GB/T 37347-2019 English PDFUS$1159.00 ยท In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 37347-2019: Structure details for self-elevating drilling units Status: Valid
Basic dataStandard ID: GB/T 37347-2019 (GB/T37347-2019)Description (Translated English): Structure details for self-elevating drilling units Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: U17 Classification of International Standard: 47.020.99 Word Count Estimation: 58,527 Date of Issue: 2019-03-25 Date of Implementation: 2019-10-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 37347-2019: Structure details for self-elevating drilling units---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Structure details for self-elevating drilling units ICS 47.020.99 U17 National Standards of People's Republic of China Jack-up rig node structure Published on.2019-03-25 2019-10-01 implementation State market supervision and administration China National Standardization Administration issued ContentForeword III 1 Scope 1 2 node composition 1 3 through holes and patch 2 3.1 Crossing hole and patch code 2 3.2 Crossing holes and patch size 3 3.3 patch welding 4 3.4 Angle steel through hole and patch 4 3.5 Flat steel through hole and patch 7 3.6 Ball flat steel through hole and patch 9 3.7 L2 profile through hole and patch 11 3.8 L3 profile through hole and patch 14 3.9 T-section through hole and patch 17 4 end connection 19 4.1 Rib end connection 19 4.2 Longitudinal end connection 20 4.3 Rib rib end overlap 22 5 Combined profile panel end connection 22 6 profile transition connection 23 7 cut pattern 25 8 vents and flow holes 26 8.1 Vent and flow hole location 26 8.2 Vent and Flow Patterns 26 9 brackets 29 9.1 B-type bracket 29 9.2 Lap brackets 30 9.3 Anti-tip brackets 33 9.4 Wedge reinforcement brackets 34 10 protective strips 35 11 pillar 35 11.1 Pipe support pad 35 11.2 H-shaped strut pad 36 11.3 Pipe strut top connecting plate 37 11.4 H-pillar top connecting plate 38 11.5 H-pillar end 40 12 trough partition 41 13 welding node 41 14 Watertight cut-off hole 43 15 pipe joint welding 44 15.1 Pipe Joint Weld Area 44 15.2 Weld Requirements 44 16 Reinforcing bars and aggregates 45 17 bracket end requirements 46 18 legs typical welding 47 19 cantilever beam V-plate typical welding 48 Reference 50ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed and managed by the National Marine Ship Standardization Technical Committee (SAC/TC12). This standard was drafted. China Shipbuilding Industry Corporation No. 7 Research Institute, Dalian Shipbuilding Industry Group Co., Ltd. Drafters of this standard. Wang Xin, Shi Qiqi, Lu Qiaoyun, Yu Cong, Liu Xiangjian, Zhang Ping, Liu Jian. Jack-up rig node structure1 ScopeThis standard specifies the common node composition and its node details and marking codes in the structural design of jack-up rigs. This standard applies to the general structural design of jack-up rigs. Other offshore engineering platforms, auxiliary ships, etc. can be used as reference.2 node compositionThe general node composition of the jack-up rig is shown in Table 1. The node structure of the special area should be considered separately and confirmed by the relevant department. The node diagrams and dimensions in this standard are typical examples. Table 1 Node name node composition note Through hole and patch Angle steel through hole and patch type Flat steel through hole and patch type Ball flat steel through hole and patch type L2 profile through hole and patch type L2 profile is a combination of stitching Angle steel, panel root L3 profile through hole and patch type L3 profile is a combination of stitching Angle steel, web retaining root T profile through hole and patch type End connection Rib end connection Longitudinal end connection Rib rib end overlap Combined profile panel end connection T-profile, L2 profile, L3 profile, FL profile transition connection and end Type FL profile is folded angle steel Profile transition Composite profile and composite profile or ball flat steel and ball flat steel transition connection Flat steel and flat steel transition connection Composite profile and flat steel transition connection Incision pattern typical end incision Vents and flow holes, typical vents and flow holes Bracket B-type bracket Lap bracket Anti-tip bracket Wedge-shaped reinforcing bracket ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 37347-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 37347-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 37347-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 37347-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |