GB 50738-2011: Code for construction of ventilation and air conditioning
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDUSDBUY PDFDeliveryStandard Title (Description)Status
GB 50738-2011145 Add to Cart Auto, 9 seconds. Code for construction of ventilation and air conditioning Valid

Similar standards

GB/T 39976   GB 50072   GB 50243   GB/T 45462   

GB 50738-2011: Code for construction of ventilation and air conditioning

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB50738-2011
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA UDC P GB 50738-2011 Code for Construction of Ventilation and Air Conditioning Issued on. SEPTEMBER 16, 2011 Implemented on. MAY 1, 2012 Issued by. Ministry of Housing and Urban-Rural Construction of the People’s Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China. NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA Code for Construction of Ventilation and Air Conditioning GB 50738−2011 Chief Development Department. Ministry of Housing and Urban-Rural Development of the People’s Republic of China Approval Department. Ministry of Housing and Urban-Rural Development of the People’s Republic of China Implementation Date. May 1, 2012 Beijing 2011

Table of Contents

1 General Provisions...9 2 Terms...10 3 Basic Requirements...12 4 Metal Duct and Fittings Making...15 5 Nonmetallic or Composite Duct and Fittings Making...29 6 Air Valve and Components Making...50 7 Making and Installation of Trestle and Hanger...57 8 Air Duct and Components Installation...69 9 Air Handling Equipment Installation...81 10 Cold/Heat Sources and Auxiliary Equipment Installation...88 11 Installation of Pipeline and Accessory of Air Conditioning Water System...99 12 Refrigeration Pipeline and Accessory Installation... 111 13 Anticorrosion and Thermal Insulation... 115 14 Monitoring and Control System Installation... 124 15 Inspection and Testing... 129 16 Ventilation and Air Conditioning System Operation and Commissioning... 140 Explanation of Wording in This Code... 155 List of Quoted Standards... 156 Code for Construction of Ventilation and Air Conditioning

1 General Provisions

1.0.1 This code is formulated with view to strengthening the technology management for the construction and installation of ventilation and air conditioning, standardizing the construction technology, intensifying the control over construction and installation processes as well as guaranteeing the engineering quality. 1.0.2 This code is applicable to the construction and installation of ventilation and air conditioning involved in the building engineering. 1.0.3 During the construction and installation of ventilation and air conditioning, the requirements for engineering quality in technical engineering documents and contracting documents shall not be lower than those specified in this code. 1.0.4 The construction of ventilation and air conditioning shall not only meet the requirements stipulated in this code, but also comply with those in the current relevant ones of the nation.

2 Terms

2.0.1 Air duct A duct, made from metal, nonmetallic sheet or other material, for ventilation. 2.0.2 Nonmetallic duct Air duct made from such nonmetallic materials as rigid PVC and glass reinforced plastic (GRP). 2.0.3 Composite duct Air duct made from the compositing of incombustible surface course and thermal-insulating inner plate. 2.0.4 Air channel A channel, made from such building materials as concrete and brick, for ventilation. 2.0.5 Duct fittings Elbow, tee, cross, reducer, special tube, guide vane and flange used in the air duct system. 2.0.6 Duct component Air opening, valve, hood, cowl, muffler and filter involved in the air duct system. 2.0.12 Strength test Test on the pressure resistance of pipeline, pressure vessel, valve and accessory within specified pressure and pressure holding time. 2.0.13 Leakage test Test on the leakage of pipeline, pressure vessel, valve and accessory within specified pressure and pressure holding time.

3 Basic Requirements

3.1 Construction Technology Management 3.1.1 The enterprise which undertake the construction of ventilation and air conditioning shall have appropriate construction qualification. And appropriate technical standards shall be available for the construction site. 3.1.5 The change of construction drawings need be approved by the original design organization. Where the change of construction drawings involves in the using and energy-saving effects of ventilation and air conditioning, such change shall be subject to review by the censorship of the original construction drawing design documents. Before any change is made, relevant procedures shall be handled and confirmation by the supervision and development organizations is required. 3.1.6 Before system check and test as well as operation and commissioning, the construction organization shall prepare appropriate technical schemes and subject them to review and approval. 3.2 Construction Quality Management 3.2.1 Appropriate quality management system shall be established for the construction site of ventilation and air conditioning and shall cover the following content. 3.2.3 Where the pipeline crosses wall and floor slab, sleeve shall be arranged according to the design requirements, and flame retardant material shall be used between sleeve and pipeline for compact filling; where the pipeline crosses fire compartment, incombustible material shall be used for fireproof plugging. 3.2.4 Before connecting pipeline and equipment, the system pipeline shall pass the hydrostatic test and flushing (purging) test.

4 Metal Duct and Fittings Making

4.1 General Requirements 4.1.1 Mature technology and process as well as high-efficient, low-consumption and low-labor- intensity should be selected for metal duct and fittings making. 4.1.4 Before the air duct making for clean air conditioning system, soft fabrics shall be used to wipe the plates so as to clean up the contaminants and fats on their surfaces. After completion of such making, neutral detergent shall be timely used to clean up them, mercerized cloth shall be used to wipe the inside of air duct, and plastic film shall be used to seal the port of air duct. 4.1.6 The minimum thickness of steel plates for rectangular duct and fittings shall be selected according to the long side dimension of air duct segment and the design operating pressure of air duct system, and shall be in accordance with those specified in Table 4.1.6-1; the minimum thickness of steel plates for circular duct and fittings shall be selected according to the diameter of section, the design operating pressure of air duct system and the form of bite, and shall be in accordance with those specified in Table 4.1.6-2. 4.1.8 Before bulk processing of air duct, the processing technique shall be verified, and strength and leakage test shall be carried out. 4.2 Metal Duct Making 4.2.1 The metal duct shall be made according to the following procedures (Figure 4.2.1). Figure 4.2.1 Metal Duct Making Procedures 4.2.2 The plates or profiles shall be selected according to the construction drawings and relevant technical documents; moreover, the selected materials shall be re-inspected and shall meet the requirements of Article 4.1.6 in this code.

5 Nonmetallic or Composite Duct and Fittings Making

5.1 General Requirements 5.1.1 The fire-proof performance of nonmetallic or composite duct material shall comply with the design requirements and the current relevant national standards. 5.1.4 The making method of nonmetallic or composite duct shall be determined according to the connection type of air duct. The connection type and application scope of nonmetallic or composite duct shall be in accordance with those specified in Table 5.1.4. 5.2.3 The air duct bonding and forming shall meet the following requirements. 5.2.5 The strengthening and guide vane installation shall meet the following requirements. 5.3 Glass Fiber Composite Duct and Fittings Making 5.3.1 The glass fiber composite duct and fittings shall be made according to the following procedures (Figure 5.3.1). 5.3.5 The air duct strengthening and guide vane installation shall meet the following requirements.

6 Air Valve and Components Making

6.1 General Requirements 6.1.1 The materials for making air valve and components shall meet the requirements of design and relevant technical documents. 6.1.2 The finished air valve and components in use shall have acceptable quality certificates. 6.2 Air Valve 6.2.1 The quality of finished air valve shall meet the following requirements. 6.2.4 The fire valve and smoke discharge valve (smoke vent) shall meet the requirements of the relevant national current technical standards on fire protection products. Operation test shall be carried out on the actuating mechanism and the test result shall meet the requirements of product specifications. 6.3 Hood and Cowl 6.3.1 The hood and cowl shall be made according their types and service requirements. After sampling the selected materials based on the construction drawing, they may be prepared and processed by biting and welding. The making method may be in accordance with the requirements of Chapter 4 in this code. 6.4 Air Opening 6.4.1 The finished air opening shall have sound construction and smooth outside external surface; its vane shall be distributed uniformly without consistent color and free from scratch and deformation. Moreover, it shall meet the requirements of product technology standards. Its surface shall be subject to anti-corrosive treatment and shall meet the design and service requirements. The air opening shall be able to rotate flexibly and reliably. After positioning, it shall be free from any looseness.

7 Making and Installation of Trestle and Hanger

7.1 General Requirements 7.1.1 The fixing mode of trestle and hanger and the use of fittings shall meet the design requirements and shall meet the following requirements. 7.1.2 The embedded parts of trestle and hanger shall be correctly, firmly and reliably positioned. The embedded structure shall be de-rusted and degreased and shall not be painted. The exposed part shall be subject to anti-corrosive treatment. 7.1.4 The finished product protection measures for the making and installation of trestle and hanger shall cover the following items. 7.2 Trestle and Hanger Making 7.2.1 Before trestle and hanger making, the following construction requirements shall be met. 7.2.3 The type of trestle and hanger shall be determined according to the building structure and fixing position, and shall meet the design requirements. 7.3 Trestle and Hanger Installation 7.3.1 Before trestle and hanger installation, the following construction requirements shall be met. 7.3.2 The trestle and hanger be installed according to the following procedures (Figure 7.3.2). Figure 7.3.2 Trestle and Hanger Installation Procedures 7.3.3 The type, specification and position of embedded parts shall meet the design requirements and shall be cast into a whole body with structure. 7.5 Quality Inspection 7.5.1 The quality of trestle and hanger may be inspected according to those specified in Table 7.5.1.

8 Air Duct and Components Installation

8.1 General Requirements 8.1.1 Before air duct and components installation, the following construction requirements shall be met. 8.1.2 When the air duct crosses fire-proof and explosion-proof floor slab or wall to be enclosed, steel embedded duct or protective sleeve with wall thickness not less than 1.6mm shall be arranged. Incombustible flexible material with no harm on human body shall be applied between air duct and protective sleeve for blockage. 8.1.4 The sealing material connected with air duct shall be selected according to the temperature of transmission medium and shall meet the function requirements of air duct system; moreover, its fire- proof performance shall meet the design requirements. 8.1.9 Rain-proof device shall be arranged where the air duct projects out of the roof. Anti-seepage measures shall be taken at the connection of air duct and roof (Figure 8.1.9). 8.1.10 The installation position of air supply and return openings of fan coil shall meet the design requirements. Where there is no requirement in the design, the spacing between air supply and return openings in the same plane should not be less than 1200mm. 8.3 Nonmetallic or Composite Air Duct Installation 8.3.1 The nonmetallic or composite air duct shall be installed according to the following procedures (Figure 8.3.1). 8.3.2 Before air duct installation, its installation position shall be measured and located to determine the center line of pipeline. 8.3.5 The nonmetallic duct connection shall meet the following requirements. 8.3.6 Socket step bonding, inserter connection or flange connection should be adopted for composite duct. The air duct shall be firmly and tightly connected and shall meet the following requirements. 8.7 Installation of Muffler, Static Pressure Box, Filter and Heater in Air Duct 8.7.1 During muffler and static pressure box installation, trestle and hanger shall be arranged separately and shall be firmly fixed. 8.7.2 Where the muffler and static pressure box are connected with metal duct, the flange shall match.

9 Air Handling Equipment Installation

9.1 General Requirements 9.1.1 Before the installation of air handling equipment, the following requirements shall be met. 9.1.2 The transportation and hoisting of air handling equipment shall meet the following requirements. 9.1.4 Finished product protection measures of air handling equipment installation shall include the following contents. 9.2 Air Conditioning Terminal Device Installation 9.2.1 Air conditioning terminal device installation includes the installation of fan coil unit, induction unit, VAV air conditioning terminal device and direct-evaporating indoor air conditioner. 9.2.2 Air conditioning terminal device installation shall be carried out according to the following procedures (Figure 9.2.2). 9.4.4 Where hoisting installation is adopted for equipment, the hanger and damping device shall meet the requirements of the design and relevant technical documents. 9.4.5 The site assembly of central-station air handling unit and heat recovery device shall be conducted by the supplier; the air leakage ratio test shall be carried out after assembling and the air leakage ratio shall meet the requirements of the current national standard “Central-station Air Handling Units” GB/T 14294. ......

Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Image 1     Image 2     Image 3     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of English version of GB 50738-2011 be delivered?Answer: The full copy PDF of English version of GB 50738-2011 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB 50738-2011_English with my colleagues?Answer: Yes. The purchased PDF of GB 50738-2011_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB 50738-2011 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of GB 50738-2011?

A step-by-step guide to download PDF of GB 50738-2011_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB 50738-2011".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9