Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

JJG 1085-2013 English PDF

US$629.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
JJG 1085-2013: Verification Regulation of Reference Meters for Electrical Energy
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
JJG 1085-2013629 Add to Cart 5 days Verification Regulation of Reference Meters for Electrical Energy Valid

Similar standards

JJF 1234   JJG 376   JJF 1107   JJF 1075   JJG 1079   JJG 1075   

Basic data

Standard ID: JJG 1085-2013 (JJG1085-2013)
Description (Translated English): Verification Regulation of Reference Meters for Electrical Energy
Sector / Industry: Metrology & Measurement Industry Standard
Classification of Chinese Standard: A55
Classification of International Standard: 17.220
Word Count Estimation: 27,237
Older Standard (superseded by this standard): JJG 596-1999
Quoted Standard: JJG 597-2005; GB/T 17215.701-2011
Regulation (derived from): ?State AQSIQ Announcement 2013 No. 85
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine
Summary: This standard applies to the rated frequency of 50Hz or 60Hz initial verification standard electronic energy meter, follow-up test and use checks.

JJG 1085-2013: Verification Regulation of Reference Meters for Electrical Energy

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Verification Regulation of Reference Meters for Electrical Energy State verification procedures People's Republic of China Standard Meter Issued on. 2013-06-27 2013-08-27 implementation The State Administration of Quality Supervision, Inspection and Quarantine released Standard energy meter testing procedures ElectricalEner gy Replacing JJG 596-1999 Standard meter section Focal point. the National Technical Committee on Electromagnetic measurement Drafting units. China Institute of Metrology Liaoning Provincial Institute of Metrology The measurement procedure commissioned the National Technical Committee is responsible for interpreting electromagnetic The drafters of the regulations. Liu Lijuan (China Institute of Metrology) Wang Lei (China Institute of Metrology) Hong Tang (Liaoning Provincial Institute of Metrology)

table of Contents

Introduction (Ⅱ) 1 Scope (1) 2. References (1) 3 Overview (1) 4 metering performance requirements (1) 4.1 basic error (1) 4.2 input, output and display (3) 4.3 Control (3) 4.4 Start and stop (3) 4.5 AC voltage test and insulation resistance (4) 4.6 measurement repeatability (4) 5 General technical requirements (4) 5.1 Appearance (4) 6 Control of measuring instruments (4) 6.1 for initial verification and subsequent verification (4) 6.2 meter calibration standard should have the basic conditions (4) 6.3 Calibration means determining the standard meter energy measurement basic error (6) 6.4 meter standard test items (7) 6.5 Verification Methods (7) 6.6 test results processing and verification cycle (13) Appendix A test wiring diagram (14) B rounding method of measurement data appendix (16) Appendix C Standard Meter Verification original record format (17) Appendix D calibration certificate/test results in the notice page format style (p. 2) (19) Appendix E calibration certificate/test results test results page notice Shape (page 3) (20)

Introduction

The procedures in place JJG 596-1999 "electronic meters" standard meter section. The procedure for JJG 596-1999 "electronic meters" standard meter section be revised, the main changes as follows. --- Based JJF1002-2010 "national verification procedures to write rules" for the editorial changes; --- Procedure name from "electronic meters" to "standard meter"; --- This procedure applies only to electronic verification standard meter; --- Standard-meter basic error of energy measurement verification device according to JJG 597-2005 "AC power Meter testing equipment "revised accordingly. Standard energy meter testing procedures

1 Scope

The order applies to the rated frequency of 50Hz or 60Hz initial verification of standard electronic energy meter, follow-up inspection And given the use of checks. 2. References This procedure references the following documents. JJG 597-2005 AC power meter testing equipment GB/T 17215.701-2011 standard meter For dated references, only the dated edition applies to this procedure; undated reference documents Member, the latest edition (including any amendments) applies to this procedure.

3 Overview

Standard electrical energy meter is a measure of the energy meter. And it is usually designed to work in a controlled laboratory environment To obtain the highest accuracy and stability. Usually by the standard meter voltage input module, current input module, multiplication Module, the digital signal processing unit, an error processing module and a display module. Standard power meter can be used independently, but also as a master meter standard device verification equipment use.

4 metering performance requirements

4.1 basic error 4.1.1 Basic error expressed as a percentage relative error. Under the conditions specified in 6.2, the basic standard meter Error limit (referred to as the basic error limit) shall not exceed the specified in Table 1 and Table 2. 4.1.2 in the test cycle, the basic error of the standard meter shall not exceed the values in Table 1 and Table 2. Standard Electric Menu in the absolute value of the basic error of the test cycle change amount shall not exceed the absolute value of the basic error limit. The basic error of the absolute value of the amount of change in the 4.1.3 standard energy meter 24h shall not exceed the absolute value of the basic error limit 1/5. 4.1.4 Warm-up time from the end date, the standard meter continuous work 8h, basic error should not exceed the basic error Limit and basic error shall not exceed the amount of change in the absolute value specified in Table 3.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of JJG 1085-2013_English be delivered?

Answer: Upon your order, we will start to translate JJG 1085-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of JJG 1085-2013_English with my colleagues?

Answer: Yes. The purchased PDF of JJG 1085-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.