Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 32590.1-2024 English PDF

US$439.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 32590.1-2024: Railway applications - Suburban railway and urban guided transport management and command/control systems - Part 1: System principles and fundamental concepts
Status: Valid

GB/T 32590.1: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 32590.1-2024439 Add to Cart 4 days Railway applications - Suburban railway and urban guided transport management and command/control systems - Part 1: System principles and fundamental concepts Valid
GB/T 32590.1-2016999 Add to Cart 5 days Railway applications -- Urban guided transport management and command/control systems -- Part 1: System principles and fundamental concepts Obsolete

Similar standards

TB/T 3539   TB/T 2296   GB/T 32590.3   GB/T 32590.2   

Basic data

Standard ID: GB/T 32590.1-2024 (GB/T32590.1-2024)
Description (Translated English): Railway applications - Suburban railway and urban guided transport management and command/control systems - Part 1: System principles and fundamental concepts
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: S60
Classification of International Standard: 45.020
Word Count Estimation: 22,239
Date of Issue: 2024-04-25
Date of Implementation: 2024-11-01
Older Standard (superseded by this standard): GB/T 32590.1-2016
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 32590.1-2024: Railway applications - Suburban railway and urban guided transport management and command/control systems - Part 1: System principles and fundamental concepts


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 45:020 CCSS60 National Standards of People's Republic of China Replaces GB/T 32590:1-2016 Rail transit, urban rail and urban rail transit Transportation Management and Command/Control Systems Part 1: System principles and basic concepts (IEC 62290-1:2014, Railway applications - Urban guided transport Published on April 25, 2024, implemented on November 1, 2024 State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface I Introduction III 1 Scope 1 2 Normative references 1 3 Terms, definitions and abbreviations 2 3:1 Terms and Definitions 2 3:2 Abbreviations 4 4 Basic Concepts 5 4:1 UGT 5 4:2 Automation Level 6 4:3 Operation Management and Monitoring 8 4:4 Interoperability, interchangeability, compatibility and adaptability 8 5 System peripheral conditions and boundaries 9 6 General requirements and basic functions 10 6:1 General requirements 10 6:2 Basic functions 11 Reference 17

Foreword

This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting: This document is part 1 of GB/T 32590 "Rail transit, urban rail and urban rail transportation management and command/control systems" GB/T 32590 has published the following parts: --- Part 1: System principles and basic concepts; --- Part 2: Functional requirements specification; --- Part 3: System requirements specification: This document replaces GB/T 32590:1-2016 "Rail transit urban rail transit management and command/control system Part 1 Compared with GB/T 32590:1-2016, in addition to structural adjustments and editorial changes, the main technical changes are as follows: a) The scope of application of this document has been increased (see Chapter 1); b) Added additional functions, running intervals, required functions, train numbers, mobile authorization, non-UGTMS trains, optional functions, and train completeness The terms and definitions of "operating speed" and "travel speed" have been changed, and the terms "module", "manual driving" and "passenger train" have been deleted: Terms such as application, operation control center HMI, point transmission, UGTMS vehicle-mounted equipment, and UGTMS operation control equipment are used: Definition (see 3:1); c) Deleted abbreviations such as "CCTV", "DCS", "GOL", "HVAC", "UGTMSOB", and "UGTMSWS" (see:2016 edition 3:2); d) "Line level" has been deleted (see 4:2:4 of the:2016 edition); e) Changed the requirement of “universality under the same automation level” (see 4:4:1:1, 4:4:1:1 of the:2016 edition); f) Changed the system's peripheral conditions and boundaries, and deleted the level crossing in the ground facilities: The level crossing is a specific scene and is not included in the infrastructure: Car wash machines have been added (see Chapter 5, Chapter 5 of the:2016 edition); g) The content of “Basic system performance” has been changed (see 6:1:10, 6:1:10 of the:2016 edition); h) Changed the description of “Basic functions of train operation” (see 6:2:2, 6:2:1 of the:2016 edition); i) The relevant description of “basic functions of operation supervision” has been changed (see 6:2:3, 6:2:2 of the:2016 edition): This document is modified to adopt IEC 62290-1:2014 "Rail transit urban rail transit management and command/control systems Part 1 Part 1: System principles and basic concepts: The technical differences between this document and IEC 62290-1:2014 and their reasons are as follows: --- Added the term and definition of headway (see 3:1:8), which is used in this document; --- Deleted automatic mode, component, driving onsight, emergency brake HMI), reporting train, safe places, spot transmission, parking equipment protection) and other terms and definitions (see 3:1:2, 3:1:6, 3:1:8, 3:1:9, 3:1:10, 3:1:22, 3:1:25, 3:1:27, 3:1:31, 3:1:37, 3:1:39, 3:1:40 and 3:1:42), the above terms are not used in this document; --- Deleted alternating current (AC), closed-circuit television (CCTV), direct current (DC), data communication system (DCS), side impact protection area (PFA), ventilation and air conditioning system (HVAC), required (M), optional (O), overlap (Overlap), RAMS, route end (RD), requirement (REQ), route origin (RO), UGTMS on-board equipment (UGTMSOB), UGTMS ground equipment (UGTMSWS) and other abbreviations (see 3:2 of IEC 62290-1:2014): This document does not use the above abbreviations; --- Changed the safety requirements of UGTMS, replaced IEC 62280 with the normative reference GB/T 24339, GB/T 28808 replaced IEC 62279 (see 6:1:2, 6:1:2 of IEC 62290-1:2014) to meet my country's national conditions; --- Changed the electromagnetic compatibility requirements of UGTMS, replacing IEC 62236 with the normative reference GB/T 24338 (see 6:1:3, IEC 62290-1:2014, 6:1:3), to meet the national conditions of my country; --- GB/T 32590:2 replaced IEC 62290-2 (see 6:2:1) to suit my country's national conditions: The following editorial changes were made to this document: --- To coordinate with the existing standards, the name of the standard is changed to "Rail Transit, Urban Rail and Urban Rail Transit Management and Command/Control Systems System Part 1: System principles and basic concepts: Please note that some of the contents of this document may involve patents: The issuing organization of this document does not assume the responsibility for identifying patents: This document is proposed by the National Railway Administration: This document is under the jurisdiction of the National Rail Transit Electrical Equipment and System Standardization Technical Committee (SAC/TC278): This document was drafted by: Shenzhen Metro Group Co:, Ltd:, CRRC Zhuzhou Electric Locomotive Research Institute Co:, Ltd:, Hunan CRRC Times Xinxin Signal Co:, Ltd:, Beijing Jiaotong University, CRRC Datong Electric Locomotive Co:, Ltd:, Beijing Railway Signal Research and Design Institute Group Co:, Ltd: Company, China Railway Fifth Survey and Design Institute Group Co:, Ltd:, Beijing Subway Operation Co:, Ltd:, China Academy of Railway Sciences Group Co:, Ltd: Department of Communications and Signal Research Institute: The main drafters of this document are: Long Yucai, Lin Gang, Liu Qunxin, Lü Haojiong, Xu Jin, Huang Youneng, Liu Peng, Han Zhen, Cui Li, Dai Qiyuan, Li Xi, Gao Hongmin: This document was first published in:2016 and this is the first revision:

Introduction

GB/T 32590 specifies the requirements for urban rail transit and train control systems based on communication for urban rail passenger transport lines and networks: Functional requirements, system requirements and interface requirements of urban rail transportation management and command/control systems of system technology: In this document, the abbreviation for Urban Rail Transit Management and Command/Control System is UGTMS: There are a wide range of operational requirements from automated train operation (GOA1) to unmanned train operation (GOA4): UGTMS is installed on some lines: GB/T 32590 does not specifically discuss public safety issues, but the safety requirements proposed are used to ensure the safety of urban rail and urban rail transportation: Public safety within the system: The main purpose of GB/T 32590 is to achieve interoperability, interchangeability and compatibility: GB/T 32590 is a recommended document for the introduction of equipment with interoperability, interchangeability and compatibility: How to use GB/T 32590 depends on the specific needs of the specific line: GB/T 32590 is also applicable to upgrading existing signal and command control systems: In this case, only the newly added UGT- The interchangeability and compatibility of MS equipment: The feasibility of upgrading existing equipment and the review of the interconnection level shall be the responsibility of the relevant operators: The transport management department shall be responsible for this: The specific application of GB/T 32590 takes into account the differences between various lines in different regions, including operational and regulatory requirements and Different safety cultures: GB/T 32590 defines a set of UGTMS functional requirements, which are divided into mandatory functions and optional functions based on a given automation level: Most required functions are executed unconditionally: Some specific functions are required under certain conditions (these conditions are usually related to The supplier provides one or more generic applications, including all the required functions and all or part of the available Select functions to meet the needs: General applications have interoperability under specific application conditions: Considering the different conditions in different places (such as track configuration and headway requirements), and customize common applications to form specific applications: Transportation management departments and suppliers also Additional functions may be added beyond general applications or specific applications: These additional functions are not described in GB/T 32590: According to GB/T 21562, the transport management department is responsible for reaching an agreement with the regulatory department to conduct a comprehensive assessment of each The functional safety level of each specific application needs to be determined by a specific risk analysis: Terms such as "safety related instructions", "safety conditions", "safe station departure" are mentioned without any hazard analysis: GB/T 32590 is intended to consist of four parts: ---Part 1: System principles and basic concepts: The purpose is to introduce the main concepts, system definition, principles and basic concepts of UGTMS: The other three parts correspond to the three steps required to standardize UGTMS (see Figure 1): --- Part 2: Functional requirements specification: The purpose is to provide a functional requirement specification based on the basic functions proposed in Part 1 and the requirements specified in Figure 3 of Part 1: System boundaries and interfaces, specifying functional requirements: FRS (Functional Requirements Specification) identifies and specifies the urban rail and urban rail transit systems Functions required for operation: Depending on the given automation level, functions are divided into two categories: mandatory functions (such as train occupancy detection) and optional functions: Unless otherwise noted, requirements for a function have Same category as the feature (Required or Optional): --- Part 3: System requirements specification: The purpose is to specify the architecture of the system and to allocate the requirements and functions identified in Part 2 to the system: SRS (System Requirements Specification) defines the framework of UGTMS, which contains the necessary and Optional UGTMS equipment: --- Part 4: Interface specification: The purpose is to achieve the interconnection and interchangeability of UGTMS devices identified in Part 3 It specifies the interface definition and the data exchange between them (FIS and FFFIS): For interfaces between UGTMS devices, logical interfaces or FIS (Functional Interface Specifications), and/or physical and logical interfaces or FFFIS (Standard Functional Interface Specification): Note: The specific structure of Part 4 will be constructed to accommodate the optional and mandatory UGTMS equipment and reflect the actual situation: If necessary in some situations, you can also define multiple FIS or FFFIS: Figure 1 The three steps followed by UGTMS In GB/T 32590, demand refers to all operational terms required to achieve safe and orderly operations as required by the transport management department: (regardless of technical solutions): GB/T 32590 selects the level of detail for the requirements description in order to enable users and transport management departments to confirm that the requirements provided by different suppliers are The generic applications provided will cover at least the same functionality as specified in this document: The requirements proposed in GB/T 32590 are clearly marked with requirement identification numbers, which are associated with the function number to which the requirement belongs: Rail transit, urban rail and urban rail transit Transportation Management and Command/Control Systems Part 1: System principles and basic concepts

1 Scope

This document provides the management and guidance of urban rail transit and urban (suburban) railway transportation using communication-based train control system technology: The main concepts, system definitions, basic principles and basic functional requirements of command/control systems: This document is applicable to new urban rail transit and urban (suburban) railway lines or upgrades of existing ones that use communication-based train control system technology: Lines with signal and command control systems for applications using the following technologies: continuous data communication; alignment of trains via train protection curves Continuous monitoring of train movement; train positioning is achieved through external ground devices or reporting trains:

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document: For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document: GB/T 21562 Specification and examples for reliability, availability, maintainability and safety of rail transit (GB/T 21562-2008, IEC 62278:2002, IDT) GB/T 24338 (all parts) Rail transit electromagnetic compatibility [IEC 62236 (all parts)] Note: GB/T 24338:1-2018 Rail Transit Electromagnetic Compatibility Part 1: General Principles (IEC 62236-1:2008, MOD); GB/T 24338:2-2018 Rail transit electromagnetic compatibility Part 2: Emissions of the entire rail system to the outside world (IEC 62236-2:2008, MOD); GB/T 24338:3-2018 Rail transit electromagnetic compatibility Part 3-1: Locomotives, rolling stock and complete vehicles (IEC 62236-3-1:2008, MOD); GB/T 24338:4-2018 Rail transit electromagnetic compatibility Part 3-2: Rolling stock equipment (IEC 62236-3-2:2008, MOD); GB/T 24338:5-2018 Rail transit electromagnetic compatibility Part 4: Emission and immunity of signal and communication equipment (IEC 62236-4: 2008,MOD); GB/T 24338:6-2018 Rail transit electromagnetic compatibility Part 5: Emission and immunity of ground power supply devices and equipment (IEC 62236-5: 2008,MOD): GB/T 24339 Rail transit communication, signaling and processing systems Safety-related communications in transmission systems (GB/T 24339- 2023,IEC 62280:2014,MOD) GB/T 28808 Rail transit communication, signaling and processing system control and protection system software (GB/T 28808-2021, IEC 62279:2015, MOD) GB/T 28809 Safety-related electronic systems for rail transit communication, signaling and processing systems (GB/T 28809- 2012,IEC 62425:2007,IDT) GB/T 32590:2 Rail transit, urban rail and urban rail transportation management and command/control systems Part 2: Functional requirements Request specification (GB/T 32590:2-2024, IEC 62290-2:2014, MOD)
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 32590.1-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 32590.1-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 32590.1-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 32590.1-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 32590.1-2024?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 32590.1-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.