Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 33588.1-2025 English PDF

US$619.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 33588.1-2025: Lightning protection system components(LPSC) - Part 1: Requirements for connection components
Status: Valid

GB/T 33588.1: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 33588.1-2025619 Add to Cart 5 days Lightning protection system components(LPSC) - Part 1: Requirements for connection components Valid
GB/T 33588.1-2020374 Add to Cart 4 days Lightning protection system components (LPSC) - Part 1: Requirements for connection components Valid
GB/T 33588.1-2017754 Add to Cart 4 days Lightning protection system components (LPSC) -- Part 1: Requirements for connection components Obsolete

Similar standards

GB/T 5585.2   GB/T 36102   JB/T 4279.16   GB/T 33588.4   GB/T 33588.3   GB/T 33588.5   

Basic data

Standard ID: GB/T 33588.1-2025 (GB/T33588.1-2025)
Description (Translated English): Lightning protection system components(LPSC) - Part 1: Requirements for connection components
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: K10
Classification of International Standard: 91.120.40
Word Count Estimation: 30,322
Date of Issue: 2025-04-25
Date of Implementation: 2025-11-01
Older Standard (superseded by this standard): GB/T 33588.1-2020
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 33588.1-2025: Lightning protection system components (LPSC) - Part 1: Requirements for connection components


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 91.120.40 CCSK10 National Standard of the People's Republic of China Replaces GB/T 33588.1-2020 Lightning Protection System Components (LPSC) Part 1.Requirements for connectors (IEC 62561-1.2023, IDT) Released on 2025-04-25 2025-11-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of contents

Preface III Introduction V 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Classification (Class) 4 5 Requirements 5 6 Test methods 6 7 Electromagnetic Compatibility (EMC) 13 8 Structure and content of test reports 13 Appendix A (Normative) Requirements and corresponding test summary 16 Appendix B (Informative) Typical connection forms of various lightning protection system components 17 Appendix C (Normative) Connector Test Flowchart 18 Appendix D (Normative) Environmental impact test of connectors---Corrosion resistance test 19 Appendix E (Normative) Simplified test procedure 20 Reference 21

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is Part 1 of GB/T 33588 Lightning Protection System Components (LPSC). GB/T 33588 has been published as follows part. --- Part 1.Requirements for connectors; --- Part 2.Requirements for lightning arresters, down conductors and grounding electrodes; --- Part 3.Requirements for isolating spark gaps (ISGs); --- Part 4.Requirements for conductor fasteners; --- Part 5.Requirements for grounding electrode test boxes and grounding electrode seals; --- Part 6.Requirements for lightning strike counters (LSCs); --- Part 7.Requirements for grounding resistance reduction materials; --- Part 8.Requirements for isolation components of lightning protection systems. This document replaces GB/T 33588.1-2020 "Lightning protection system components (LPSC) Part 1.Requirements for connectors" and Compared with GB/T 33588.1-2020, in addition to structural adjustments and editorial changes, the main technical changes are as follows. a) Added the terms “conductor”, “connection”, “exothermic connection”, “soldering connection” and their definitions (see Chapter 3); b) The content classified by installation location has been changed (see 4.2, 4.2 of the 2020 edition); c) The contents of the documentation and installation instructions have been changed (see 5.2, 5.2 of the 2020 edition); d) Added identification content [see 5.3.1d)]; e) Deleted the contents on the impact on conductors and metal devices, safety connection and terminals of equipotential bonding bars (see 5.8~2020 edition) 5.10); f) Added requirements for expansion joints (see 5.9); g) Added test requirements to simplify the test process (see 6.1); h) Added test methods for documents and installation instructions (see 6.2); i) Changed Figure 3, changing “Basic installation method of jumper sample” to “Basic installation method of telescopic connector or jumper sample”. (see Figure 3, Figure 3 of the 2020 edition); j) The test method for sample installation has been changed (see 6.4, 6.2 of the 2020 edition); k) Added the figure of “Basic installation method of steel bar clamp connection sample” (see Figure 5); l) Added the figure of “Basic installation method of steel bar fusion welding connection, brazing connection or exothermic connection sample” (see Figure 6); m) The environmental impact test has been changed (see 6.5, 6.3 of the 2020 edition); n) The qualification criteria for electrical tests have been changed (see 6.6.2 and 6.4 of the 2020 edition); o) The static mechanical stress tolerance test has been changed (see 6.7, 6.5 of the 2020 edition); p) The test order in Appendix A was changed (see Appendix A, Appendix A of the 2020 edition); q) Added the normative appendix “Simplified test procedure” (see Appendix E). This document is equivalent to IEC 62561-1.2023 "Lightning protection system components (LPSC) Part 1.Requirements for connectors". The following minimal editorial changes were made to this document. --- Added notes to 6.1 to facilitate understanding and application; --- Added notes in D.3 of Appendix D to facilitate understanding and application. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed and coordinated by the National Technical Committee for Lightning Protection Standardization (SAC/TC258). This document was drafted by. Shanghai University, Shanghai Geotechnical Engineering Testing Center Co., Ltd., Shenzhen Putai Electric Co., Ltd., Shanghai Electric Power University, China Electric Power Research Institute Co., Ltd., Guangdong Leiningpu Electrical Testing Technology Co., Ltd., State Grid Electric Power Research Institute Wuhan South Rui Co., Ltd., Hefei Aerospace Electro-Physics Technology Co., Ltd., Shanghai Huayun Lightning Protection Technology Co., Ltd., China Association for Standardization, Qingdao Thunder Keshi Electric Power Technology Co., Ltd., Beijing Jinheyi Technology Development Co., Ltd., Hainan Electric Power Industry Development Co., Ltd., Zhongke Tianji Technology Co., Ltd., Liuzhou Branch of China Southern Power Grid Co., Ltd. Ultra-high Voltage Transmission Company, Helong New Materials Technology (Jiangsu) Co., Ltd. Co., Ltd., Kunming Power Supply Bureau of Yunnan Power Grid Co., Ltd., Zhejiang Huadian Lightning Protection Technology Co., Ltd., Taixing Weite New Materials Technology Co., Ltd. company. The main drafters of this document are. Zhou Qibin, Cheng Hao, Yao Ximei, Shi Bingyu, Bian Xiaoyan, Xu Xia, Fang Yuhe, Zhang Tao, Duan Zemin, Xiao Feng, Xiong Yi, Gu Cheng, Wang Wei, Yang Shunjian, Wang Yue, Gao Panliang, Tao Hantao, Xie Haojia, Chen Guoyu, Huang Huizhong, Zhou Tuo. The previous versions of this document and the documents it replaces are as follows. ---First published in.2017 as GB/T 33588.1-2017; ---First revision in 2020; ---This is the second revision.

Introduction

GB/T 33588 "Lightning protection system components (LPSC)" aims to establish the lightning protection system components designed and installed according to the IEC 62305 series of standards. The requirements and test methods for various components used in the life protection system (LPS) are intended to consist of eight parts. --- Part 1.Requirements for connectors. The purpose is to establish the requirements and test methods for metal connectors in lightning protection systems. --- Part 2.Requirements for lightning terminals, down conductors and grounding electrodes. The purpose is to establish the requirements for the metallic conductors that constitute lightning terminals and down conductors. Requirements and test methods for metal grounding electrodes (non-natural conductors) and metal grounding electrodes that constitute the grounding system. --- Part 3.Requirements for Isolating Spark Gaps (ISGs). The purpose is to establish the requirements for isolating spark gaps in lightning protection systems and test methods. --- Part 4.Requirements for conductor fasteners. The purpose is to establish the metal fasteners used to fix and support air terminals, down conductors and grounding devices. Requirements and test methods for fasteners for metal and non-metallic conductors. --- Part 5.Requirements for grounding electrode detection boxes and grounding electrode seals. The purpose is to establish grounding electrode detection boxes installed underground Requirements and test methods for terminal boxes and earthing electrode seals. --- Part 6.Requirements for lightning strike counters (LSCs). The purpose is to establish the requirements and test methods for lightning strike counters. --- Part 7.Requirements for grounding resistance reduction materials. The purpose is to establish the requirements and tests for grounding resistance reduction materials in lightning protection systems method. --- Part 8.Requirements for isolation components of lightning protection systems. The purpose is to establish the requirements for insulation supports and insulation down conductors and their special tight Requirements and test methods for firmware. Lightning Protection System Components (LPSC) Part 1.Requirements for connectors

1 Scope

This document specifies the requirements for metallic connections in lightning protection systems (LPS) and describes the corresponding test methods. The connectors include connectors, clamps, equipotential bonding bars and jumpers, telescopic connectors and test disconnect cards. The connection methods of the connectors in this document include exothermic connection, brazing connection, welding connection, clamping connection, crimping, seaming, screws or bolts connect. This document is not applicable to the testing of connections in explosive atmospheres.

2 Normative references

The contents of the following documents constitute essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 2423.18-2021 Environmental testing Part 2.Test methods Test Kb. Salt spray, alternating (sodium chloride solution) (IEC 60068-2-52.2017, IDT) rosionresistance) ISO 22479.2019 Corrosion of metals and alloys - Sulfur dioxide in humid air (fixed gas method) IEC 62561-2 Lightning protection system components (LPSC) Part 2.Requirements for lightning terminals, down conductors and earthing electrodes Note. GB/T 33588.2-2020 Lightning protection system components (LPSC) Part 2.Requirements for lightning terminals, down conductors and grounding electrodes (IEC 62561-2. 2018, IDT)

3 Terms and definitions

The following terms and definitions apply to this document. The terminology databases used for standardization maintained by ISO and IEC are located at. 3.1 Connection components A component of an external lightning protection system used for connection between conductors or between conductors and other metal devices. Examples. Chapter 1 gives examples of connectors. 3.2 Metal installation Metal extensions inside buildings that need to be protected and may form lightning current paths
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 33588.1-2025_English be delivered?

Answer: Upon your order, we will start to translate GB/T 33588.1-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 33588.1-2025_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 33588.1-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 33588.1-2025?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 33588.1-2025 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.