GB/T 39853.2-2021 English PDFUS$2394.00 · In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 39853.2-2021: Power quality measurement in power supply systems - Part 2: Functional tests and uncertainty requirements Status: Valid
Basic dataStandard ID: GB/T 39853.2-2021 (GB/T39853.2-2021)Description (Translated English): Power quality measurement in power supply systems - Part 2: Functional tests and uncertainty requirements Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: N22 Word Count Estimation: 126,156 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 39853.2-2021: Power quality measurement in power supply systems - Part 2: Functional tests and uncertainty requirements---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Power quality measurement in power supply systems - Part 2.Functional tests and uncertainty requirements ICS 17.220.20 N22 National Standards of People's Republic of China Power quality measurement in power supply system Part 2.Functional test and uncertainty requirements (IEC 62586-2.2017, IDT) Released on 2021-03-09 2021-10-01 implementation State Administration of Market Supervision and Administration Issued by the National Standardization Management Committee Table of contentsForeword Ⅲ Introduction Ⅳ 1 Scope 1 2 Normative references 1 3 Terms, definitions, abbreviations, signs and symbols 1 3.1 General terms and definitions 2 3.2 Terms and definitions related to uncertainty 2 3.3 Symbol 3 4 Requirements 3 4.1 Meet the requirements of Class A products 3 4.2 Meet the product requirements of S category 4 5 Common requirements for functional type tests 5 5.1 General principles of the test 5 5.2 Test procedure 9 6 Comply with IEC 61000-4-30 Class A instrument functional test procedures 10 6.1 Grid frequency 10 6.2 Power supply voltage amplitude 11 6.3 Flicker 13 6.4 Interruption, sag and swell of power supply voltage 13 6.5 Unbalanced supply voltage 23 6.6 Voltage harmonics 24 6.7 Voltage interharmonics 28 6.8 Grid signal voltage of power supply 31 6.9 Measuring negative and positive deviation parameters 34 6.10 Marking 38 6.11 Clock uncertainty test 40 6.12 The amount of change caused by external influence 40 6.13 Rapid Voltage Change (RVC) 45 6.14 Current amplitude 60 6.15 Harmonic current 60 6.16 Interharmonic current 60 6.17 Current imbalance 60 7 Instrument function test procedures in accordance with IEC 61000-4-30S category 61 7.1 Grid frequency 61 7.2 Power supply voltage amplitude 63 7.3 Flicker 65 7.4 Interruption, sag and swell of power supply voltage 65 7.5 Unbalance of power supply voltage 74 7.6 Voltage harmonics 75 7.7 Voltage interharmonics 80 7.8 Grid signal voltage on the power supply 80 7.9 Measuring positive and negative deviation parameters 80 7.10 Mark 80 7.11 Clock uncertainty test 82 7.12 The amount of change caused by external influence 82 7.13 Rapid voltage changes 86 7.14 Current amplitude 86 7.15 Harmonic current 86 7.16 Interharmonic current 87 7.17 Current imbalance 87 8 Calculation of measurement uncertainty and operating uncertainty 88 Appendix A (Normative Appendix) Basic Uncertainty and Operating Uncertainty 90 Appendix B (informative appendix) Uncertainty of integrated system 92 Appendix C (Normative Appendix) Measurement of voltage amplitude and grid frequency and calculation of operating uncertainty 93 Appendix D (informative appendix) Further test of sag (amplitude and phase angle changes) 95 Appendix E (informative appendix) Suspended (multiphase) further test. test procedure 98 Appendix F (Normative Appendix) Seamless measurement of voltage amplitude and harmonic test 101 Appendix G (informative appendix) Seamless measurement of voltage amplitude and harmonics 104 Appendix H (informative appendix) Test equipment recommendations 113 Appendix I (informative appendix) Recommendations and test reports related to the Declaration of Conformity (DoC) 116 References 120ForewordGB/T 39853 "Power Quality Measurement in Power Supply System" is divided into the following two parts. ---Part 1.Power Quality Monitoring Equipment (PQI); ---Part 2.Functional test and uncertainty requirements. This part is Part 2 of GB/T 39853. This section was drafted in accordance with the rules given in GB/T 1.1-2009. The translation method used in this part is equivalent to IEC 62586-2.2017 ``Power Quality Measurement in Power Supply System Part 2.Functional Test And uncertainty requirements." The Chinese documents that have a consistent correspondence with the international documents cited in this section are as follows. ---GB/T 17626.7-2017 Electromagnetic compatibility test and measurement technology Power supply system and the measurement of harmonics and inter-harmonics of connected equipment Guidelines for Quantity and Measuring Instruments (IEC 61000-4-7.2009, IDT) ---GB/T 17626.15-2011 electromagnetic compatibility test and measurement technology scintillator function and design specification (IEC 61000- 4-15.2003, IDT) ---GB/T 17626.30-2012 Electromagnetic compatibility test and measurement technology Power quality measurement method (IEC 61000-4-30. 2008, IDT) ---GB/T 18039.4-2017 EMC environment factory low-frequency conducted disturbance compatibility level (IEC 61000-2-4. 2002, IDT) ---GB/T 27418-2017 Measurement Uncertainty Evaluation and Expression (ISO /IEC Guide98-3.2008, MOD) This section has made the following editorial changes. ---Incorporated the errata content of IEC 62586-2.2017/COR1.2018, and the clauses related to these content have been passed on the outer page The vertical double line (||) of the margin position is marked. Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents. This part was proposed by China Machinery Industry Federation. This part is under the jurisdiction of the National Standardization Technical Committee for Electrical Instruments and Meters (SAC/TC104). Drafting organizations of this section. Harbin Institute of Electrical Engineering and Instrumentation Co., Ltd., Yantai Dongfang Weston Electric Co., Ltd., Shenzhen Keludian Sub Technology Co., Ltd., Wuxing Technology (Shenzhen) Co., Ltd., Xiamen Xiaoxun New Energy Technology Co., Ltd., Shenzhen Zhongdian Power Technology Co., Ltd., China Electric Power Research Institute Co., Ltd., Zhejiang Huacai Technology Co., Ltd., Shenzhen Jiangji Industrial Co., Ltd., China Jiliang University, Holley Technology Co., Ltd., Qingdao Dingxin Communication Co., Ltd., Hangzhou Haixing Power Technology Co., Ltd., Zhejiang Chentai Technology Co., Ltd., Heilongjiang Province Electrical Instrumentation Engineering Technology Research Center Co., Ltd., China Electrical Instrumentation Quality Supervision Inspection Center, Wuhan Shengfan Electronics Co., Ltd., Aerospace Liangli Electric Co., Ltd., Ningbo Samsung Medical Electric Co., Ltd. Company, Ningxia Longjining Optical Instrument Co., Ltd., Qingdao Qiancheng Technology Co., Ltd. The main drafters of this section. Wang Huiwu, Chen Wenxin, Yuan Kuo, Xiong Wei, Hou Qingquan, Zeng Yousong, Ren Meihui, Zhao Sha, Gao Shaojun, Sun Shijie, Hong Tao, Zeng Shitu, Guo Zhiqiang, Zhou Jiewen, Zhao Bin, Zhao Wei, Han Guiju, Jiang Bin, Qin Guoxin, Tan Wei, Wang Wei, Wang Guodong, Chen Youyong, He Ang, Li Jianwei and Ye Zhizeng.IntroductionThe importance of power quality in the power supply system is becoming more and more extensive, and it is usually evaluated by power quality monitoring equipment. This part specifies the function and uncertainty test, which aims to verify the product's resistance to the Type A and Type S measurement methods specified in IEC 61000-4-30. Compliance with the law. This part is a supplement to IEC 61000-4-30. Power quality measurement in power supply system Part 2.Functional test and uncertainty requirements1 ScopeThis part of GB/T 39853 specifies the functional test and uncertainty requirements of the instrument. The power quality parameters in the power supply system are monitored, and the measurement method defined by IEC 61000-4-30 (Type A or Type S) is used. This section applies to power quality monitoring equipment that complies with GB/T 39853.1. This part may also be referenced by other product standards (such as digital fault recorders, gateway meters, medium voltage or high voltage protection relays). The product standard stipulates that the device embeds the Class A or Class S power quality functions defined by the IEC 61000-4-30 standard. These requirements apply to single-phase, two-phase and three-phase AC 50Hz or 60Hz power supply systems. This section does not involve user interfaces or topics that are not related to the measurement performance of the device. This section does not cover the post-processing and interpretation of data, such as the use of dedicated software.2 Normative referencesThe following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated reference documents, the latest version (including all amendments) is applicable to this document. IEC 61000-2-4 Electromagnetic Compatibility (EMC) Part 2-4.Compatibility level of low-frequency conducted disturbance in environmental factories (Electro- magneticcompatibility(EMC)-Part 2-4.Environment-Compatibilitylevelsinindustrialplantsfor low-frequencyconducteddisturbances] IEC 61000-4-7 Electromagnetic Compatibility (EMC) Part 4-7.Test and measurement technology Power supply system and its connected equipment harmonics And general guidelines for interharmonic measurement and instruments [Electromagneticcompatibility[EMC)-Part 4-7.Testingandmeas- urementtechniques-Generalguideonharmonicsandinterharmonicsmeasurementsandinstrumenta- tion,forpowersupplysystemsandequipment] IEC 61000-4-15 Electromagnetic Compatibility (EMC) Part 4-15.Testing and Measurement Technology Flicker Function and Design Specification [E- lectromagneticcompatibility(EMC)-Part 4-15.Testingandmeasurementtechniques-Flickermeter-Func- tionalanddesignspecifications] IEC 61000-4-30.2015 Electromagnetic Compatibility (EMC) Part 4-30.Test and Measurement Technology Power Quality Measurement Method [E- lectromagneticcompatibility(EMC)-Part 4-30.Testingandmeasurementtechniques-Powerquality measurementmethods] ISO /IEC Guide98-3.2008 Uncertainty of Measurement Part 3.Guidelines for Expression of Uncertainty in Measurement (GUM. 1995)[Uncertaintyofmeasurement-Part 3.Guidetotheexpressionofuncertaintyinmeasurement (GUM.1995)] 3 Terms, definitions, abbreviations, signs and symbols The following terms and definitions defined by IEC 61000-4-30 apply to this document. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 39853.2-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 39853.2-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 39853.2-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 39853.2-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |