Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 32455-2024 English PDF

GB/T 32455: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 32455-2024RFQ ASK 3 days Space terminology - Transportation system Valid
GB/T 32455-2015348 Add to Cart 1 days Terminology of launch vehicle Valid

Similar standards

GB/T 43223   GB/T 32453   GB/T 32452   

Basic data

Standard ID: GB/T 32455-2024 (GB/T32455-2024)
Description (Translated English): Space terminology - Transportation system
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: V70
Classification of International Standard: 49.02
Word Count Estimation: 106,160
Date of Issue: 2024-08-23
Date of Implementation: 2025-03-01
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 32455-2024: Space terminology - Transportation system

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 49.02 CCSV70 National Standard of the People's Republic of China Replaces GB/T 32455-2015 Aerospace terminology transportation system Released on 2024-08-23 2025-03-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III 1 Scope 1 2 Normative references 1 3 General terms 1 4 General terminology 6 5 Terminology of structural systems, mechanisms and pyrotechnic devices 41 6 Powertrain Terminology 50 7 Electrical System Terminology 55 8 Launch Support System Terminology 62 9 Terminology of assembly, testing and launch processes 65 References 68 Index 69

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document replaces GB/T 32455-2015 "Launch Vehicle Terminology". Compared with GB/T 32455-2015, except for structural adjustment and editing, In addition to the functional changes, the main technical changes are as follows. a) The scope has been changed (see Chapter 1, Chapter 1 of the.2015 edition). b) Chapter 3 adds space transportation systems, liquid launch vehicles, solid launch vehicles, solid-liquid hybrid launch vehicles, small launch vehicles rocket, medium launch vehicle, large launch vehicle, heavy launch vehicle, final stage, thermal control system (see 3.1, 3.7, 3.8, 3.9, 3.13, 3.14, 3.15, 3.16, 3.27, 3.40); changed the launch vehicle, disposable launch vehicle, reusable launch vehicle, orbital transfer vehicle, rapid response launch vehicle, stage, structural system, power system, pressurization and delivery system, electrical system, control system, measurement control and communication system, propellant utilization system, ground test and launch control system, launch support system, loading, interface control file, storage period, carrying capacity, flight test (see 3.3, 3.4, 3.5, 3.6, 3.10, 3.21, 3.28, 3.30, 3.32, 3.33, 3.34, 3.35, 3.36, 3.38, 3.39, 3.42, 3.43, 3.44, 3.45, 3.46;.2015 edition 2.2, 2.3, 2.4, 2.14, 2.5, 2.12, 2.18, 2.20, 2.22, 2.23, 2.24, 2.25, 2.26, 2.30, 2.31, 2.32, 2.33, 2.34, 2.35, 2.36); deleted the power supply and distribution system (See 2.29 of the.2015 edition). c) Chapter 4 subdivides the general terminology into general and performance, flight dynamics and control, loads and dynamic characteristics, aerodynamics, aerothermal, Mechanical environment, thermal environment, electromagnetic environment, natural environment, corresponding to Chapters 3 to 11, 13, and 20 of the.2015 edition Related content. added tank theoretical volume, tank total volume, rocket body axis deviation, payload separation, launch reliability, flight Reliability, flight safety, fault detection and handling, mission re-planning, system reconfiguration, launch vehicle health management, zero-altitude escape Life-saving flight test, return trajectory, reentry point, calculation of filling parameters, earth flattening, earth gravitational constant, earth rotation angular velocity degrees, average radius of the earth, vertical deviation, geographic vertical, standard gravity acceleration, gravity acceleration, gravitational acceleration, disturbed gravity Acceleration, astronomical latitude, astronomical longitude, geocentric latitude, geodetic latitude, geodetic longitude, direct orbit entry, indirect orbit entry, landing point deviation, Load reduction control, modal test, stagnation point, transition, Prandtl-Meyer flow, Knudsen number, transition flow, continuous flow, boundary layer, friction resistance force, wave drag, Magnus force, aeroelasticity, wingspan, chord, aspect ratio, trapezoidal wing, delta wing, swept wing, airfoil mid-camber, wing Profile thickness, relative airfoil thickness, average aerodynamic chord, wing mounting angle, Prandtl number, Nusselt number, specific heat ratio, constant pressure specific heat, constant volume Specific heat, convective heat transfer coefficient, beat, beat frequency, resonance, anti-resonance, power spectrum density, floating, grounded, salt spray (see 4.1.21, 4.1.22, 4.1.43, 4.1.49, 4.1.56~4.1.62, 4.1.68, 4.2.1.12, 4.2.1.13, 4.2.1.19, 4.2.1.23~4.2.1.37, 4.2.1.79, 4.2.1.80, 4.2.3.42, 4.2.4.14, 4.3.43, 4.4.6, 4.4.7, 4.4.9, 4.4.10, 4.4.12, 4.4.13, 4.4.46~ 4.4.48, 4.4.50~4.4.54, 4.4.56~4.4.63, 4.5.4, 4.5.5, 4.5.12~4.5.15, 4.6.9~4.6.12, 4.6.24, 4.8.3, 4.8.4, 4.9.4); changed the take-off mass, stop-fire mass, stop-fire mass ratio, structural coefficient, ballistic available mass, gas Dynamic layout, fairing separation, separation surface, escape tower, ignition test, electrical matching test, active section trajectory, powered flight section, passive Segment trajectory, sun-synchronous orbit, navigation, satellite navigation, astronomical navigation, guidance law, aftereffect error, accuracy analysis, yaw channel transmission Function, zeroing, service load, safety factor, lateral overload, lateral load, ground operating load, variable coefficient sway damping coefficient, Vibration shape, load coupling analysis, dynamic pressure, molecular mean free path, aerodynamic normal force, aerodynamic axial force, aerodynamic lateral force, wind tunnel, Reynolds Number, octave, free vibration, passive thermal control, contact thermal resistance, radiation sensitivity, additional radiation, salt spray test (see 4.1.3, 4.1.4, 4.1.6, 4.1.7, 4.1.16, 4.1.46, 4.1.47, 4.1.52, 4.1.67, 4.1.73, 4.1.74, 4.2.1.6, 4.2.1.7, 4.2.1.11, 4.2.1.67, 4.2.2.1, 4.2.2.7, 4.2.2.8, 4.2.3.7, 4.2.3.20, 4.2.3.46, 4.2.4.16, 4.2.4.21, 4.3.6, 4.3.7, 4.3.19, 4.3.22, 4.3.29, 4.3.38, 4.3.40, 4.3.42, 4.4.4, 4.4.8, 4.4.26, 4.4.27, 4.4.28, 4.4.37, 4.4.40. 4.6.4, 4.6.8, 4.7.5, 4.7.6, 4.8.6, 4.8.8, 4.9.9;.2015 version 3.4, 3.5, 3.7, 3.8, 3.17, 3.44, 13.9, 13.4, 20.5, 24.11, 24.10, 4.6, 4.7, 4.11, 4.50, 16.7, 16.13, 16.14, 16.6, 16.29, 16.54, 16.78, 16.83, 5.6, 5.7, 5.19, 5.21, 5.29, 5.38, 5.40, 5.42, 6.4, 6.6, 6.20, 6.21, 6.22, 6.31, 6.34, 8.4, 8.9, 9.5, 9.6, 10.4, 10.6, 11.8); deleted the total mass after filling, 1/3 octave, igniter, escape mode (see 3.2, 8.5, 13.15, 20.6). d) Chapter 5 subdivides the structural system into structural system, mechanism, and pyrotechnic device, deletes the separation system, and adds mechanism, pyrotechnic device The content of Chapter 12 and Chapter 13 of the.2015 edition is corresponding to the content of the main structure, secondary structure, point separation device, line Separation device, section docking coordination diagram, unlocking time, structural failure mode, harmful deformation, fracture, instability, local buckling, mechanical Structure, connection and separation mechanism, hook unlocking mechanism, connecting rod lock hook unlocking mechanism, air drive unlocking mechanism, electric drive internal support separation mechanism, electric Drive and separation nut mechanism, stacking satellite compression release mechanism, speed transmission mechanism, rudder transmission mechanism, thrust mechanism, air-driven thrust machine structure, support mechanism, deformation mechanism, grid wing deployment mechanism, shading mechanism, buffer mechanism, hanging rope mechanism, landing buffer mechanism, damping Mechanism, landing gear retraction and extension mechanism, pyrotechnic system, ignition system, explosion sequence, terminal device, electric pyrotechnics, semiconductor bridge pyrotechnics, Electric detonator, non-electric detonator, laser detonator, mechanical detonator, partition igniter, explosive bolt, separating nut device, connection Push device, cutter, pusher, pin puller, gas actuator, gas generator, exploder, detonation transmission assembly, manifold, restrictive Detonating cord, output connector, detonating cord, flexible detonating cord, cutting cord, shaped energy cutting cord separation device, flexible detonating cord separation device, Expansion tube-groove plate separation device, expansion tube-notch bolt separation device, air bag separation device (see 5.1.1, 5.1.2, 5.1.27, 5.1.28, 5.1.37, 5.1.44~5.1.49, 5.2.1~5.2.21, 5.3.1~5.3.4, 5.3.7, 5.3.8, 5.3.10~5.3.14, 5.3.16~5.3.28, 5.3.30~5.3.37); changed the tail section, tail wing, wave-transmitting port, user identification, pyrotechnic device, pyrotechnic products, pyrotechnics Working devices, rope-type explosive devices (see 5.1.7, 5.1.8, 5.1.21, 5.1.24, 5.3.5, 5.3.6, 5.3.15, 5.3.29;.2015 edition 12.6, 12.7, 12.19, 12.22, 13.12, 13.13, 13.16, 13.18). e) Chapter 6 subdivides the power system into the engine and the booster delivery system, which corresponds to the relevant contents of Chapters 14 and 15 of the.2015 edition. Capacity; added chemical rocket engine, non-chemical rocket engine, area ratio, active exhaust, thrust pulsation, ruptured diaphragm (see 6.1.3, 6.1.4, 6.1.22, 6.2.18, 6.2.21, 6.2.31); changed the liquid rocket engine, pump-type liquid rocket engine, Open cycle, closed cycle, vacuum thrust, aftereffect impulse, full system test, booster system, conveying system, gas storage booster, chemical Pressurization, electric explosion valve, filling and discharge valve, cleaning and discharge valve, propellant management system, bottom sinking, intermittent bottom sinking, longitudinal coupling vibration, pressure storage pressure signal device (see 6.1.5, 6.1.7, 6.1.10, 6.1.11, 6.1.14, 6.1.26, 6.1.30, 6.2.1, 6.2.2, 6.2.4, 6.2.5, 6.2.10, 6.2.12, 6.2.13, 6.2.14, 6.2.15, 6.2.17, 6.2.19, 6.2.20, 6.2.24; 14.3, 14.5,.2015 edition 14.8, 14.9, 14.12, 14.23, 14.28, 15.1, 15.2, 15.4, 15.5, 15.10, 15.12, 15.13, 15.23, 15.24, 15.26, 15.27, 15.28, 15.16). f) Chapter 7 subdivides the electrical system into control system, measurement and control and communication system, fault detection and handling system, propellant utilization system, The rocket power supply and distribution system and the ground test and launch control system correspond to Chapters 16 to 19, 21 and 22 of the.2015 edition. Related content; added accelerometer, mathematical simulation test, semi-physical simulation test, sensor, camera device, image compressor, application Answering machine, transmitter, using liquid level processor (see 7.1.6, 7.1.16, 7.1.17, 7.2.2, 7.2.4, 7.2.5, 7.2.11, 7.2.22, 7.4.7); Changed the rate gyro, separation electrical connector, code rate, start level, data synthesizer, acquisition unit, safety instructions Receiver, fault judgment, secondary power supply, ground power supply, leakage inspection, back-end equipment, ground power supply (see 7.1.5, 7.1.13, 7.2.1, 7.2.8, 7.2.12, 7.2.13, 7.2.24, 7.3.8, 7.5.3, 7.5.4, 7.5.8, 7.6.6, 7.6.12; 16.100 of the.2015 edition, 16.107, 17.1, 17.5, 17.8, 17.9, 17.19, 19.8, 21.3, 21.5, 21.9, 22.6, 22.13); deleted the terminal, protocol, data Data bus, data bus controller, data bus monitor, remote terminal, data bus load rate, variable frequency power supply, decision support (See 16.110, 16.111, 16.112, 16.113, 16.114, 16.115, 16.116, 21.4, 22.8 of the.2015 edition). g) Chapter 8 subdivides the launch support system into workshop stations, filling and gas supply, and initial alignment, corresponding to Chapter 16, Chapter 23 and Chapter 24; Added hazardous spacecraft operation plant (see 8.1.7); Changed the launch site, launch Area, launch vehicle horizontal plant, launch vehicle vertical plant, spacecraft plant, filling system (see 8.1.1, 8.1.3, 8.1.4, 8.1.5, 8.1.6, 8.2.2; 23.1, 23.3, 23.4, 23.5, 23.6, 23.16 of the.2015 edition). h) Chapter 9 subdivides the assembly, test and launch process into assembly, test and launch process, corresponding to the relevant content of Chapter 24 of the.2015 edition Added interference check, ergonomics analysis, assembly simulation, single item check, process simulation, interactive electronic technical manual (see 9.1.8~9.1.10, 9.2.5, 9.2.11, 9.2.12); changed the docking, cover closing, subsystem test, pre-launch inspection (see 9.1.2, 9.1.3, 9.2.4, 9.2.6; 24.3, 24.5, 24.13, 24.14 of the.2015 edition; deleted the loop resistance test and ratchet cable (see.2015 edition Version 24.22, 24.23). Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed and coordinated by the National Technical Committee for Standardization of Aerospace Technology and Its Applications (SAC/TC425). This document was drafted by. Beijing Institute of Aerospace Systems Engineering, Shanghai Institute of Aerospace Systems Engineering, Beijing Zhongke Aerospace Technology Co., Ltd. Department of Aerospace Standardization, China Aerospace Standardization Institute. The main drafters of this document are. Su Han, Chen Xiaofei, Zeng Yaoxiang, Chen Shiqiang, Zhang Zhiguo, Zhang Puzhuo, Li Changlong, Qi Feng, Xiong Tianci, Jin Jie, Peng Xueyan, Zhou Zhiyong, Tang Ke, Ma Hongpeng, Dou Zhenfei, Li Jia, Zhou Youjun, Wang Dan, Zhu Liangcong, Wu Zhiliang, Yang Haoliang, Xu Yan. This document was first published in.2015 and this is the first revision. Aerospace terminology transportation system

1 Scope

This document defines the general, overall, structural systems, mechanisms and pyrotechnics, power systems, electrical systems, launch support Terms and definitions for support systems, assembly, testing, and launch processes. This document applies to the design, production, testing and launch of space transportation systems.

2 Normative references

This document has no normative references.

3 General terms

3.1 Transportation between the Earth's surface and space orbits (including suborbitals), between orbits, and between stars and space orbits A general term for transport vehicles with various payloads. Note. Includes disposable launch vehicles, orbital transfer vehicles, reusable launch vehicles, etc. 3.2 rocket An aircraft that carries its own propellant and generates thrust directly by the reaction principle. 3.3 launch vehicle; LV Vehicle A rocket that sends a payload into space orbit from the Earth's surface or air, or a rocket that changes the payload's orbit. 3.4 Disposable carrier A launch vehicle/carrier that can only perform one launch mission. Note. After separation from the payload, it is usually destroyed during re-entry into the atmosphere. 3.5 Reusable Launch Vehicle A launch vehicle/vehicle that can be used multiple times. Note. Generally, they can be divided into partially reusable launch vehicles/vehicles and fully reusable launch vehicles/vehicles. 3.6 Upper stage A relatively independent stage (or stages) added to a launch vehicle. After the launch vehicle is launched into a quasi-Earth orbit or Earth orbit,
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 32455-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 32455-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 32455-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 32455-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 32455-2024?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 32455-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.