GB/T 35551-2017 English PDFUS$359.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 35551-2017: Safe handling rules in container storage area in port Status: Valid
Basic dataStandard ID: GB/T 35551-2017 (GB/T35551-2017)Description (Translated English): Safe handling rules in container storage area in port Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: A85 Classification of International Standard: 55.180.10 Word Count Estimation: 18,137 Date of Issue: 2017-12-29 Date of Implementation: 2018-07-01 Regulation (derived from): National Standards Bulletin 2017 No. 32 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 35551-2017: Safe handling rules in container storage area in port---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Safe handling rules in container storage area in port ICS 55.180.10 A85 National Standards of People's Republic of China Port container box area safety operating procedures 2017-12-29 Posted 2018-07-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 basic conditions and requirements 2 5 box stack palletizing 2 6 Handling machinery and vehicles driving 7 7 Resilience to disasters 11 ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard by the National Container Standardization Technical Committee (SAC/TC6) and focal point. This standard drafting unit. Shanghai International Port (Group) Co., Ltd., Ministry of Transport Institute of Water Transport, Hefei Port International Set Packing Terminals Limited. The drafters of this standard. Ming Ming, Wang Haijian, Wang Liming, Yu Han Fen, Wang Jian, Zhu Zu Fu, Wen Jun, Li Ji Chun, Yao Yonghua. Port container box area safety operating procedures1 ScopeThis standard specifies the basic conditions and requirements of the container port area of the port (hereinafter referred to as the "container area"), stack palletizing, loading and unloading machinery and vehicles Driving, weather and other disaster-resistant operations and safety requirements. This standard applies to the port container area. Designed for port area outside the container storage area can refer to the use of storage. This standard does not apply to dangerous goods containers and containers disassembly box operations.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 8487 Port Handling Terminology GB 11602 container port handling operations safety regulations GB/T 13145 Mechanical Reefer Container Yard Technical Management Requirements GB/T 17382 Series 1 container handling and bolting GB 50140 fire extinguisher configuration design specifications JT/T 90 port handling machinery wind load calculation and wind safety requirements JT/T 165 General Design Code for Seaports JT556 port lightning protection and grounding technical requirements Illumination of JT/T 557 Port Handling Area and Measurement Methods Large Machinery Anti-Typhoon Prevention Typhoon Control Regulations (Ministry of Communications Order No. 3 of.2003)3 Terms and definitionsGB/T 8487 defined and the following definitions and terms apply to this document. 3.1 Container box containerstoragearea With loading and unloading, transfer, storage, storage, inspection and other specific features and uses of container-specific area. 3.2 Top lifting (lifting) operations topliftspread The working machine with the top frame structure spreader lifts the container by vertical force by lifting four top corner pieces of the container. 3.3 Top hanging sling (lifting) homework topliftsling The slings under the working machinery hooks connect the four top corner pieces of the container and generally lift (lift) the container with a non-vertical force. 3.4 Side lifting (lifting) work sidelift Work machines equipped with side beam (frame) structure spreaders lift and lift containers by lifting two top corner pieces on one side of the container. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 35551-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 35551-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 35551-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 35551-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |