Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 7679.3-2023 English PDF

US$1489.00 · In stock
Delivery: <= 9 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 7679.3-2023: Mining machinery terminology - Part 3: Winding equipment
Status: Valid

GB/T 7679.3: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 7679.3-20231489 Add to Cart 9 days Mining machinery terminology - Part 3: Winding equipment Valid
GB/T 7679.3-2005RFQ ASK 8 days Mining machinery terminology -- Part 3: Winding equipment Obsolete
GB/T 7679.3-1987RFQ ASK 6 days Mining machinery vocabulary--Winding equipment Obsolete

Similar standards

GB/T 4652   GB/T 13344   JB/T 9023.1   GB/T 7679.5   GB/T 7679.4   GB/T 7679.2   

Basic data

Standard ID: GB/T 7679.3-2023 (GB/T7679.3-2023)
Description (Translated English): Mining machinery terminology - Part 3: Winding equipment
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: D93
Classification of International Standard: 73.100.01
Word Count Estimation: 74,794
Date of Issue: 2023-12-28
Date of Implementation: 2024-07-01
Older Standard (superseded by this standard): GB/T 7679.3-2005
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 7679.3-2023: Mining machinery terminology - Part 3: Winding equipment

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 73:100:01 CCSD93 National Standards of People's Republic of China Replace GB/T 7679:3-2005 Mining Machinery Terminology Part 3: Lifting Equipment Published on 2023-12-28 2024-07-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration Committee

Table of contents

Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 3:1 Classification 1 3:1:1 Classification by drum diameter and use 1 3:1:2 Classification by main structural type 1 3:2 Common technical terms 3 3:3 Mine hoist and mining hoisting winch 7 3:3:1 Winding type 7 3:3:2 Structural terminology of winding mine hoists and mining hoisting winches 9 3:3:3 Friction type 12 3:3:4 Friction mine hoist structural terminology 13 3:3:5 Hydraulic explosion-proof mine hoist and mining hoisting winch 14 3:3:6 Disc brake mining hoisting winch 15 3:3:7 Block brake mine hoist and mining hoist winch 16 3:3:8 Belt brake mining hoisting winch 17 3:3:9 Common structural terms 17 3:4 Well sinking winch 35 3:4:1 Category 35 3:4:2 Common structural terms 38 3:5 Raking winch 39 3:5:1 Classification 39 3:5:2 Basic terminology 40 3:5:3 Structural terminology 41 3:6 Scheduling winch 42 3:7 Shunting winch 43 3:7:1 Classification 43 3:7:2 Structural terminology 43 3:8 Pneumatic winch 45 3:8:1 Category 45 3:8:2 Basic terminology 46 3:8:3 Structural terminology 46 3:9 Return column winch 46 3:10 Swimming winch 47 3:10:1 Category 47 3:10:2 Structural terminology 48 3:11 Infinite rope winch 49 3:12 Opening and closing damper winch 50 3:13 Transport winch 51 3:13:1 Category 51 3:13:2 Structural terminology 52 3:14 Auxiliary equipment 52 Index 57

Foreword

This document complies with the provisions of GB/T 1:1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting: This document is Part 3 of GB/T 7679 "Mining Machinery Terminology": GB/T 7679 has released the following parts: ---Part 1: Mining equipment; ---Part 2: Loading equipment; ---Part 3: Lifting equipment; ---Part 4: Mining transportation equipment; ---Part 5: Crushing and grinding equipment; ---Part 6: Mining screening equipment; ---Part 7: Washing equipment; ---Part 8: Roasting equipment: This document replaces GB/T 7679:3-2005 "Mining Machinery Terminology Part 3: Lifting Equipment" and is consistent with GB/T 7679:3-2005 In addition to structural adjustments and editorial changes, the main technical changes are as follows: a) "Permanent magnet motor built-in single rope winding mine hoist and mining hoisting winch" (see 3:3:1:4), "Mine hoisting auxiliary "Elevator" (see 3:3:1:5) terms and definitions; b) Added the term and definition of “disc brake mining hoisting winch” (see 3:3:6); c) "Speed limiting cam plate" (see 2:3:6:5:5 of the:2005 version), "micro drag device" (see 2:3:6:8 of the:2005 version), "elasticity "Spring-based coaxial reducer" (see 2:3:6:9 of the:2005 edition) terms and definitions; d) Added the terms and definitions of “proportional relief valve” (see 3:3:9:2:5) and “servo valve” (see 3:3:9:2:6); e) Added “signal” (see 3:3:9:12:1) and “middle section (horizontal) indication signal” (see 3:3:9:12:2), "Promotion category signal" (see 3:3:9:12:3), "Maintenance signal" (see 3:3:9:12:4), "Work execution signal" (see 3:3:9:12:5), "accident signal" (see 3:3:9:12:6), "standby signal" (see 3:3:9:12:7) terms and definitions; f) The "locking rope mechanism" (see 3:3:9:13:1), "locking force" (see 3:3:9:13:2), and "synchronous lifting" in the hydraulic rope adjustment device of the hoist are added: "L" (see 3:3:9:13:3), "Cross-locking rope control" (see 3:3:9:13:4), "Step-by-step rope adjustment" (see 3:3:9:13:5), "Max: Rope adjustment distance” (see 3:3:9:13:6) terms and definitions; g) “Intelligent upper-level monitoring system” (see 3:3:9:14:1) and “desktop” (see 3:3:9:14:2), "embedded" (see 3:3:9:14:3), "cabinet type" (see 3:3:9:14:4), "original complete computer" (see 3:3:9:14:5) Terms and definitions; h) “Low-voltage variable frequency drive” (see 3:3:9:15:1) and “medium-voltage variable frequency drive” (see 3:3:9:15:2), "high voltage variable frequency drive" (see 3:3:9:15:3), "feedback braking" (see 3:3:9:15:4), "safety circuit" (see 3:3:9:15:5), "control equipment" (see 3:3:9:15:6), "speed adjustment range" (see 3:3:9:15:7), "control accuracy" (see 3:3:9:15:8) Phrases and definitions: Please note that some content in this document may be subject to patents: The publisher of this document assumes no responsibility for identifying patents: This document is proposed by China Machinery Industry Federation: This document is under the jurisdiction of the National Mining Machinery Standardization Technical Committee (SAC/TC88): This document was drafted by: Luoyang Mining Machinery Engineering Design and Research Institute Co:, Ltd:, CITIC Heavy Machinery Co:, Ltd:, Jinzhou Mining Machinery (Group) Co:, Ltd:, Shanxi Xinfusheng Machinery Manufacturing Co:, Ltd:, Hebi Wanfeng Mining Machinery Manufacturing Co:, Ltd: The main drafters of this document: Hu Xilei, Xu Yongfu, Wang Shuang, Li Jinwei, Zhu Youliang, Wang Zhengguo, Guo Kongfei, Pang Wanxian, Gao Zhikang: This document was first published in 1987, revised for the first time in:2005, and this is the second revision:

Introduction

Terminology is a collection of titles used to express concepts in a specific subject area: It is one of the basic elements of standards and is an important part of scientific research, teaching, and technology: The key to a unified concept for activities such as technical exchanges and cooperation: GB/T 7679 "Mining Machinery Terminology" is based on the current situation of my country's mining machinery industry: A set of terminology standards for the mining machinery industry compiled based on international standards and advanced foreign standards: The mining machinery industry is for solid raw materials It is one of the important basic industries that provides equipment for the mining and processing of materials, materials and fuels: It covers a wide range of areas and has a wide range of products: According to the mining machinery industry Category, GB/T 7679 consists of the following parts: ---Part 1: Mining equipment: The purpose is to define the terms and definitions of mining machinery and mining equipment: ---Part 2: Loading equipment: The purpose is to define the terms and definitions of loading equipment for mining machinery: ---Part 3: Lifting equipment: The purpose is to define the terms and definitions of mining machinery and mining hoisting equipment: ---Part 4: Mining transportation equipment: The purpose is to define the terms and definitions of mining machinery and mining transport equipment: ---Part 5: Crushing and grinding equipment: The purpose is to define the terms and definitions of mining machinery crushing and grinding equipment: ---Part 6: Mining screening equipment: The purpose is to define the terms and definitions of mining machinery and mining screening equipment: ---Part 7: Washing equipment: The purpose is to define the terms and definitions of mining machinery washing equipment: ---Part 8: Roasting equipment: The purpose is to define the terms and definitions of roasting equipment for mining machinery: Mining Machinery Terminology Part 3: Lifting Equipment

1 Scope

This document defines terms and definitions for mining lifting equipment: This document applies to the design, scientific research, manufacturing, use, teaching, management, publishing, academic exchanges and international trade of mining lifting equipment: field:

2 Normative reference documents

This document has no normative references:

3 Terms and definitions

3:1 Classification 3:1:1 Classification by drum diameter and use 3:1:1:1 mine hoist minehoist The drum diameter is 2m and above: The rotation of the drum drives the lifting container connected to the wire rope to lift or lower people or objects in the mine: Material electromechanical equipment: 3:1:1:2 Mining winch minewinder The drum diameter is less than 2m (excluding 2m): The drum rotation drives the lifting container or auxiliary equipment connected to the wire rope in the mine and tunnel: Or mechanical and electrical equipment for lifting or lowering people or materials and performing operations in the stope: 3:1:1:3 Hoisting winch hoistingwinder A mining winch used to lift or lower people or materials in a mine: 3:1:1:4 auxiliary winch auxiliarywinch Mining winches are used to dispatch vehicles, rake ore rocks, recover pillars, open and close dampers and other auxiliary operations in underground tunnels and stopes: Note: There are mainly types such as dispatching, raking, sinking, returning columns, opening and closing dampers, swimming and transportation: 3:1:2 Classification according to main structural types 3:1:2:1 Classification according to working mode of wire rope 3:1:2:1:1 Winding One end of the wire rope is fixed and wound on the drum, and the other end goes around the sky wheel to suspend and lift the container: The rotation of the drum is used to lift the container: Raising or lowering hoist or lifting winch:
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 7679.3-2023_English be delivered?

Answer: Upon your order, we will start to translate GB/T 7679.3-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 9 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 7679.3-2023_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 7679.3-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 7679.3-2023?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 7679.3-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.