Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 44639.1-2024 English PDF

US$439.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 44639.1-2024: Railway applications - Energy measurement system on board trains - Part 1: General
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 44639.1-2024439 Add to Cart 4 days Railway applications - Energy measurement system on board trains - Part 1: General Valid

Similar standards

GB/T 6770   GB/T 36287   TB/T 3541.3   GB/T 44639.4   GB/T 44639.5   GB/T 44639.3   

Basic data

Standard ID: GB/T 44639.1-2024 (GB/T44639.1-2024)
Description (Translated English): Railway applications - Energy measurement system on board trains - Part 1: General
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: S34
Classification of International Standard: 45.060
Word Count Estimation: 22,234
Date of Issue: 2024-09-29
Date of Implementation: 2025-04-01
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 44639.1-2024: Railway applications - Energy measurement system on board trains - Part 1: General


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 45.060 CCSS34 National Standard of the People's Republic of China Rail transit train power measurement system Part 1.General Part 1.General (IEC 62888-1.2018, Railwayapplications-Energymeasurement Released on 2024-09-29 2025-04-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III Introduction V 1 Scope 1 2 Normative references 1 3 Terms, definitions and abbreviations 2 3.1 Terms and Definitions 2 3.2 Abbreviations 4 4 Requirements 4 4.1 General Principles 4 4.2 System Level Requirements 4 4.2.1 General requirements 4 4.2.2 Accuracy 4 4.2.3 EMS operation and power supply 5 4.2.4 EMS measurement input 5 4.2.5 Data Processing 5 4.2.6 Reliability, availability, maintainability and safety (RAMS) 6 4.3 Equipment Level Requirements 7 4.3.1 Identification and availability of basic data 7 4.3.2 Interface 7 4.3.3 Data processing and transmission 8 4.3.4 Software 8 4.3.5 Data Flow Security 9 4.3.6 Environmental conditions 10 4.3.7 Mechanical requirements, structure and design 11 4.3.8 Electrical requirements 11 Reference 13

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is part 1 of GB/T 44639 “Electric Energy Measurement System for Rail Transit Trains”. Lower part. --- Part 1.General; --- Part 2.Electrical energy measurement; --- Part 3.Data processing; --- Part 4.Communications; --- Part 5.Conformance test; --- Part 6.Requirements other than billing. This document is modified to adopt IEC 62888-1.2018 "Rail transit train electrical energy measurement system Part 1.General principles". The technical differences between this document and IEC 62888-1.2018 and their reasons are as follows. ---Replace IEC 60850.2007 (see Chapter 1) with the normative reference GB/T 1402-2010 to adapt to my country's technical requirements parts, increasing operability; --- Define "contactline" as "traction network", and change "power receiving equipment" in the term explanation to "contact network or conductive rail and other equipment" And the term source (see 3.1.5, 3.1.5 of IEC 62888-1.2018) has been deleted to include different traction power supply systems; --- Added the term "auxiliary power supply" (see 3.1.22) to clarify its definition; --- Replace IEC 62888-6 with the normative reference GB/T 44639.6 (see 4.1, 4.2.2, 4.2.4.1, 4.2.4.2, 4.2.6.1, 4.3.2.1, 4.3.2.2.3, 4.3.2.3, 4.3.4.3, 4.3.4.4, 4.3.5.1) to adapt to my country's technical conditions and increase operability; ---Replace IEC 62888-2 (see 4.2.2, 4.2.4.2) with the normative reference GB/T 44639.2 to adapt to my country's technical requirements parts, increasing operability; --- Replace IEC 60571.2012 with the normative reference GB/T 25119-2021 (see 4.2.3.1, 4.3.6.1, 4.3.6.3, 4.3.7.1) to adapt to my country's technical conditions and increase operability; --- Changed the start-up time parameter values of PWR-A and PWR-B types (see Table 2, Table 2 of IEC 62888-1.2018) and deleted The PWR-X type (see Table 2 of IEC 62888-1.2018) is adopted to meet the actual application needs of my country; --- Deleted the content of "Changes in 600V to 750V DC traction power supply system do not need to be recorded" (see IEC 62888-1.2018 4.2.5.1), because there is no DC600V traction power supply system in my country; --- Deleted the TSC-X type (see Table 3 of IEC 62888-1.2018) to avoid the use of undefined parameters; --- Changed the description of VIN (see 4.2.5.2, 4.2.5.2 of IEC 62888-1.2018) to comply with the existing vehicle identification in my country Regulation; --- Replace ISO 3166-1 (see 4.2.5.2) with the normative reference GB/T 2659.1 to adapt to my country's technical conditions and increase the Operability; --- Replace IEC 61991 (see 4.2.6.4) with the normative reference GB/T 21414 to adapt to my country's technical conditions and increase operability Sex; --- Replace IEC 62888-4 (see 4.3.2.1) with the normative reference GB/T 44639.4 to adapt to my country's technical conditions, and add Operability; --- Replace IEC 62498-1.2010 with the normative reference GB/T 32347.1-2015 (see 4.3.6.1, 4.3.6.2, 4.3.6.9) to adapt to my country's technical conditions and increase operability; --- Replace IEC 61010-1 (see 4.3.7.4) with the normative reference GB/T 4793.1 to adapt to my country's technical conditions and increase Operability; --- Replace IEC 60085 (see 4.3.8.1) with the normative reference GB/T 11021 to adapt to my country's technical conditions and increase operability Sex; --- Replace IEC 62497-1.2010 (see 4.3.8.2, 4.3.8.3) with the normative reference GB/T 32350.1-2015 to adapt to our The technical conditions of the country increase operability. The following editorial changes were made to this document. --- Deleted the VIN European format description (see 3.1.21 Note 1 of IEC 62888-1.2018); --- Deleted the CPID European format description (see 4.2.5.2 Note 1 of IEC 62888-1.2018); --- Changed the safety guide description, changing "European country related guidelines EN50155, EN45545-2 and EN45545-5" to “Refer to relevant fire protection requirements of EN45545-2” (see Note 2 of 4.2.6.4, Note 1 of 4.2.6.4 of IEC 62888-1.2018). Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document is proposed by the National Railway Administration. This document is under the jurisdiction of the National Rail Transit Electrical Equipment and System Standardization Technical Committee (SAC/TC278). This document was drafted by. Zhuzhou CRRC Times Electric Co., Ltd., China Railway Inspection and Certification Zhuzhou Traction Electrical Equipment Inspection Station Co., Ltd. CRRC Nanjing Puzhen Co., Ltd., CRRC Zhuzhou Electric Locomotive Co., Ltd., CRRC Qingdao Sifang Locomotive Co., Ltd., Guangzhou Metro Group Co., Ltd. and Shanghai Shentong Metro Group Co., Ltd. The main drafters of this document are. Zhang Zhixue, Wang Yue, Fu Gang, Li Tongqing, Wang Aiwu, Cao Zengming, Zhang Zhiqiang, Chen Gang and Zhou Yuan.

Introduction

Energy efficiency is essential to meet the challenges of supporting energy policies, protecting the environment and conserving natural resources. Energy efficiency, especially the standardization of overall energy efficiency of rail transit vehicles, has attracted great attention from the rail transit industry, and relevant standards are being gradually formulated. The main contents include the definition and boundary of energy efficiency, influencing factors, test methods, etc. GB/T 44639 "Electric Vehicles for Rail Transit" The Energy Measurement System is designed to standardize the process of acquiring train power data and ensure the reliability of the data. It consists of six parts. --- Part 1.General. The purpose is to specify the system-level requirements of the energy measurement system and to implement one or more General requirements for equipment with multiple functions. --- Part 2.Electric energy measurement. The purpose is to specify the requirements for electric energy measurement functions for measuring the electric energy consumed and regenerated by traction units, and Requirements for the voltage measurement function, current measurement function and energy calculation function that make up the energy measurement function. --- Part 3.Data processing. The purpose is to specify the data processing system and ground data collection service in the electric energy measurement system requirements. --- Part 4.Communications. The purpose is to specify the requirements for on-board data communication services and vehicle-to-ground communication services of the energy measurement system. These communication services enable data to be transferred between functions within the energy measurement system, between the energy measurement system and other on-board units, and between data Handles exchanges between the system and ground servers. --- Part 5.Conformance test. The purpose is to specify the consistency test of new energy measurement systems installed on traction units Arrangements, and conformance testing procedures for replacement of equipment and auxiliary components. --- Part 6.Requirements other than billing. The purpose is to clarify the requirements for energy consumption benchmark testing, daily energy consumption monitoring, and technology research and development. Able to measure the specific requirements of the system. The functional structure, main sub-functions and data flow of the train power measurement system are shown in Figure 1. Figure 1 Schematic diagram of EMS functional structure and data flow Rail transit train power measurement system Part 1.General

1 Scope

This document specifies the main purpose of the Energy Measurement System (EMS), which is to measure the train's energy consumption for energy management, energy saving, Billing, etc. This document specifies requirements for a complete EMS and for all equipment that implements one or more functions of an EMS. This document is applicable to newly built EMS, which is used in AC power supply and/or DC power supply specified in GB/T 1402-2010. On the traction unit that supplies the power. This document does not apply to portable EMS.

2 Normative references

The contents of the following documents constitute the essential terms of this article through normative references in this article. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 1402-2010 Voltage of rail transit traction power supply system (IEC 60850.2007, MOD) GB/T 2659.1 Codes for the names of countries and regions and their administrative divisions Part 1.Country and area codes (GB/T 2659.1-2022,ISO 3166-1.2020,MOD) GB/T 4208-2017 Degrees of protection provided by enclosures (IP code) (IEC 60529.2013, IDT) GB 4793.1 Safety requirements for electrical equipment for measurement, control and laboratory use Part 1.General requirements (GB 4793.1- 2007,IEC 61010-1.2001,IDT) GB/T 11021 Electrical insulation heat resistance and representation method (GB/T 11021-2014, IEC 60085.2007, IDT) GB/T 21414 Provisions for protection against electrical hazards in rail transit vehicles (GB/T 21414-2021, IEC 61991. 2019,MOD) GB/T 25119-2021 Rail transit rolling stock electronic devices (IEC 60571.2012, MOD) GB/T 32347.1-2015 Environmental conditions for rail transit equipment Part 1.Rolling stock equipment (IEC 62498-1. 2010,MOD) GB/T 32350.1-2015 Insulation coordination for rail transit - Part 1.Basic requirements for electrical clearances and insulation of electrical and electronic equipment Creepage distance (IEC 62497-1.2010, MOD) GB/T 44639.2 Rail transit train power measurement system Part 2.Power measurement (GB/T 44639.2-2024, IEC 62888-2.2018,MOD) GB/T 44639.4 Rail transit train power measurement system Part 4.Communication (GB/T 44639.4-2024, IEC 62888-4.2018,MOD) GB/T 44639.6 Rail transit train power measurement system Part 6.Requirements other than billing (GB/T 44639.6- 2024,IEC 62888-6.2018,MOD) ISO 13732-1 Ergonomics of the thermal environment - Methods for assessing the response of humans to surfaces in contact with them - Part 1.Hot surfaces Note. GB/T 44624-2024 Ergonomics of thermal environments - Methods for evaluating human responses to contact with hot and cold surfaces (ISO 13732-1.2006; ISO /T S13732-2.2001;ISO 13732-3.2005,NEQ)
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 44639.1-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 44639.1-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 44639.1-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 44639.1-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.