LY/T 1889-2010: Technical regulation of seed propagation for cedrus deodara

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical regulation of seed propagation for cedrus deodara ICS 65.020.20 B61 People's Republic of China Forestry Industry Standard Technical regulations for seeding and seedling of cedar Released on.2010-02-09 2010-06-01 implementation State Forestry Administration released

Foreword

This standard is proposed and managed by the National Forest Seed Standardization Technical Committee. This standard is drafted by. Nanjing Forestry University. Participated in the drafting of this standard. Jiangsu Forestry Technology Extension Station, Nanjing Forestry Station, and Nanjing Jiangpu District Forestry Station. The main drafters of this standard. Shen Yongbao, Zhong Lei, Ji Dong, Di Zenglong. Technical regulations for seeding and seedling of cedar

1 Scope

This standard specifies the technical requirements for pre-sowing preparation, sowing, seedling management, seedling emergence and grading of cedar seedlings. This standard applies to the cultivation of seedlings in the cedar suitable planting area.

2 Normative references

The terms in the following documents become the terms of this standard by reference to this standard. All dated references, followed by all Modifications (not including errata content) or revisions do not apply to this standard, however, parties to agreements based on this standard are encouraged to study Is it possible to use the latest version of these files? For undated references, the latest edition applies to this standard. GB 6000 Main afforestation tree seedling quality grading GB/T 6001 nursery technical regulations GB/T 16620 Forest Tree Breeding and Seed Management Terminology

3 Terms and definitions

The terms and definitions established by GB/T 16620 and the following are applicable to this standard. 3.1 The ovule remains in the pores of the seed coat, and the radicle breaks through the seed coat when the embryo is germinated. 3.2 Non-cultivated layer soil.

4 Preparation before broadcasting

4.1 Seed 4.1.1 Seeds should be free from pests and diseases and have high viability. 4.1.2 After the seed is purchased, the bag should be opened in time, spread out indoors (normal temperature), the thickness is about 10cm, and it is turned once a week. 4.2 Establishment of the site 4.2.1 Selection of depression It is advisable to choose a place with flat terrain, loose soil, good drainage, convenient irrigation and easy management. Soil pH should be 6.0~ Between 7.5. 4.2.2 Site preparation The site preparation should be carried out in the late fall and early winter, and should comply with the relevant provisions of GB/T 6001. 750kg compound fertilizer should be applied per hectare during land preparation. base fertilizer. Twisted again before the spring of the next year, the depth is 20cm. 4.2.3 Making a bed I made a bed one week before planting in the spring of the next year. High-lying areas should be used in rainy areas with a bed height of 0.3 m, a width of 1.2 m and a step width of 0.4 m. Arid land The area should be low bed with a bed width of 1.2m. Use carbendazim 2.5kg (carbendazim and soil in a ratio of 1.20) to spread evenly onto the bed surface and mix thoroughly. After the seedbed is completed, the bed surface is covered with 10cm of raw soil or sterile soil.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of LY/T 1889-2010_English be delivered?

Answer: Upon your order, we will start to translate LY/T 1889-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 2 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of LY/T 1889-2010_English with my colleagues?

Answer: Yes. The purchased PDF of LY/T 1889-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.