Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 6115.4-2014 English PDF

US$1079.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 6115.4-2014: Series capacitors for power systems -- Part 4: Thyristor-controlled series capacitors
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 6115.4-20141079 Add to Cart 7 days Series capacitors for power systems -- Part 4: Thyristor-controlled series capacitors Valid

Similar standards

GB/T 11024.4   GB/T 11024.2   GB/T 8286   GB/T 4787.1   GB/T 6115.2   GB/T 3667.1   

Basic data

Standard ID: GB/T 6115.4-2014 (GB/T6115.4-2014)
Description (Translated English): Series capacitors for power systems -- Part 4: Thyristor-controlled series capacitors
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: K42
Classification of International Standard: 31.060.70
Word Count Estimation: 49,488
Date of Issue: 7/24/2014
Date of Implementation: 1/22/2015
Quoted Standard: GB 311.1; GB/T 311.2; GB 1094.6-1996; GB/T 1094.6-2011; GB/T 2423.2; GB/T 2423.3; GB/T 2900.16; GB/T 6115.1-2008; GB/T 6115.2-2002; GB/T 6115.3-2002; GB/T 7354; GB/T 11287; GB/T 14537; GB/T 14598.3; GB/T 20995-2007; GB 1094.1-1996; GB/T 2421.1; GB/T 16927
Adopted Standard: IEC 60143-4-2010, MOD
Regulation (derived from): National Standards Bulletin No. 19, 2014
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies a series capacitor used in series with the thyristor controlled transmission line (referred to as the TCSC) design and testing of the device. This standard applies to TCSC thyristor valve, capacitors, reactors rated parameters and

GB/T 6115.4-2014: Series capacitors for power systems -- Part 4: Thyristor-controlled series capacitors


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Series capacitors for power systems Part 4. Thyristor-controffed series capacitors ICS 31.060.70 K42 National Standards of People's Republic of China Series capacitors for power systems Part 4. Thyristor controlled series capacitor Part 4. Thyristor-controledseriescapacitors (IEC 60143-4.2010, MOD) Issued on. 2014-07-24 2015-01-22 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅴ 1 Scope 1 2 Normative references 1 3 acronyms, terms and definitions 2 3.1 Abbreviations 2 3.2 Terms and Definitions 2 4 Run 6 4.1 Overview 6 4.2 TCSC characteristics 8 4.3 operating range 9 4.4 Reactive Power Rating 10 4.5 power oscillation damping (POD) 10 4.6 Mitigating resonance (SSR) 10 4.7 Harmonic 10 4.8 multi-circuit control circuit TCSC interaction 11 4.9 operating range, over-voltage and duty cycle 11 4.9.1 operating range 11 4.9.2 transient overvoltage 11 4.9.3 duty cycle 11 5 valve system 11 5.1 Trigger System 11 5.2 System Requirements 12 5.3 Normal operating conditions 13 5.4 System Fault trigger valve 13 5.5 Characteristics of small line current 13 5.6 Monitoring 13 6 Rating 13 6.1 General 13 Rating 6.2 capacitor 13 6.3 Reactor Rating 14 6.4 14 ratings thyristor valve 6.4.1 Flow capacity 14 6.4.2 pressure capacity 14 6.5 variable resistor 16 Rating 6.6 insulation level and creepage distance 16 7 Test 16 7.1 General 16 7.2 Test capacitor 17 7.2.1 General requirements 17 7.2.2 Routine tests 17 7.2.3 Type tests 17 7.2.4 Special Test 17 7.3 TCSC Reactor Experiment 18 7.3.1 General requirements 18 7.3.2 Routine tests 18 7.3.3 Type tests 18 7.3.4 Special Test 19 7.4 Test thyristor valve 19 7.4.1 Type Test Guidelines 19 7.4.2 Routine tests 20 7.4.3 Type tests 21 7.5 Protection and Control System Test 27 7.5.1 General requirements 27 7.5.2 Routine tests 28 7.5.3 Type tests 28 7.5.4 Special Test 28 8 Ratings Guide 29 Selecting and running 8.1 General 29 8.2 thyristor controlled series capacitor 30 8.2.1 AC Transmission System 30 8.2.2 TCSC running target 30 8.2.3 TCSC 31 Rating 8.3 thyristor valve 32 8.4 capacitor and reactor 32 8.4.1 capacitor 32 8.4.2 Reactor 32 8.5 rating for the variable resistor 33 cycles between failures 8.6 34 valve cooling system 8.7 TCSC control and protection 34 8.7.1 Control 34 8.7.2 protection 36 8.7.3 Monitoring and recording 37 8.8 Test before commissioning and commissioning test 37 8.8.1 Overview 37 8.8.2 before the commissioning test 38 8.8.3 Test station level 38 8.8.4 Commissioning (live) Test 38 Appendix A (informative) of this section with IEC 60143-4. structural changes in 2010 compared to 40 References 42 Typical terms 6 Figure 1 TCSC device Figure 2 TCSC sub-paragraph 7 Figure 3 TCSC control angle and the conduction angle related to the steady-state waveform 8 Figure 4 λ = 2.5 when, according to the formula (1) obtained in the apparent steady-state reactance characteristic 9 Figure 5 POD and TCSC operating range SSR when Example 9 Figure 6 Valve base electronics unit (VBE) 12 Figure 7 an electronic circuit valve (VE) 12 Figure 8 TCSC thyristor valve voltage 15 A typical block diagram of the control and protection system of FIG. 9 TCSC real-time simulation environment 29 FIG. 10 TCSC operating range of the sample 31 Table 1 Relationship between peak voltage and root mean square value of 7 Table 2 External (outside the region) permanent fault occurs when a typical duty cycle of 33 faults Table 3 Internal (district) single-phase fault transient fault typical work cycle 33 Table 4 Internal (district) single-phase permanent fault occurs when a typical fault duty cycle 33 Table A.1 This section of IEC 60143-4. reg number 2010 40 control cases

Foreword

GB/T 6115 "Series capacitors for power systems" is divided into four parts. --- Part 1. General; --- Part 2. Protective equipment for series capacitor banks; --- Part 3. Internal fuses; --- Part 4. Thyristor controlled series capacitor. This section GB/T 46115 Part of. This section drafted in accordance with GB/T 1.1-2009 given rules. This section uses redrafted law revision using IEC 60143-4.2010 "Series capacitors for power systems - Part 4. Thyristor controlled Made a series capacitor. " This part of IEC 60143-4.2010, compared with more adjustment in the structure, listed in Appendix A of this part of IEC 60143-4. Article 2010 of chapter numbering control list. Technical differences exist compared to 2010, the terms of these differences has been involved through its outer margins. This portion of the IEC 60143-4 Vertical single-line position (|) were marked. This part of IEC 60143-4.2010 technical differences and their reasons are as follows. --- Increased "resistance capacitor shell burst energy test" in 7.2.4 special test; --- Added missing in the IEC 60143-4 normative references; --- Increase the limit voltage Ulim terms and definitions (see 3.2.34); --- The nominalreactance modify ratedreactance (see 3.2.29); --- Added three abbreviations (see 3.1). MOV. MOV device (MetalOxideVaristor); TCSC. thyristor controlled series capacitor banks (Thyristor-ControledSeriesCapacitorBank); TE. thyristor electronic device (ThyristorElectronics). This section also made the following editorial changes. --- According to the rules GB/T 1.1-2009 given some written format and layout has been modified; --- "This standard" be replaced by "this section"; "." --- With a decimal point instead of the original IEC standard as a decimal comma ","; --- Remove the IEC 60143-4.2010 Foreword; --- Added Appendix A "in this section with IEC 60143-4.2010 compared to structural changes"; --- Modify the IEC 60143-4.2010 in the editorial errors. a) Figure 1 "2 --- switch module or switch-level" and "8 --- when the need for additional switching stage" not shown in the drawings, this section Revised Figure 1, identified in Figure 1 a "2" and "8" (see Figure 1); b) 8.1e) in the "IHM" error, should be "HMI", this section is amended as "HMI". This part is proposed by the China Electrical Equipment Industrial Association. This part of the National Standardization Technical Committee Power capacitor (SAC/TC45) centralized. This section is drafted. Xi'an High Voltage Apparatus Research Institute Co., Ltd., Puri Power Technology Co., Ltd. Xi'an Electric Power Capacitor Limited liability company, Xi'an Electric Power Systems Ltd., Zhejiang Jiang Guirong harmonic level technology limited liability company, limited Guilin Power Capacitor Ltd., Shanghai Siyuan Electric Power Capacitor Co., Ltd., and Shenzhen City Power Technology Co., Ltd., Shenzhen City & Poor's Shun Technology Co., Zi Bleomycin Po Power Capacitor Co., Ltd., Tianjin opened Electric Co., Ltd., Qingdao Hengshun Electric Co., Ltd., Shijiazhuang Development Zone Wave Acer Technology Co., Ltd., Zhejiang Electric Power Company Electric Power Research Institute, Shandong Taikai Power Electronic Co., Ltd. Drafters of this section. Meng Ying, Tian Enwen, Daizhao Bo, sworn room, Zhao Xin, HE tide, Yanhuan Ling, Lin Yue Wang, Liu Jing, Wang Yu Jing, Zhao Liang, Zhou Xiaoqin, Louyan Tao, Liang Chen, Zuo Qiang Lin, Chong Hu, Lu Tao, Zhang Jian call, Ma Feng, high-Yi, the history of the ocean, Jia Baojun, Jinyong Tao, Zhu Wenqing, high-growth country. Series capacitors for power systems Part 4. Thyristor controlled series capacitor

1 Scope

GB/T 6115 provisions of this section apply to the transmission line in series thyristor controlled series capacitor (referred to as the TCSC) devices Design and testing. This section applies to the thyristor valve, capacitors, reactors of TCSC TCSC rated parameters and control characteristics, protection features, cold But the system and the system is running.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB 311.1 insulation coordination - Part 1. Definitions, principles and rules (GB 311.1-2012, IEC 60071-1.2006, MOD) GB/T 311.2 insulation coordination - Part 2. Guidelines for the use (GB/T 311.2-2013, IEC 60071-2.1996, MOD) GB 1094.1-1996 Power transformers - Part 1. General (EQVIEC 60076-1.1993) GB/T 1094.6-2011 Power transformers - Part 6. Reactors (IEC 60076-6.2007, MOD) GB/T 2421.1 electric and electronic products environmental testing Overview and Guide (GB/T 2421.1-2008, IEC 60068-1. 1988, IDT) GB/T 2423.2 Environmental testing for electric and electronic products Part 2. Test methods Test B. Dry heat (GB/T 2423.2- 2008, IEC 60068-2-2.2007, IDT) GB/T 2423.3 Environmental testing for electric and electronic products Part 2. Test methods - Test Cab. Damp heat test (GB/T 2423.3-2006, IEC 60068-2-78.2001, IDT) GB/T 2900.16 Electrotechnical terminology - Power capacitors [GB/T 2900.16-1996, NEQIEC 60050 (436).1990] GB/T 6115.1-2008 Series capacitors for power systems - Part 1. General (IEC 60143-1.2004, MOD) GB/T 6115.2-2002 Series capacitors for power systems - Part 2. Protective equipment for series capacitor banks (IEC 60143- 2.1994, IDT) GB/T 6115.3-2002 Series capacitors for power systems - Part 3. Internal fuses (IEC 60143-3.1998, IDT) GB/T 7354 partial discharge measurements (GB/T 7354-2003, IEC 60270.2000, IDT) GB/T 11287 Electrical relays - Part 21. Vibration measuring relays and protection equipment, shock, bump and seismic tests Section 1. Vibration tests (sinusoidal) (GB/T 11287-2000, IEC 60255-21-1. 1988, IDT) GB/T 14537 and measure impact crash test (GB/T 14537-1993 relays and protection equipment, idt IEC 60255-21- 2. 1988) GB/T 14598.3 Electrical relays - Part 5. Measuring relays and protection equipment insulation coordination requirements and tests (GB/T 14598.3-2006, IEC 60255-5.2000, IDT) GB/T 16927.1 High-voltage test techniques - Part 1. General definitions and test requirements (GB/T 16927.1-2011, IEC 60060-1.2006, MOD) GB/T 17626 (all parts), electromagnetic compatibility test and measurement technology [IEC 61000-4 (alparts)] 1) 1) The addition of the IEC 60143-4 standard for the missing standards, has been transformed into a national standard.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 6115.4-2014_English be delivered?

Answer: Upon your order, we will start to translate GB/T 6115.4-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 6115.4-2014_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 6115.4-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.