Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 31518.1-2015 English PDF

US$319.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 31518.1-2015: Direct-drive permanent magnet type wind turbine generator system -- Part 1: Technical condition
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 31518.1-2015319 Add to Cart 3 days Direct-drive permanent magnet type wind turbine generator system -- Part 1: Technical condition Valid

Similar standards

GB/T 25388.1   GB/T 25387.1   GB/T 25389.2   GB/T 31517.1   GB/T 31519   GB/T 31518.2   

Basic data

Standard ID: GB/T 31518.1-2015 (GB/T31518.1-2015)
Description (Translated English): Direct-drive permanent magnet type wind turbine generator system -- Part 1: Technical condition
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: F11
Classification of International Standard: 27.180
Word Count Estimation: 15,116
Date of Issue: 2015-05-15
Date of Implementation: 2016-02-01
Quoted Standard: GB/T 191; GB/T 2900.18; GB/T 2900.53; GB/T 6388; GB/T 12325-2008; GB/T 12326-2008; GB 12668.3; GB/T 14549-1993; GB/T 15543-2008; GB/T 15945-2008; GB 16895.3-2004; GB 18451.1; GB/T 19069; GB/T 19072-2010; GB/T 19292.1-2003; GB/T 19568-2004; GB/T 19960.1-2005; GB/T 19963-2011; GB/T 25383-2010; GB/T 25387.1; GB/T 25389.1; GB/T 25389.2; GB/Z 25427; GB/Z 25458; GB/T 31518.2; JB/T 10425.1; ISO 4406
Regulation (derived from): National Standard Announcement 2015 No. 15
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This Standard specifies the direct-drive permanent magnet wind turbine environmental conditions, technical requirements, test methods, inspection rules, and storage, delivery and other requirements. This section applies to rotor swept area greater than 200 square meters of the horizontal axis wind turbine permanent magnet direct-drive product design, manufacturing, packaging, transportation and testing.

GB/T 31518.1-2015: Direct-drive permanent magnet type wind turbine generator system -- Part 1: Technical condition


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Direct-drive permanent magnet type wind turbine generator system - Part 1. Technical condition ICS 27.180 F11 National Standards of People's Republic of China Direct drive permanent magnet wind turbine Part 1. Technical conditions Part 1. Technicalcondition Issued on. 2015-05-15 2016-02-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

GB/T 31518 "direct drive permanent magnet wind turbine" is divided into two parts. --- Part 1. Technical conditions; --- Part 2. Test methods. This section GB/T Part of 131,518. This section drafted in accordance with GB/T 1.1-2009 given rules. This part is proposed by China Machinery Industry Federation. This part of the National Standardization Technical Committee of the wind machine (SAC/TC50) centralized. This section is drafted. Xinjiang Goldwind Science & Technology Co., Ltd., Beijing Branch Goldwind Wind Power Equipment Co., Ltd., Beijing Tiancheng Tongchuang electrical Gas Co., Ltd., Xiangtan Electric Company. The main drafters of this section. Xiang Ming Gejun Hao, Tang Hao, Gan Xu Chao, Li Huixun, Joe Yuan, Tang Xin, Xiesheng Qing Long oct. Direct drive permanent magnet wind turbine Part 1. Technical conditions

1 Scope

GB/T 31518 provisions of this part of the direct-drive permanent magnet wind turbine environmental conditions, technical requirements, test methods, inspection rules As well as storage, delivery and other requirements. This section applies to rotor swept area greater than 200m2 of horizontal axis wind turbine permanent magnet direct-drive (hereinafter referred to as "units") Products Design, manufacturing, packaging, transportation and inspection.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any revisions) applicable to this document. GB/T 191 Packaging - Pictorial signs GB/T 2900.18 Electrotechnical term low-voltage electrical GB/T 2900.53 Electrotechnical terminology Wind Turbine GB/T 6388 transport package shipping mark GB/T 12325-2008 power quality supply voltage deviation GB/T 12326-2008 power quality voltage fluctuation and flicker GB 12668.3 speed electric drive systems - Part 3. EMC requirements and specific test methods GB/T 14549-1993 power quality utility grid harmonic GB/T 15543-2008 power quality three-phase voltage unbalance GB/T 15945-2008 power quality power system frequency deviation Part 5-54 GB 16895.3-2004 Electrical installations of buildings. Selection and erection of electrical equipment grounding configuration protection guide Body and protective bonding conductors GB 18451.1 wind turbine design requirements GB/T 19069 wind turbine controller Technical conditions GB/T 19072-2010 wind turbine tower Corrosivity of atmospheres - Classification GB/T 19292.1-2003 metals and alloys GB/T 19568-2004 wind turbine assembly and installation specifications GB/T 19960.1-2005 wind turbines - Part 1. General requirements GB/T 19963-2011 wind farm power system technical requirements GB/T 25383-2010 wind turbine rotor blades GB/T 25387.1 wind turbine full power converters - Part 1. Technical conditions GB/T 25389.1 low-speed permanent magnet synchronous wind turbine generators - Part 1. Technical conditions GB /Part 2 T 25389.2 low-speed permanent magnet synchronous wind turbine generators. Test methods GB /Z25427 wind turbine lightning protection GB /Z25458 wind turbine qualified certification rules and procedures Test Method. GB/T 31518.2 wind turbine permanent magnet direct-drive Part 2
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 31518.1-2015_English be delivered?

Answer: Upon your order, we will start to translate GB/T 31518.1-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 31518.1-2015_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 31518.1-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.