Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 8223.1-2025 English PDF

US$379.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 8223.1-2025: Value engineering - Part 1: General terms
Status: Valid

GB/T 8223.1: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 8223.1-2025379 Add to Cart 4 days Value engineering - Part 1: General terms Valid
GB/T 8223.1-2009189 Add to Cart 3 days Value engineering -- Part 1: General terms Valid
GB/T 8223-1987199 Add to Cart 2 days Value engineering. General terms and work program Obsolete

Similar standards

RB/T 033   GB/T 37595   GB/T 29475   GB/T 37507   GB/T 45259   GB/T 8223.2   

Basic data

Standard ID: GB/T 8223.1-2025 (GB/T8223.1-2025)
Description (Translated English): Value engineering - Part 1: General terms
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: A02
Classification of International Standard: 01.040.03
Word Count Estimation: 18,174
Date of Issue: 2025-04-25
Date of Implementation: 2025-11-01
Older Standard (superseded by this standard): GB/T 8223.1-2009
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 8223.1-2025: Value engineering - Part 1: General terms

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 01.040.03 CCSA02 National Standard of the People's Republic of China Replaces GB/T 8223.1-2009 Value engineering part 1.general terms Released on 2025-04-25 2025-11-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of contents

Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Basic terms 1 4 Functional terms 1 5 Cost terms 3 6 Organizational Management Terms 3 Appendix A (Informative) Value Engineering Concept Relationship Diagram 5 References 7 Index 8 Figure A.1 Relationship between the basic concepts of value engineering 5 Figure A.2 Relationships between related concepts involving functions 5 Figure A.3 Relationships between relevant concepts involving costs 5 Figure A.4 Relationships between relevant concepts related to organizational management 6

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is Part 1 of GB/T 8223 Value Engineering. GB/T 8223 has been published in the following parts. --- Part 1.General terms. This document replaces GB/T 8223.1-2009 "Value Engineering Part 1.Basic Terms" and is consistent with GB/T 8223.1-2009. In addition to structural adjustments and editorial changes, the main technical changes are as follows. --- Changed the value (see 3.1, 2.3 of the.2009 edition), value engineering (see 3.2, 2.1 of the.2009 edition), value engineering objects (see 3.3, 2.2 of the.2009 edition), basic functions (see 4.2, 3.2 of the.2009 edition), auxiliary functions (see 4.3, 3.3 of the.2009 edition), Unnecessary functions (see 4.6, 3.7 of the.2009 edition), functional analysis (see 4.10, 3.10 of the.2009 edition), life cycle costs (see 5.2, 4.1 of the.2009 edition), Functional Cost (see 5.3, 4.2 of the.2009 edition), Value Engineering Working Group (see 6.4, 5.3) of the definition; --- Changed the term "functional target cost" to "target cost" and changed the definition accordingly (see 5.4, 4.2.2 of the.2009 edition); --- Deleted solution innovation (see 2.4 of the.2009 edition), alternative solutions (see 2.5 of the.2009 edition), usage functions (see 3.4 of the.2009 edition), taste function (see 3.5 of the.2009 edition), necessary function (see 3.6 of the.2009 edition), insufficient function (see 3.8 of the.2009 edition), redundant functions (see 3.9 of the.2009 edition), function definitions (see 3.10.1 of the.2009 edition), function arrangements (see 3.10.2 of the.2009 edition), functional measurement (see 3.10.3 of the.2009 edition), current cost of function (see 4.2.1 of the.2009 edition), price The terms and definitions of value engineering work procedures (see 5.1 of the.2009 edition) and value engineer (see 5.2 of the.2009 edition); --- Added undesirable functions (see 4.7), full-time functions (see 4.8), one-time functions (see 4.9), functional requirements analysis (see 4.11), Technical function analysis (see 4.12), functional structure (see 4.13), functional carrier (see 4.14), functional performance specification (see 4.15), function Energy demand expression (see 4.16), cost (see 5.1), value engineering work plan (see 6.1), value engineering objectives (see 6.2), value Engineering projects (see 6.3), value engineering project leader/host (see 6.5), design by objectives (see 6.6), design by cost (see 6.7) and their definitions. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document is proposed and coordinated by the China National Institute of Standardization. This document was drafted by. China National Institute of Standardization, China Aviation Technology Research Institute, Siemens (China) Co., Ltd., Beijing Aviation Industry Corporation University of Aeronautics and Astronautics. The main drafters of this document are. Du Xiaoyan, Che Di, Pang Zhenghu, Cao Lili, Ding Shuwei, Liu Yunhe, Yi Tingting, Liu Jihong and Hu Guanzi. The previous versions of this document and the documents it replaces are as follows. ---First published in 1987 as GB/T 8223-1987 "Basic Terms and General Working Procedures of Value Engineering"; --- In the first revision in.2009, the content of the "Basic Terms" section of GB/T 8223-1987 was revised to GB/T 8223.1- 2009 "Value Engineering Part 1.Basic Terminology"; ---This is the second revision.

Introduction

Value engineering is an organized and creative activity that uses functional and economic methods to maximize the value of Value engineering is usually used in the general management level of an organization and has an important impact on improving organizational efficiency and competitiveness. In order to better promote the understanding of value engineering and technical exchange in organizations, my country has formulated GB/T 8223 "Value Engineering", which is to be It consists of two parts. --- Part 1.General terms. The purpose is to define the general terms and definitions of value engineering. --- Part 2.General working procedures. The purpose is to establish working procedures for the implementation of value engineering and to define the activities at each stage of the working procedures. Provide guidance and advice. Value engineering is based on the concept of value and a function-based approach. Therefore, it is necessary to define the general terminology and definition of value engineering. GB/T 8223.1 has been issued and implemented for more than ten years. During this period, value engineering methods and technologies have made great progress. The definitions of these terms have changed with the development of practice and cognition, and some new terms have been generated. In view of this, GB/T 8223.1 is revised. In addition, to facilitate the understanding of the relationship between common value engineering terms, Appendix A of this document provides a conceptual relationship diagram. Value engineering part 1.general terms

1 Scope

This document defines the basic terminology of value engineering as well as terms and definitions related to function, cost, and organizational management. This document applies to value engineering activities.

2 Normative references

This document has no normative references.

3 Basic terminology

3.1 value The ratio of the function (4.1) possessed by an object (3.3) to the cost (5.1) required to obtain that function (4.1). 3.2 Value Engineering Organized and creative activity that maximizes the value (3.1) of an object (3.3) using functional and economic means Note 1 to entry. Value engineering activities are carried out by the value engineering working group (6.4) and outlined in the value engineering work plan (6.1). Note 2 to entry. The value of an object (3.3) such as a product, process or service is increased by achieving the required functionality (4.1), Reliability, safety, etc. 3.3 Object subject Objects for which value engineering (3.2) is applied. Note. The value engineering object (referred to as "object") mainly refers to products, processes, services, systems or their components.

4 Functional terms

4.1 Function Object (3.3) The utility or property of an object that satisfies a need. Note. Functions are often expressed in abstract form (e.g., as a non-specific two-word abstract expression consisting of a verb and a noun) without a solution. 4.2 basic function Function (4.1) that realizes the purpose or intent of an object (3.3) 4.3 secondaryfunction Supports the functions (4.1) implemented by the basic functions (4.2).
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 8223.1-2025_English be delivered?

Answer: Upon your order, we will start to translate GB/T 8223.1-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 8223.1-2025_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 8223.1-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 8223.1-2025?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 8223.1-2025 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.