Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GBZ32585-2016 English PDF

US$279.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GBZ32585-2016: Guide for model acceptance tests of 1000 MW class Francis hydraulic turbines
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/Z 32585-2016279 Add to Cart 3 days Guide for model acceptance tests of 1000 MW class Francis hydraulic turbines Valid

Similar standards

GB/T 14478   GB/T 15468   GB/T 14478   GB/Z 32583   GB/T 32584   

Basic data

Standard ID: GB/Z 32585-2016 (GB/Z32585-2016)
Description (Translated English): Guide for model acceptance tests of 1000 MW class Francis hydraulic turbines
Sector / Industry: National Standard
Classification of Chinese Standard: K55
Classification of International Standard: 27.14
Word Count Estimation: 14,197
Date of Issue: 2016-04-25
Date of Implementation: 2016-11-01
Regulation (derived from): National Standard Announcement No
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

GBZ32585-2016: Guide for model acceptance tests of 1000 MW class Francis hydraulic turbines

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guide for model acceptance tests of 1000 MW class francis hydraulic turbines ICS 27.140 K55 People's Republic of China national standardization of technical guidance documents 1000MW Francis turbine Model Acceptance Test Guidelines Posted on.2016-04-25 2016-11-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Foreword Ⅲ Introduction IV 1 Scope 1 2 Normative references 1 3 Terms, definitions and symbols 1 4 hydraulic performance 4 4.1 Hydraulic efficiency conversion 4 4.2 flow, head and power conversion 4 4.3 run-off test 4 4.4 cavitation performance and observation test 5 4.5 pressure pulsation performance test 5 4.6 Extending the scope of the operation of the test 6 5 Test implementation 7 5.1 pairs of test bench requirements 7 5.2 model size and test conditions 7 6 models on the same stage contrast test 7 6.1 Overview 7 6.2 The implementation of the same stage comparison test 7 6.3 Model Turbine Requirements 7 6.4 Test on the same stage 8 6.5 Test report on the same stage 8 7 model acceptance test 8 7.1 Overview 8 7.2 model acceptance test content 9 7.3 Model Geometrical Inspection 9 7.4 Model Acceptance Test Logs and Minutes 9 7.5 Final Model Test Report 9

Foreword

This instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009. This guidance document is proposed by China Electrical Equipment Industry Association. This Guidance Document is organized by the National Committee for Standardization of Hydraulic Turbines (SAC/TC175). The main drafting of the guidance of technical documents. Harbin Institute of Electrical Engineers, China Institute of Water Resources and Hydropower Research, Dongfang Electric Corporation Dongfang Electric Machinery Co., Ltd., China Three Gorges Corporation, China Construction Group East China Survey and Design Institute Co., Ltd., Yangtze Survey Regulations Planning Design Research Co., Ltd. The main drafters of this technical guidance document. Zhao Yue, Meng Xiaochao, Wang Yalin, Dai Jiang, Li Shengbing, Qin Daqing, Gui Shaobo, Liu Dengfeng, Fu Changhong, Hu Jiang Yi.

Introduction

The overall level of large-scale hydropower equipment manufacturing industry continues to increase, stand-alone capacity continues to grow, stand-alone capacity of 1000MW hydroelectric generating units Work has been staged results, the need to organize the development of standards, production for the crew to provide technical preparation. This Guidance Document is based on the research, summary and summary of the model tests and operation experience of the existing large hydro turbines under construction Basis, according to the relevant current international, national and industry standards or norms for preparation. The basic principles for the compilation of this technical guidance document are to highlight the characteristics and important concerns of a 1000MW turbine. Stage in the development phase of the product guidance document. 1000MW Francis turbine Model Acceptance Test Guidelines

1 Scope

This Guidance Document provides for the determination of whether the value of the contractual guarantee for the main hydraulic properties has been met Flow turbine model acceptance test. This Guidance Document is applicable to the same-station comparison test of 1000MW Francis turbine model under laboratory conditions And model acceptance test. The 1000MW Francis turbine of this Guidance Document refers to the rated power (or nameplate power) of the turbine rated power (Or nameplate power) for the 862MW ~ 1100MW, and the rated head range of 100m ~ 300m Francis turbine. As long as the structure or part of the machine does not affect the performance of the model or the relationship between the model and the prototype, Does not involve the detailed structure of the machine, nor the mechanical properties of the machine part.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. Hydraulic turbine, accumulator pump and pump turbine flow passage components - Technical conditions GB/T 15613.1-2008 Turbine, storage pump and pump turbine model acceptance test Part I. General provisions (IEC 60193.1999, NEQ) GB/T 15613.2-2008 Turbine, storage pump and pump turbine model acceptance test - Part II. Conventional hydraulic performance test Test (IEC 60193.1999, NEQ) GB/T 15613.3-2008 Turbine, storage pump and pump turbine model acceptance test - Part III. Auxiliary performance test (IEC 60193.1999, NEQ) 3 Terms, definitions and symbols GB/T 15613.1-2008 ~ GB/T 15613.3-2008 defined terms, definitions and symbols apply to the guidance of technical documents, A few additional terms are listed below, some of which are related to the amount of vibration shown in Figure 1. 3.1 Model on the same stage contrast test modelcomparetestatthesameteststand In the bidding process of power station turbine, according to the buyer's requirement, in order to evaluate the hydraulic performance level of model turbine for bidding by different sellers, The same test bench on the side of the model turbines provided by the seller of the turbine performance tests conducted by the third party on the test results Compare 3.2 Model Acceptance Test modelacceptancetest After the contractor of the hydroelectric station sign the contract with the buyer, the final design of the model for the seller of the turbine on the seller's test bed or a designated third-party test Hydraulic test of the platform.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GBZ32585-2016_English be delivered?

Answer: Upon your order, we will start to translate GBZ32585-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GBZ32585-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GBZ32585-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.