GB/T 32576-2016: Guide of calculating settings of auxiliary power relay protection for pumped storage power plant
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 32576-2016579 Add to Cart 5 days Guide of calculating settings of auxiliary power relay protection for pumped storage power plant Valid

Similar standards

DL/T 5155   DL/T 5218   DL/T 5056   GB/T 51420   GB/T 51397   

Basic data

Standard ID: GB/T 32576-2016 (GB/T32576-2016)
Description (Translated English): Guide of calculating settings of auxiliary power relay protection for pumped storage power plant
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: P62
Classification of International Standard: 27.100
Word Count Estimation: 29,285
Date of Issue: 2016-04-25
Date of Implementation: 2016-11-01
Regulation (derived from): National Standard Announcement No
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 32576-2016: Guide of calculating settings of auxiliary power relay protection for pumped storage power plant


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guide of calculation settings for auxiliary power relay protection for pumped storage power plant ICS 27.100 P62 National Standards of People's Republic of China Setting Calculation of Stationary Relay Protection for Pumped Storage Power Station Guidelines 2016-04-25 released 2016-11-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface III 1 Scope 1 2 normative reference document 1 Basic Provisions 1 4 Set the calculation condition 2 5 Set the calculation principle 2 Protection of high - voltage factory transformer 2 5.2 low-voltage factory transformer protection 8 5.3 High voltage motor protection 12 5.4 high and low voltage bus protection 16 5.5 DIESEL GENERATOR PROTECTION 18 5.6 SFC Input and Output Transformer Protection 19 5.7 Standby power automatic input device 24

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuer of this document does not assume responsibility for the identification of these patents. This standard is proposed by the China Electricity Council and centralized. The main drafting unit of this standard. State Grid New Source Holdings Limited, Liaoning Pu Shihe Pumped Storage Company Limited. The main drafters of this standard. Gao Sujie, Zhang Yewu, Wu Yi, Pan Ligang, Li Jianguang, Hao Guowen, Zhang Yonghui, Wang Ning, Bi Yang, Chang Yuhong, Yibao Bao, Luan Deyan, Wu Peizhi, Luo Yin, Song Haifeng, Liang Tingting, Liu Jiabao, Yu Xiaoyan. Setting Calculation of Stationary Relay Protection for Pumped Storage Power Station Guidelines

1 Scope

This standard specifies the principle and method of setting the relay protection for the auxiliary power system of the pumped storage power station. This standard applies to pumped storage power station high-voltage transformer transformer protection, low-voltage transformer transformer protection, high-voltage factory motor protection, high Low voltage plant bus protection, diesel generator protection, SFC input and output transformer protection, standby power supply automatic device setting Calculation.

2 normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. Technical specification for relay protection and safety automatic device GB/T 14285 GB/T 15544.1 Calculation of short circuit currents for three phase AC systems - Part 1. Current calculation Guide for calculation of short - circuit current in three - phase AC system for hydropower engineering Code for design of relay protection for NB/T 35010 hydroelectric power plant

3 Basic Provisions

3.1 relay protection device should meet the reliability, selectivity, speed, sensitivity of the basic requirements. 3.2 The setting calculation should follow the principle of action value and action time level. 3.3 set the calculation content should include high-voltage factory transformer high and low voltage side, low-voltage transformer transformer high and low voltage side, SFC input transformer level Pressure side, SFC output transformer high and low voltage side of the three-phase short circuit, two-phase short circuit, single-phase ground short-circuit current calculation. 3.4 factory power short-circuit current calculation principle. a) Follow the instructions in accordance with GB/T 15544.1, NB/T 35043. b) Excluding the resistance components in the impedance parameters such as generators, transformers, motors and so on; it can be assumed that the negative sequence impedance of the generator Positive sequence impedance is equal. c) The positive sequence impedance of the generator motor may be the saturation value of the secondary transient reactance Xd ". d) The equivalent electromotive force (nominal value) of each generator motor can be assumed to be 1 and the phase is consistent. e) only calculate the short-circuit transient current in the periodic component, but in the longitudinal differential protection device (referred to as longitudinal protection) in the setting calculation to The nonperiodic component coefficient Kap takes into account the influence of the aperiodic component. f) The generator voltage should be rated voltage, the system side voltage can be rated voltage or the average rated voltage, regardless of Variation of Actual Position of Transformer Voltage Tap. g) The phase-to-earth transition resistance excluding the point of failure. 3.5 The setting of the relay protection related to the operating mode shall be calculated in the normal operation mode, in the minimum mode of operation Check sensitivity.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 32576-2016_English be delivered?

Answer: Upon your order, we will start to translate GB/T 32576-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 32576-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 32576-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.