Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

HYT147.6-2013 English PDF

US$1429.00 · In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email.
HYT147.6-2013: Code of practice for marine monitoring technology. Part 6: Marine hydrology, meteorology and sea ice
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
HY/T 147.6-20131429 Add to Cart 8 days Code of practice for marine monitoring technology. Part 6: Marine hydrology, meteorology and sea ice Valid

Similar standards

GB/T 33673   DZ/T 0175   HY/T 147.2   HY/T 147.3   HY/T 147.1   

Basic data

Standard ID: HY/T 147.6-2013 (HY/T147.6-2013)
Description (Translated English): Code of practice for marine monitoring technology. Part 6: Marine hydrology, meteorology and sea ice
Sector / Industry: Marine Industry Standard (Recommended)
Classification of Chinese Standard: A45
Classification of International Standard: 07.060
Word Count Estimation: 58,524
Quoted Standard: GB/T 12763.2-2007; GB/T 12763.3-2007; GB/T 14914-2006; GB/T 24558;
Regulation (derived from): Industry standard filing Notice 2013 No. 8 (No. 164 overall)
Issuing agency(ies): State Oceanic Administration
Summary: This standard specifies: oceanographic, meteorological and sea ice monitoring program the main content and methods, for each monitoring tools scope, technical requirements, monitoring and data processing steps put forward specific requirements. This stand

HYT147.6-2013: Code of practice for marine monitoring technology. Part 6: Marine hydrology, meteorology and sea ice


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Code of practice for marine monitoring technology.Part 6.Marine hydrology, meteorology and sea ice ICS 07.060 A45 People's Republic of China Marine Industry Standard Marine monitoring technical regulations Part 6.Marine Hydrology, Meteorology and Sea Ice Released on.2013-04-25 2013-05-01 Implementation Issued by the State Oceanic Administration

Table of contents

Foreword Ⅰ 1 Scope 1 2 Normative references 1 3 General provisions 1 4 Water temperature monitoring 2 5 Seawater salinity monitoring---thermo-salt depth profiler method 5 6 Ocean current monitoring 6 7 Wave monitoring 15 8 Water level monitoring 21 9 Monitoring of Marine Meteorological Elements-Automatic Weather Station Method 25 10 Sea ice element monitoring 27 Appendix A (Normative Appendix) Record Sheet 36 Table A.1 Work Record Form---Temperature Salt Deep Profiler Method 37 Table A.2 Water temperature data record table 38 Table A.3 Work Record Table---Acoustic Doppler Velocity Profiler Method 39 Table A.4 Current profile data record table 40 Table A.5 Work Record Sheet---Point Acoustic Current Meter Method 41 Table A.6 Ocean Current Data Record Table 42 Table A.7 Work Record Sheet---Self-contained Electromagnetic Current Meter Method 43 Table A.8 Work Record Sheet---Sit-bottom Acoustic Wavemeter Method 44 Table A.9 Wave data record table 45 Table A.10 Work Record Form---Water Level Gauge Method 46 Table A.11 Water level data record table 47 Table A.12 Meteorological monitoring data record table 48 Table A.13 Sea ice temperature data record table 49 Table A.14 Sea ice uniaxial compressive strength data record table 50 Table A.15 Maximum horizontal scale data record table 51 Table A.16 Drifting data record table 52 Table A.17 Fixed ice data record table 53 Table A.18 Sea ice data record table 54

Foreword

HY/T 147 "Marine Monitoring Technical Regulations" is divided into seven parts. ---Part 1.Sea water; ---Part 2.Sediment; ---Part 3.Organisms; ---Part 4.Ocean atmosphere; ---Part 5.Marine ecology; ---Part 6.Marine Hydrology, Meteorology and Sea Ice; ---Part 7.Satellite remote sensing technology methods. This part is part 6 of HY/T 147. This section was drafted in accordance with the rules given in GB/T 1.1-2009. This part was proposed by the National Marine Environmental Monitoring Center. This part is under the jurisdiction of the National Marine Standardization Technical Committee (SAC/TC283). Drafting organizations of this section. National Marine Environmental Monitoring Center, North Sea Environmental Monitoring Center of State Oceanic Administration, East China Sea Environmental Monitoring Center of State Oceanic Administration Monitoring Center, South China Sea Environmental Monitoring Center of State Oceanic Administration. The main drafters of this section. Han Gengchen, Zhang Shufang, Ma Yongan, Jiang Wenbo, Hu Zhanming, Liu Yongqing, Zhao Qian, Song Lina, Chen Yuan, Sha Wei, Ye Qin, Cui Wenlin, Gao Lei, Zeng Jiping, Li Baolei, Wang Xing, Ju Lian, Cheng Xiangsheng, Lu Shiliang, Zhou Huiyun, Ouyang Shuiqing, Liang Xinyou, Jiang Zaishu, Miao Changmei, Huang Chuguang, Hu Xisheng, Gao Kewen, Sun Lu. Marine monitoring technical regulations Part 6.Marine Hydrology, Meteorology and Sea Ice

1 Scope

This part of HY/T 147 specifies the main content and methods of marine hydrology, meteorology and sea ice monitoring projects. The scope of application, technical requirements, monitoring procedures and data processing put forward specific requirements. This part is applicable to the monitoring of marine hydrology, meteorology and sea ice elements in coastal, offshore, open sea and ocean waters.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 12763.2-2007 Ocean Survey Specification Part 2.Ocean Hydrological Observation GB/T 12763.3-2007 Marine Survey Specification Part 3.Marine Meteorological Observation GB/T 14914-2006 Seashore Observation Specification GB/T 24558 Acoustic Doppler Velocity Profiler

3 General rules

3.1 Monitoring items Marine hydrology, meteorology and sea ice monitoring projects include the following. a) Marine hydrology. water temperature, salinity, ocean currents, waves and water levels; b) Marine meteorology. sea surface wind, air pressure, sea surface air temperature, relative humidity, precipitation, solar radiation, effective sea visibility, clouds, sky Qi phenomenon; c) Sea ice. ice volume, concentration, temperature, uniaxial compressive strength, maximum horizontal scale of floating ice, drifting speed and direction of floating ice, fixed ice Width and edge line of ice zone; d) The specific monitoring elements each time should be determined according to the requirements of the monitoring task. 3.2 Matters needing attention The following points should be paid attention to during the monitoring of marine hydrology, meteorology and sea ice projects. a) Fully inspect the vessels and equipment used before monitoring to ensure normal operation; b) Test the voltage of the instrument before monitoring to ensure that the power supply requirements during the monitoring period are met; c) Calibrate the internal time of the instrument before monitoring; d) The instruments and equipment used for monitoring shall meet the technical requirements for monitoring of various elements and shall be within the validity period of the verification; e) When monitoring the same elements at multiple stations simultaneously, the same type of instrument should be used; if different types of instruments are selected, different types of instruments should be used. The resolution of the detector and the consistency of the measurement results are compared; f) Before and after each measurement, the instrument should be verified or used for on-site comparison with other instruments of the same accuracy level; g) The monitoring data should be downloaded immediately after each measurement is completed, and the original data should be stored and analyzed. If the data is found to be abnormal, it should be retested immediately;
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of HYT147.6-2013_English be delivered?

Answer: Upon your order, we will start to translate HYT147.6-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of HYT147.6-2013_English with my colleagues?

Answer: Yes. The purchased PDF of HYT147.6-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.