GB/T 41994-2022 English PDFUS$584.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 41994-2022: Industrial furnace and associated processing equipment - Safety requirements for machinery and equipment for production of steel by electric arc furnaces Status: Valid
Basic dataStandard ID: GB/T 41994-2022 (GB/T41994-2022)Description (Translated English): Industrial furnace and associated processing equipment - Safety requirements for machinery and equipment for production of steel by electric arc furnaces Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K61 Classification of International Standard: 25.180.10 Word Count Estimation: 34,358 Date of Issue: 2022-10-14 Date of Implementation: 2023-05-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 41994-2022: Industrial furnace and associated processing equipment - Safety requirements for machinery and equipment for production of steel by electric arc furnaces---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Industrial furnace and associated processing equipment -- Safety requirements for machinery and equipment for production of steel by electric arc furnaceses ICS 25.180.10 CCSK61 National Standards of People's Republic of China Industrial furnaces and related process equipment Electric arc furnace steelmaking Safety requirements for machinery and equipment (ISO 13578.2017, IDT) Published on 2022-10-12 2023-05-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 4 4 Abbreviations7 5 Serious danger 7 6 Safety requirements and/or measures 7 6.1 General requirements7 6.2 List of major hazards, hazardous situations, safety requirements and/or measures 13 7 Verification of safety requirements and/or measures 18 8 Usage information 18 8.1 General requirements 18 8.2 Warning devices and safety signs 18 8.3 Minimum marking 18 8.4 Accompanying Documents 18 8.5 Personnel training 21 Appendix A (normative) Noise Test Guidelines 22 A.1 General 22 A.2 Determination of sound power level 22 A.3 Determination of emission sound pressure level 22 A.4 Measurement uncertainty 23 A.5 Operating Conditions 23 A.6 Information Recording and Reporting 23 A.7 Determination and detection of noise emission values 24 Appendix B (informative) Equipment covered by this document25 Appendix C (Informative) Example of Electric Arc Furnace 27 Reference 29 forewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. This document is identical to ISO 13578.2017 "Safety Requirements for Electric Arc Furnace Steelmaking Machinery and Equipment for Industrial Furnaces and Related Process Equipment". The following minimal editorial changes have been made to this document. --- Added "Notes" in 3.18.1~3.18.3, 6.1.1~6.1.3, 6.1.5, 6.1.6, 6.1.10.6, 6.1.10.8, 6.1.12, 8.3; --- Added "Note 2" of Figure B.1; ---Due to editorial errors in the original text, the relevant content of the abolished reference standard "EN13463-1" is deleted. Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed by China Electrical Equipment Industry Association. This document is under the jurisdiction of the National Industrial Electric Heating Equipment Standardization Technical Committee (SAC/TC121). This document is drafted by. Xi'an Electric Furnace Research Institute Co., Ltd., MCC CCID Engineering Technology Co., Ltd., MCC Jingcheng Engineering Technology Co., Ltd. Co., Ltd., Sichuan Metallurgical Control Group Co., Ltd., Changchun Xinghai Electric Furnace Co., Ltd., Xi'an Huijin Technology Co., Ltd., Shaanxi Kehui Heat Engineering Technology Co., Ltd., Guangdong Feicheng New Materials Co., Ltd., Xi'an Jingzhongsheng Technology Co., Ltd., Anbiao (Fujian) Safety Technology Service Ltd. The main drafters of this document. Xiao Xuewen, Yu Weijiang, Li Kun, Zhang Yong, Peng Kediao, Tian Hangliang, Shi Qiuqiang, Zhang Yuhua, Li Zhi, Yang Jia, Cao Jiao, Huang Xiaojun, Zhang Jianlian, Duan Chunfang, Yi Zhonghui, Chen Wei. Industrial furnaces and related process equipment Electric arc furnace steelmaking machinery and equipment safety requirements1 ScopeThis document specifies general safety requirements for electric arc furnace (EAF) steelmaking without radioactive material. Note. Radioactive substances are tested before entering the steel plant. This document addresses the significant hazards, hazardous situations and hazardous events listed in Table 1 associated with EAF, when When used under long-term conditions, it also includes foreseeable failures and failures during misuse. This document specifies guidelines for the integration of equipment and equipment in the production process. This document specifies the requirements for the safety of personnel during the design, transport, assembly, commissioning, operation, maintenance and decommissioning of equipment. This document assumes that the equipment is operated and maintained by adequately trained personnel, with manual setup, adjustment and maintenance as part of the normal use of the equipment. part. This document applies to the following equipment (see Table B.1 and Table B.2 of Appendix B, Figure C.1 and Figure C.2 of Appendix C). --- Alternating current (AC) technology EAF; --- Direct current (DC) technology EAF; ---Scrap preheating technology; --- Associated equipment, devices (such as inert gas stirring, carbon and oxygen injection systems). This document does not apply to the following devices. --- Induction furnace; --- Resistance EAF (such as submerged arc furnace); --- Electron beam furnace; ---Plasma furnace; --- Other electric furnaces for secondary refining, such as ladle refining furnaces. This document does not specify safety requirements for the following equipment, which may be an integral part or supplementary part of equipment within this scope. ---crane; --- Furnace shell spreader; ---Scrap steel basket, ladle, slag tank; --- Scrap baskets, ladles and slag tankers; ---Dust removal system; --- "kennel" and "elephant house" (furnace hoods for environmental reasons); --- Alloy system; ---Independent scrap drying equipment; --- Furnace transformers and high-voltage systems; --- Robots, manipulators (eg temperature measurement and sampling use).2 Normative referencesThe contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 41994-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 41994-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 41994-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 41994-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |