GB/T 32574-2016: Guide of maintenance for pumped-storage power station
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 32574-20161599 Add to Cart 10 days Guide of maintenance for pumped-storage power station Valid

Similar standards

DL/T 345   DL/T 805.4   DL/T 435   GB/T 43794   GB/T 37141.1   

Basic data

Standard ID: GB/T 32574-2016 (GB/T32574-2016)
Description (Translated English): Guide of maintenance for pumped-storage power station
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: F23
Classification of International Standard: 27.100
Word Count Estimation: 80,869
Date of Issue: 2016-04-25
Date of Implementation: 2016-11-01
Regulation (derived from): National Standard Announcement No
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 32574-2016: Guide of maintenance for pumped-storage power station

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guide of maintenance for pumped-storage power station ICS 27.100 F23 National Standards of People's Republic of China Guidance on maintenance of pumped storage power station 2016-04-25 released 2016-11-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface III 1 Scope 1 2 normative reference document 1 3 Terms and definitions 2 4 General 3 5 units and ancillary equipment 4 5.1 General provisions 4 5.2 Pump Turbine and ancillary equipment 5 5.3 Generating motor and auxiliary equipment 5 5.4 Unit maintenance after the test 5 High voltage electrical equipment 5 6.1 General provisions 5 6.2 main transformer 6 6.3 high voltage cable 6 6.4 Gas Insulated Metal Closed Switchgear (GIS) 6 6.5 Gas insulated metal closed transmission line (GIL) 6 6.6 Generator outlet voltage equipment 7 7 power supply system 7 7.1 General provisions 7 7.2 Maintenance items and quality requirements 8 8 Static drive (SFC) 8 8.1 General provisions 8 8.2 Maintenance items and quality requirements 8 Monitoring System 9.1 General provisions 8 9.2 Inspection items and quality requirements 9 10 relay protection and safety automatic device 9 10.1 General provisions 9 10.2 Maintenance items and quality requirements 11 Auxiliary auxiliary equipment 11.1 General provisions 10 Oil system 11.3 Water supply and drainage system 10 Compressed air system 12 DC equipment 11 12.1 General provisions 11 12.2 Maintenance items and quality requirements 11 13 metal structure 11 13.1 General provisions 11 13.2 Pressure steel pipe 12 13.3 gate 12 13.4 Hoist 12 Appendix A (informative) Pumping and storage power station maintenance standards and quality requirements 13

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuer of this document does not assume responsibility for the identification of these patents. This standard is proposed by the China Electricity Council and centralized. The drafting of this standard unit. State Grid New Source Holdings Limited, China Southern Power Grid Shoufeng FM Power Generation Company, State Grid New Source Holdings Limited North Beijing Shisanling storage power plant. The main drafters of this standard. Lin Ming Shan, Feng Yiping, Chen Tao, Li Guohe, Cao Xinmin, Zhang Heng, Zeng Guangxuan, Lai Jiangbo, Zhang Yonghui, Zhu Haifeng, Song Xianghui, Liu Fu, Song Xufeng, Gong Kui, Li Donghua, Di Hongwei, Yang Wendao, Zhang Xi, Hu Qingjuan, Shi Meilin, Yang Xiaolong, Gong Yu, Li Dehua, Peng Cheng Guidance on maintenance of pumped storage power station

1 Scope

This standard specifies the principle, project and quality requirements of the main equipment maintenance of the pumped storage power station. This standard applies to the installed capacity of 250MW and above the pumped storage power station, 250MW below the pumped storage power plant reference to the Standard implementation.

2 normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. GB 150 (all parts) pressure vessel GB/T 4980 Volumetric compressor noise determination Mechanical electrical machinery - Electrical equipment - Part 1. General technical requirements GB 5226.1 GB/T 5616 Guidelines for non - destructive testing GB/T 5972 crane wire rope maintenance, maintenance, installation, inspection and scrapping GB/T 7595 Transformer oil quality during operation Quality of Turbine Oil in Operation of GB/T 7596 Power Plant GB/T 7597 Sampling method for power oil (transformer oil, turbine oil) Measurement and Evaluation of Mechanical Vibration of GB/T 7777 Volumetric Compressor Basic technical conditions of GB/T 7894 hydro - generator Specification for installation of GB/T 8564 hydro - generator sets GB/T 8905 Guidelines for gas management and testing of sulfur hexafluoride electrical equipment Technical condition of hydraulic turbine control system GB/T 9652.1 GB/T 10597 hoist type hoist GB 11120 Turbine oil Code for manufacture, installation and acceptance of steel gates for water conservancy and hydropower engineering GB/T 14173 Technical specification for relay protection and safety automatic device GB/T 14285 GB/T 14627 hydraulic hoist Code for commissioning of GB/T 18482 reversible pumped storage unit GB/T 20834 basic technical conditions for generating electric motors GB/T 22384 Power system safety and stability control system inspection specification GB/T 22581 basic technical conditions for Francis turbine turbines Technical Guidance for On - line Monitoring System for Hydrogenerator Status of GB/T 28570 GB/T 29531 Pump vibration measurement and evaluation method GB 50150 electrical installations installation engineering electrical equipment transfer test standards General specification for construction and acceptance of mechanical equipment installation engineering GB 50231 Code for installation and acceptance of pressure steel pipes for hydropower and water conservancy projects GB 50766 Evaluation Criteria for Cavitation Erosion of DL/T 444 Counterattack Turbine
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 32574-2016_English be delivered?

Answer: Upon your order, we will start to translate GB/T 32574-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 10 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 32574-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 32574-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.