GB/T 44680-2024 English PDFUS$289.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 44680-2024: Wind energy generation systems - Technical code of practice for safety evaluation of offshore wind farm Status: Valid
Basic dataStandard ID: GB/T 44680-2024 (GB/T44680-2024)Description (Translated English): Wind energy generation systems - Technical code of practice for safety evaluation of offshore wind farm Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F11 Classification of International Standard: 27.180 Word Count Estimation: 14,172 Date of Issue: 2024-09-29 Date of Implementation: 2025-04-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 44680-2024: Wind energy generation systems - Technical code of practice for safety evaluation of offshore wind farm---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. National Standard of the People's Republic of China ICS 27.180CCS F 11 Wind power generation system Offshore wind farm safety Evaluation Technical Procedures Wind energy generation systems-Technical code of practice for safety evaluation of offshore wind farm 2024-09-29 Release 2025-04-01 Implementation State Administration for Market Regulation The National Standardization Administration issued Table of ContentsPreface Ⅲ 1 Scope...1 2 Normative references ...1 3 Terms and Definitions 1 4 General Provisions 1 5 Evaluation items...2 5.1 Facilities and Equipment 2 5.1.1 Offshore wind turbine foundation and offshore booster station foundation 2 5.1.2 Offshore wind turbines 2 5.1.3 Offshore booster station 2 5.1.4 Submarine cables 3 5.1.5 Auxiliary systems and equipment 3 5.2 Labor safety and working environment 3 5.2.1 Labor Safety 3 5.2.2 Working Environment 3 5.3 Production Management 4 5.3.1 Production system 4 5.3.2 Production training 4 5.3.3 Technical supervision and management 4 5.3.4 Emergency Management 4 5.3.5 Outsourced Project Management 4 5.3.6 Accident Investigation and Safety Assessment 4 6 Evaluation Methods 4 Appendix A (Informative) Major risk factors for offshore wind farms 7 References ...8ForewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting is required. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Machinery Industry Federation. This document is under the jurisdiction of the National Technical Committee for Standardization of Wind Power Generation (SAC/TC 50). This document was drafted by. China Huaneng Group Co., Ltd., China Huaneng Group Clean Energy Technology Research Institute Co., Ltd., China Yangtze River Delta Group Guangdong Branch of China Three Gorges Corporation, Beijing Jianheng Certification Center Co., Ltd., Goldwind Science & Technology Co., Ltd., CSSC Offshore Wind Power Co., Ltd. Ltd., China Quality Certification Center, Shanghai Electric Wind Power Group Co., Ltd., Windey Energy Technology Group Co., Ltd., Harbin Electric Wind Energy Co., Ltd., CRRC Shandong Wind Power Co., Ltd., CRRC Zhuzhou Electric Locomotive Research Institute Co., Ltd. Wind Power Division, China Three Gorges New Energy Yuan (Group) Co., Ltd., China Power Construction Offshore Wind Power Engineering Co., Ltd., Shanghai Energy Technology Development Co., Ltd., Three Gorges New Energy Offshore Wind Power Operation and Maintenance Jiangsu Co., Ltd., China Electric Power Research Institute Co., Ltd., Beijing Qianyuan Wind Power Technology Co., Ltd., Huaneng New Energy Co., Ltd. Yunnan Branch of China Railway Construction Ports and Navigation Bureau Group Co., Ltd., Yangjiang Offshore Wind Power Laboratory, China Power Construction Group Kunming Survey and Design Institute Design Research Institute Co., Ltd., Shanghai Jiao Tong University, CCCC Third Harbor Engineering Bureau Co., Ltd., PowerChina Fujian Electric Power Survey and Design Institute Co., Ltd., Wuhan University of Technology, Shandong Electric Power Engineering Consulting Institute Co., Ltd., and Shanghai Donghai Wind Power Generation Co., Ltd. The main drafters of this document are. Li Lailong, Jiang Ben, Cheng Yu, Ma Li, Fu Pengcheng, Zheng Junjie, Yang Jing, Yuan Ying, Zhang Yu, He Xianzhao, Zeng Xingguo, Zhang Jingjing, Yao Hui, Dong Mingzhi, Yan Jianguo, Deng Yi, Zheng Aiwu, Zhao Min, Cheng Long, Liu Xin, Wang Hua, Li Hantao, Gong Jiahui, Li Peng, Sun Tianxue, Zhuang Yan, Gao Yue, Ren Danyuan, Tong Yonglu, Yang Xueliang, Zhu Ronghua, Wang Guojin, Gao Zhen, Liu Lu, You Shulin, Liu Jingxian, Chen Chen, Zhang Yongfei, Zhang Zhiwei, Yuan Qingqing. Wind power generation system Offshore wind farm safety Evaluation Technical Procedures1 ScopeThis document specifies the evaluation items, evaluation methods, evaluation basis and risk level evaluation for the safety evaluation of offshore wind farms during operation. Fixed content. This document is applicable to the safety assessment of offshore wind farms that have been connected to the grid and operated at full capacity.2 Normative referencesThe contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 32128 Offshore wind farm operation and maintenance regulations GB/T 51308 Design standard for offshore wind farms3 Terms and definitionsThe terms and definitions defined in GB/T 32128 and GB/T 51308 and the following apply to this document. 3.1 Submarine cable Power transmission cables and communication cables laid on the seabed with high mechanical strength and corrosion resistance. Note. Submarine cables include sending submarine cables and collecting submarine cables. 3.2 method of safety checklist Analyze various risk factors in offshore wind farm systems and equipment, mechanical devices, operation management, and organizational measures using safety checklists. The method of vegetarian.4 General4.1 The first safety assessment of an offshore wind farm should be conducted within one year after the wind farm is fully connected to the grid. Conduct safety assessments regularly. 4.2 The safety assessment of offshore wind farms is divided into self-inspection by the offshore wind farm operator and expert evaluation. The bank shall organize internal management and technical personnel to carry out the evaluation, and the expert evaluation shall be organized by the superior competent unit of the wind farm operating unit for no less than The evaluation was carried out by a team of three experts. 4.3 Safety of offshore wind farms is evaluated based on three indicators. facilities and equipment, labor safety and working environment, and production management. The evaluation items of various evaluation indicators should refer to GB/T 32128, DL/T 796, DL/T 797, NB/T 10322, NB/T 10579 and NB/T 10996. 4.4 The safety checklist method should be adopted for the safety assessment of offshore wind farms. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 44680-2024_English be delivered?Answer: Upon your order, we will start to translate GB/T 44680-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 44680-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 44680-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |