JG/T 332-2011 English PDFUS$339.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. JG/T 332-2011: Technical requirements of the heat allocation device by flow ratio and temperature of the water Status: Valid
Basic dataStandard ID: JG/T 332-2011 (JG/T332-2011)Description (Translated English): Technical requirements of the heat allocation device by flow ratio and temperature of the water Sector / Industry: Building & Construction Industry Standard (Recommended) Classification of Chinese Standard: P48 Classification of International Standard: 91.140.30 Word Count Estimation: 13,130 Date of Issue: 2011-08-09 Date of Implementation: 2012-02-01 Quoted Standard: GB 4208; GB 4943-2001; GB/T 17618; CJ/T 188-2004; JJG 1030-2007 Regulation (derived from): Ministry of Housing and Urban Notice No. 1123 Issuing agency(ies): Ministry of Housing and Urban-Rural Development of the People's Republic of China Summary: This standard specifies the method of flow temperature heat distribution unit terms and definitions, general requirements and technical requirements. This standard applies to industrial and civil heating measurement temperature method using heat flow distribution device products. JG/T 332-2011: Technical requirements of the heat allocation device by flow ratio and temperature of the water---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Technical requirements of the heat allocation device by flow ratio and temperature of the water People's Republic of China building industry standards Flow temperature method of heat distribution equipment technical conditions Posted on.2011-08-09 2012-02-01 implementation Ministry of Housing and Urban-Rural Development, People's Republic of China released ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard proposed by the Ministry of Housing and Urban Standard and Design Institute. This standard by the Ministry of Housing and Urban air conditioning and purification equipment standard technology focal point centralized. This standard was drafted. Beijing Zhongli Debon Intelligent Mechanical and Electrical Technology Co., Ltd., China Academy of Building Research, Gansu Architectural Design Research Institute, School of Electronic Information and Control Engineering, Beijing University of Technology, Information Institute of Lanzhou University, Beijing Electronic Product Quality Testing Center, Gansu Province Yuzhong heating station, the aircraft in the tenth hospital International Engineering Co., Ltd., Beijing Golden Blue Ocean Technology Co., Ltd., Beijing Changying New Digital Technology Co., Ltd., Harbin Transcendental Property Co., Ltd. The main drafters of this standard. Yu Guang, Zhang Jing, Wang Yan Bo, Tian Yafei, Luo Zhirong, Zhang Yanhua, Wang Keqin, Wang Zhiren, Zhang Min, Bao Dong, Cheng Hong, Wang Chengyu, Luo Fang, Liu Hua, Bai Xuerui. Flow temperature method of heat distribution equipment technical conditions1 ScopeThis standard specifies the terms and definitions of the flow temperature method of heat distribution device, the general requirements and technical requirements. This standard applies to industrial and residential heating metering flow temperature method heat distribution device products.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB 4208 enclosure protection (IP code) Information technology equipment safety GB/T 17618 Information Technology Equipment Immunity Limits and Methods of Measurement Technical Specifications for Data Transmission of Household Meters Ultrasonic flowmeter verification procedures3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 Flow temperature method heat distribution device heatalocationdevicebyflowratioandtemperatureofthewater Flow temperature method of heat distribution device is based on the total flow rate and temperature difference of heating user flow accounts for heat clearing point as the basis for heat distribution, The heat of the heating area heat balance point to determine the total heat measured distributed to each user a device; device by the total heat table, heat distribution And temperature collection processor and other equipment components, according to the needs of users can be equipped with heat finder and other auxiliary equipment. 3.2 Heat clearing point heatsettlementsite The location of the trade settlement between the heating party and the caloric value measured by the heat meter with the hot party. 3.3 Traffic ratio ratiobetweenapartmentandbuildingflow Heat Clearing Point The ratio of the total user flow to the total heat flow in the clearing point. 3.4 Heat distributor heatalocator It is used to transmit and summarize data, and distribute the total measured heat value to the equipment of each user. 3.5 Temperature collection processor temperaturedatalogger Equipment for collecting temperature data and transmitting data via wired/wireless communication. 3.6 Heat finder querydevice User queries with heat and balance of equipment. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JG/T 332-2011_English be delivered?Answer: Upon your order, we will start to translate JG/T 332-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of JG/T 332-2011_English with my colleagues?Answer: Yes. The purchased PDF of JG/T 332-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |