GB/T 30217.2-2016 English PDFUS$1674.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 30217.2-2016: Petroleum and natural gas industries -- Drilling and production equipment -- Part 2: Deepwater drilling riser analysis methodologies, operations and integrity Status: Valid
Basic dataStandard ID: GB/T 30217.2-2016 (GB/T30217.2-2016)Description (Translated English): Petroleum and natural gas industries -- Drilling and production equipment -- Part 2: Deepwater drilling riser analysis methodologies, operations and integrity Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: E92 Classification of International Standard: 75.180.10 Word Count Estimation: 84,888 Date of Issue: 2016-04-25 Date of Implementation: 2016-08-01 Regulation (derived from): National Standard Announcement No Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 30217.2-2016: Petroleum and natural gas industries -- Drilling and production equipment -- Part 2: Deepwater drilling riser analysis methodologies, operations and integrity---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Petroleum and natural gas industries - Drilling and production equipment - Part 2. Deepwater drilling riser analysis methodologies, operations and integrity ICS 75.180.10 E92 National Standards of People's Republic of China Oil and gas industry drilling and oil extraction equipment Part 2. Analytical methods for deepwater drilling risers, Operation and integrity Part 2. Deepwaterdrilingriseranalysismethodologies, operationsandintegrity (ISO /T R13624-2..2009, Petroleumandnaturalgasindustries-Drilingand productionequipment-Part 2. Deepwaterdrilingrisermethodologies, operations andintegritytechnicalreport, IDT) 2016-04-25 release.2016-08-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface Ⅴ 1 Scope 1 2 normative reference document 1 3 Terms and definitions 1 4 Abbreviations 6 5 Coupled drilling riser and/or conduit analysis method and working example 6 5.1 Coupling method 6 5.2 decoupling method 6 5.3 Analysis Considerations 6 5.4 Modeling 9 5.5 Coupled pipe analysis Relief analysis of riser 5.7 Example of work 19 5.8 Basic analysis conditions 5.9 Model Description and Analysis Process 5.10 Results 27 6 drift and drive analysis methods and examples 27 6.1 drift analysis method 27 6.2 Example 32 7 Backflush analysis methods and working examples7.1 Introduction 46 7.2 Basic information 46 7.3 Required information 52 7.4 Performance Criteria 58 7.5 Practicality of the example 61 References 79 Fig.1 Configuration and coupling analysis model of drilling riser system Figure 2 configuration and decoupling analysis model of drilling riser system Figure 3 Simplified tensioner model Figure 4 Simplified tensioner model 2 11 Figure 5 Nonlinear beam tensioner model 12 Figure 6 Nonlinear spring tensioner model 12 Figure 7 Decoupling Analysis Ratio Coupling Analysis of Conservative Percentage and Water Depth Functions 17 Figure 8 Comparison of coupling and decoupling analysis of LFJ rotation angle as a floating drilling device offset function Figure 9 3048m (10000ft) water depth pipe configuration diagram 21 Figure 10 Coupling model of the bending range curve 28 Figure 11 The lateral deflection range curve of the coupling model Figure 12 Coupling and Decoupling Model Overlay Curve Curve 29 Figure 13 Coupling and Decoupling Model Overlay Lateral Deflection Range Curve 29 Figure 14 drift analysis flow chart 30 Figure 15 3048m (10000ft) water depth working example riser arrangement diagram 35 Figure 16 Schematic diagram of wellhead and catheter and/or casing arrangement Fig. 10 shows the variation of the displacement of the floating drilling device with time Figure 18 Schematic diagram of stress and strain curve Figure 19 Mean stroke length and top tension as a function of offset 43 Figure 20 TJ stroke and flexible joint rotation function as a function of offset 44 Figure 21 Von Mises stress of the riser and casing and the function of the wellhead as a function of the offset. Figure 22 Wire Rope Tensioner for High Pressure Air and/or Oil Accumulator (from Young et al. (1992a)) 47 Figure 23 High-pressure side of the air with a wire rope tensioner (Retsco international license) 48 Figure 24 Wire Rope Tensioner with High Pressure and Low Pressure Accumulator [from Puccio and Nuttal (1998), Stahl and Abbassian (2000)] 49 Figure 25 Direct acting tensioning system 50 Figure 26 does not take into account the operating tension range of riser recovers Figure 27 Working example of the tensioner structure 67 Figure 28 Relationship between tension and time Figure 29 TJ stroke and time relationship Figure 30 LMRP displacement and time relationship Figure 31 Stretch stroke and time relationship 71 Figure 32 Control valve stroke and time relationship 71 Figure 33 Tension and time relationship of 8 phase angle risers Figure 34 TJ stroke versus time relationship for 8 phase angles Figure 35 Offset under LMRP Spacing 73 Figure 36 shows the relationship between TJ and time in seawater, without offset and 10675kN (2400kips) maximum operating conditions. Figure 37 TJ contact force and the relationship between time 75 Fig. 38 Study on the parameters of grid refinement and stiffness at 45 ° phase angle Figure 39 without offset and 8807.5kN (1980kips) Maximum connection conditions TJ stroke 76 Figure 40 8807.5kN (1980kips) The reaction force of the TJ under the maximum connection condition (showing the most serious phase angle) 76 Figure 41 Consider the operation of the riser recoil Figure 77 Table 1 Input parameters for drilling pipe analysis model 9 Table 2 Floating Drilling Unit Dimensions 19 Table 3 3048m (10000ft) water depth of the riser configuration 20 Table 4 TJ Performance 22 Table 5 Tightening System Details 22 Table 6 Weight and size of the equipment Table 7 Performance of catheters and sleeves Table 8 Damping coefficient along the riser 23 Table 9 Current Profile 24 Table 10 Soil data 25 Table 11 Wave data 25 Table 12 Floating Drilling Unit with Cycles of 11.47s Table 13 Decoupling simulation results of risers Table 14 Floating Drilling Unit Dimensions 32 Table 15 Example of riser configuration Table 16 Telescopic joint properties 36 Table 17 tensioner system 36 Table 18 Weight and size of the equipment 36 Table 19 Conduits and sleeves 36 Table 20 Damping coefficient along the riser 38 Table 21 Current Profile Table 22 Variation of Floating Drilling Unit with Time Table 23 Soil data Table 24 Criteria for Release Criteria Table 25 Release Criteria 45 Table 26 Drilling Boat 60 ° Boat Boosting RAO 62 Table 27 Assumed environmental conditions 63 Table 28 Typical upsheating and period 63 Table 29 3048m (10000ft) Configured riser 64 Table 30 Valve CV and Stroke 66 Table 31 TJ stroke change source 68ForewordGB/T 30217 "Oil and gas industry drilling and oil recovery equipment" is divided into two parts. - Part 1. Design and operation of offshore drilling riser equipment; Part 2. Analytical methods, operations and completeness of deepwater drilling risers. This part is part 2 of GB/T 30217. This part is drafted in accordance with the rules given in GB/T 1.1-2009. This part uses the translation method equivalent to ISO /T R13624-2..2009 "Oil and gas industry drilling and oil extraction equipment Part 2 . Technical Report on the Method, Operation and Integrity of Deepwater Drilling. This part also makes the following editorial changes. --- modified the standard name, the original name "deepwater drilling riser method, operation and integrity of technical report" changed to the part name Called "deepwater drilling riser analysis method, operation and integrity". This part of the National Petroleum Drilling Equipment and Tools Standardization Technical Committee (SAC/TC96) proposed and centralized. This part of the drafting unit. National Oil and Gas Drilling Equipment Engineering Technology Research Center, Baoji Petroleum Machinery Co., Ltd., CNOOC Oilfield Services Co., Ltd. Drilling Research Institute, Yancheng City, Jiangsu Province, Jianhu County Yongwei Valve Co., Ltd., CNOOC Energy Development Co., Ltd. Division Pipeline Engineering Branch, China Petroleum Group Drilling Engineering Technology Research Institute of drilling machinery, Sichuan Honghua Petroleum Equipment Co., Ltd. The main drafters of this part. Wang Dingya, Yang Yugang, Wang Yaofeng, Sun Juan, Yan Bo, Jin Guolin, Zhang Hongbo, Liu Yang, Gao Hang. Oil and gas industry drilling and oil extraction equipment Part 2. Analytical methods for deepwater drilling risers, Operation and integrity1 ScopeThis part of GB/T 30217 is suitable for mobile marine drilling equipment with underwater BOP units. This part of GB/T 30217 The analytical method for the discussion of drilling risers is applicable to GB/T 30217.1. For an explanation of these analytical methods, see GB/T 30217.1.2 normative reference documentsThe following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. Petroleum and natural gas industries - Drilling and oil recovery equipment - Part 1. Installation of marine drilling riser equipment GB/T 30217.1-2013 (ISO 13624-1..2009, IDT) Design, Selection, Operation and Maintenance of Ocean Drilling Watertight System (APIRP16Q..1993) andMaintenanceofMarineDrilingRiserSystems)3 terms and definitionsThe following terms and definitions apply to this document. 3.1 Accumulator (for BOP) accumulator A pressure vessel filled with a gas (e.g., nitrogen) in the upper part of the liquid level is used to store the hydraulic fluid under pressure to operate the BOP. 3.2 Accumulator (for riser tensioner) accumulator The upper part of the liquid level is filled with a pressure vessel (for example, nitrogen), and the high pressure gas from the tensioner cylinder is added to the pressure vessel gas side Pressure, the supply of high pressure hydraulic fluid to stimulate the riser tensioner cylinder. 3.3 Air buoyancy air-canbuoyancy Top closed, bottom open air cylinder generated by the buoyancy of the buoyant force applied to the riser string, the cylinder in the water pipe outside the surrounding shape Into an inflatable annulus. 3.4 Annoying annulus When a tube is inside the other tube, the space between the two tubes. 3.5 Apparent weight Effective weight Underwater weight submergedweight The weight of the riser in the air is reduced by the buoyancy. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 30217.2-2016_English be delivered?Answer: Upon your order, we will start to translate GB/T 30217.2-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 30217.2-2016_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 30217.2-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |