| GB/T 39185-2020 English PDFUS$339.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 39185-2020: Technology requirement for ocean engineering ship dynamic positioning system Status: Valid 
 Basic dataStandard ID: GB/T 39185-2020 (GB/T39185-2020)Description (Translated English): Technology requirement for ocean engineering ship dynamic positioning system Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: U48 Classification of International Standard: 47.020.20 Word Count Estimation: 18,167 Date of Issue: 2020-10-11 Date of Implementation: 2021-05-01 Regulation (derived from): National Standard Announcement No. 21 of 2020 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 39185-2020: Technology requirement for ocean engineering ship dynamic positioning system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Technology requirement for ocean engnieering ship dynamic positioning system ICS 47.020.20 U48 National Standards of People's Republic of China Technical requirements for marine engineering ship dynamic positioning system 2020-10-11 released 2021-05-01 implementation State Administration for Market Regulation Issued by the National Standardization Management Committee Table of contentsForeword Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Dynamic positioning classification 4 5 Technical requirements for dynamic positioning system design 4 5.1 General requirements 4 5.2 Technical requirements for power system design 5 5.3 Technical requirements for thruster system design 6 5.4 Design technical requirements for dynamic positioning control system 6 5.5 Technical requirements for failure mode and impact analysis 8 6 Technical requirements for dynamic positioning system test 9 6.1 Technical requirements for power system test 9 6.2 Test technical requirements for thruster system 10 6.3 Test technical requirements for dynamic positioning control system 11 6.4 Technical requirements for failure mode and effect analysis (FMEA) test 12 Appendix A (informative appendix) Dynamic positioning classification marks and configuration comparison of each classification society 14 Appendix B (informative appendix) Configuration requirements for dynamic positioning levels of each classification society 15ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard was proposed and managed by the National Marine Machinery Standardization Technical Committee (SAC/TC137). Drafting organizations of this standard. Wuhan Marine Machinery Co., Ltd., China State Shipbuilding Industry Research Institute. The main drafters of this standard. Qiu Xiaofeng, Li Lei, Sun Meng, Chen Kai, Zou Bo, Chen Cheng, Luo Yin. Technical requirements for marine engineering ship dynamic positioning system1 ScopeThis standard specifies the dynamic positioning classification, design technical requirements and test technical requirements of marine engineering ship dynamic positioning systems. This standard applies to the design and inspection of the dynamic positioning system for marine engineering ships. Other ships or equipment with similar requirements, It can also be implemented by reference.2 Normative referencesThe following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. IMCAM166 Failure Mode and Impact Analysis Guide IMOMSC.1/Circ.1580 Dynamic Positioning System Ships and Equipment Guidelines3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 Prescribed scope of work The specified allowable ship position deviates from a certain set point. 3.2 Prescribed environmental conditions With the specified wind speed, current and wave height, the ship can perform the expected operation under such environmental conditions. 3.3 Dynamic positioning With automatic and (or) manual control, the ship can maintain its operation within the specified operating range and specified environmental conditions during its operation. Ship position and/or heading. 3.4 Dynamic positioning ship With automatic and (or) manual control, a ship that can maintain its position and (or) heading under specified operating ranges and specified environmental conditions. 3.5 Ship position keeping Maintain the predetermined ship position, heading and track under the normal operating range and environmental conditions of the control system. 3.6 Marine engineering ship A collective term for a series of ships that provide services for offshore operations. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 39185-2020_English be delivered?Answer: Upon your order, we will start to translate GB/T 39185-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 39185-2020_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 39185-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |