JTGB06-2007 English PDF
Basic dataStandard ID: JTG B06-2007 (JTGB06-2007)Description (Translated English): Highway engineering infrastructure project budget budgeting Sector / Industry: Highway & Transportation Industry Standard Classification of Chinese Standard: P66 Classification of International Standard: 93.080.01 Word Count Estimation: 89,856 Date of Issue: 2007-10-19 Date of Implementation: 2008-01-01 Regulation (derived from): ?Ministry of Transport Announcement 2011 No.83 Issuing agency(ies): Ministry of Transport Summary: This standard applies to new construction and renovation of infrastructure projects in highway engineering estimates, budgeting and management. Rural roads can refer to these Measures, the specific calculation method and billing standards by the provinces, autonomous regions and municipalities directly under the transportation department to develop. Budget or the revised estimate is preliminary design documents or technical design documents important part. Budget should be controlled in the approved construction project feasibility study report investment estimate is allowed to float amplitude range. Budget after approval is the basic construction project investment ceiling construction project investment plan is prepared to identify and control the construction project investment basis, is to control the construction design and construction drawing budget is based, is a measure of design options and choose the most economic rationality Good design is based, is assessing the effects of the construction project investment basis. Design units should be different design stages of preparation of budget estimates and revised estimates. Preparation of budget estimates or the revised estimate should be fully informed of the location of construction conditions, to master the basic data, the correct reference to the provisions of the quota, the standard fee, wages and materials, equipment prices price, according to provisions of this approach for the preparation, so that budget can be a complete accurately reflect the design content. Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JTGB06-2007_English be delivered?Answer: Upon your order, we will start to translate JTGB06-2007_English as soon as possible, and keep you informed of the progress. The lead time is typically in 9 seconds (download/delivered in 9 seconds). The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of JTGB06-2007_English with my colleagues?Answer: Yes. The purchased PDF of JTGB06-2007_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |