Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 30104.202-2013 English PDF

US$2014.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 30104.202-2013: Digital addressable lighting interface -- Part 202: Particular requirements for control gear -- Self-contained emergency lighting (device type 1)
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 30104.202-20132014 Add to Cart 7 days Digital addressable lighting interface -- Part 202: Particular requirements for control gear -- Self-contained emergency lighting (device type 1) Valid

Similar standards

GB/T 24825   GB/T 9473   GB/T 32483.2   GB/T 30104.201   GB/T 30104.204   GB/T 30104.205   

Basic data

Standard ID: GB/T 30104.202-2013 (GB/T30104.202-2013)
Description (Translated English): Digital addressable lighting interface -- Part 202: Particular requirements for control gear -- Self-contained emergency lighting (device type 1)
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: K74
Classification of International Standard: 29.140.50; 29.140.99
Word Count Estimation: 101,167
Quoted Standard: GB/T 30104.101-2013; GB/T 30104.102-2013
Adopted Standard: IEC 62386-202-2009, IDT
Regulation (derived from): National Standards Bulletin No. 25 of 2013
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the relevant self-contained emergency lighting, the use of AC-DC power supply of the electronic control device digital signal control protocol and test procedures.

GB/T 30104.202-2013: Digital addressable lighting interface -- Part 202: Particular requirements for control gear -- Self-contained emergency lighting (device type 1)


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Digital addressable lighting interface Part 202. Particular requirements for control gear Self-contained emergency lighting (device type 1) ICS 29.140.50; 29.140.99 K74 National Standards of People's Republic of China Digital Addressable Lighting Interface Part 202. Particular requirements for control device Self-contained emergency lighting (device type 1) Part 202. Particularrequirementsforcontrolgear- Self-containedemergencylighting (devicetype1) (IEC 62386-202.2009, IDT) Issued on. 2013-12-17 2014-11-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅴ Introduction Ⅵ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 2 General requirements 5 Electrical Specifications 3 6 Interface Power 3 7 Transfer Protocol Structure 3 8 Timing 3 9 Operation 3 10 variable declaration 6 11 directive defines 7 12 test program 16 Appendix A (informative) Example 91 References 94 Figure 1 various photometric Level Definition Example 4 Figure 2 operating modes 5 Figure 3 Application Expansion Control/Configuration instruction sequence Example 9 Figure 4 "features" Test Process 17 FIG. 5 "Reset" Test Process 20 Figure 6 "100ms timeout" Test Process 22 Figure 7 "intermediate instruction" Test Process 24 Figure 8 "fixed storage" Test Process 26 Figure 9 "on and off" the testing process 29 10 "gradual shutdown" test process 30 11 "Physical Address Assignment" Test Process 31 12 "Query lamp power" Test Process 33 13 "rest" Test Process 34 14 "inhibit" the testing process 36 15 "Start/Stop function test" Test Process 37 16 "functional test failed" the test process 38 17 "function test request pending" test process 40 18 "start/stop duration of the test" Testing Process 41 19 "Duration Test Failure" Test Process 42 20 "Duration test request pending" Test Process 44 21 "parallel testing" Test Process 46 22 "lamp timer" 47 testing process 23 "Stop Pending Test" Test Process 48 Figure 24 "is stored in the DTR emergency class" Test Process 49 25 "Emergency Level vs. Min/Max" Test Process 51 Figure 26 "is stored in the test timed" Test Process 53 Figure 27 "automatic test" Test Process 55 Figure 28 "is stored in test execution time-out" testing process 57 29 "into the extension of time," the testing process 59 Figure 30 "Start identification" test process 60 31 "Interface fault" Test Process 61 32 "Query battery recharge" 62 Test Process 33 "type queries wiring inhibition" test process 63 34 "Query wiring type switching power supply" Test Process 64 35 "Query physics select" Test Process 65 Figure 36 "rest. The extended instruction sequence" Test Process 67 37 "suppression and Testing. Application extended instruction sequence" Test Process 69 38 "reset functions completion flag. The extended instruction sequence" Test Process 71 39 "Reset duration of the test completion flag. The extended instruction sequence" Test Process 73 Figure 40 "Configuration. Other directive to enable the device type 1 after" testing process 75 Figure 41 "Configuration. 100ms interval" Test Process 77 Figure 42 "Configuration. intermediate instruction" Test Process 79 Figure 43 "Query. enable another instruction device type 1 after" testing process 80 44 "Starting Identification. The extended instruction flow" testing process 82 45 "Extended reset" Test Process 84 46 "extended fixed storage" Test Process 86 Figure 47 "restore factory settings" Test Process 88 Figure 48 "DTR reserved Select the value" Test Process 89 Figure 49 "Discover the extension version number" Test Process 90 Figure A.1 duration of the test process instance 91 Figure A.2 functional testing and test duration timer program 92 Table 1 Additional variable declaration 6 Table 2 extended instruction set list of 15 settings Table 3 Type the emergency control device 16 Table 4 "Configuration Instructions" testing process list 18 Table 5 Parameter "Reset" testing process 19 Parameters Table 6 "100ms timeout" Test Process 21 Parameters Table 7 "intermediate instruction" Test Process 23 Parameters Table 8 "fixed storage" Test Process 25 Table 9 "arc power control command" Test Process List 27 Parameters Table 10 "on and off" test process 28 Table 11 Parameters "fade off 'testing process 29 Table 12 "inquiry and reservation instructions" testing process list 32 Table 13 "inhibit" the testing process parameter 35 Table 14 "functional test failed" testing process parameters 38 Table 15 "function test request pending" testing process parameters 39 Parameters Table 16 "duration test request pending" testing process 43 Table 17 "parallel testing" Test Process Parameters 45 Table 18 "is stored in the DTR emergency class" Testing Process Parameters 48 Table 19 "emergency class. Min/Max" Test Process Parameters 50 Table 20 "is stored in the test timed" Test Process Parameters 52 Table 21 "automatic test" Test Process Parameters 54 Table 22 "is stored in test execution time-out" testing process parameters 56 Table 23 "into the extension of time," the testing process parameters 58 Table 24 "repose. The extended instruction sequence" Testing Process Parameters 66 Table 25 "suppression and Testing. Application extended instruction sequence" Test Process Parameters 68 Table 26 "reset functions completion flag. The extended instruction sequence" Test Process Parameters 70 Table 27 "Resetting the duration of the test completion flag. The extended instruction sequence" Testing Process Parameters 72 Table 28 "Configuration. Enabling other command device type 1 after" testing process parameters 74 Table 29 "Configuration. 100ms interval" Testing Process Parameters 76 Table 30 "Configuration. intermediate instruction" Testing Process Parameters 78 Table 31 "Query. Enables device type other instruction after" testing process parameters 80 Table 32 "Starting Identification. The extended instruction sequence" Test Process Parameters 81 Table 33 "Extended reset" the testing process parameters 83 Table 34 "extended fixed storage" Testing Process Parameters 85 Table 35 "restore factory settings" Parameters 87 Test Process

Foreword

GB/T 30104 "Digital Addressable Lighting Interface" is divided into 13 parts. --- Part 101. General requirements for systems; --- Part 102. General requirements for the control device; --- Part 103. General requirements for control equipment; --- Part 201. control means special requirements for fluorescent lamps (device type 0); --- Part 202. Particular requirements for control self-contained emergency lighting (device type 1); --- Part 203. Particular requirements for control of discharge lamps (excluding fluorescent lamps) (device type 2); --- Part 204. control means special requirements for low-voltage halogen lamps (device type 3); --- Part 205. Particular requirements for control devices incandescent supply voltage controller (device type 4); --- Part 206. Particular requirements for digital signal control device into a DC voltage (device type 5); --- Part 207. control means special requirements of LED modules (device type 6); --- Part 208. control means special requirements for the switching function (device type 7); --- Part 209. control means special requirements for color control (device type 8); --- Part 210. control program means a special device requirements (device type 9). This section GB/T Part of 20,230,104. This section drafted in accordance with the rules of GB/T 1.1-2009 and GB/T 20000.2-2009 given. This section uses the translation method identical with IEC 62386-202.2009 "Digital addressable lighting interface - Part 202. control means Particular requirements for self-contained emergency lighting (device type 1). " This part is proposed by the China National Light Industry Council. This part of the National Electric lighting Standardization Technical Committee (SAC/TC224) centralized. Drafting this Part. Guangdong Product Quality Supervision and Inspection Institute, GUANGZHOU, Electrical Equipment Co., Guzhen Town, Zhongshan City Production Force Promotion Center, Foshan City, China Electrical Lighting Co., Ltd., Zhejiang glazing Lighting Co., Beijing Lighting Research Institute. The main drafters of this section. LI Zi-li, Wu Wenbin, Denggen Cheng, Yang Chi district, Kejian Feng, Zhao Xiurong, Jiang Shan, Duan Yan Fang.

Introduction

This section will be published simultaneously with the GB/T 30104.101 and GB/T 30104.102. The GB/T 30104 is divided into several parts published separately For future amendments and revisions. If necessary, add additional requirements. When referring to GB/T 30104.101 or GB/T within 30104.102 any provisions of this section and the composition of GB/T 30104.2 ×× Department Other parts of the column clearly defines the order in terms of scope and testing. If necessary, this section includes additional requirements. group To GB/T 30104.2 ×× all parts of the series are independent, and therefore does not contain references to each other. Requires that any provisions of GB/T 30104.101 or GB/T 30104.102 in this section to "in accordance with GB/T 30104.101 first 'N' chapter of the requirements, "a reference to the form of the sentence, the sentence could be interpreted as all requirements related to the provision of Section 101 or Section 102 are But it does not apply to Part 202 except the control device contains a particular type of lamp. Unless otherwise stated, figures in this section are used in the decimal. Hexadecimal numbers using 0xVV format, several of which VV value. Binary digits or using XXXXXXXXb XXXXXXXX format, wherein X is 0 or 1; "x" means "not in binary For consideration. " Digital Addressable Lighting Interface Part 202. Particular requirements for control device Self-contained emergency lighting (device type 1)

1 Scope

This section GB/T 30104 requirements with self-contained emergency lighting-related, AC/DC power supply of the electronic control unit Digital signal control protocol and test procedures. NOTE. The standard tests are type tests, the production process does not include a single control device test requirements.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 30104.101-2013 digital addressable lighting interface - Part 101. General requirements for systems (IEC 62386-101. 2009, IDT) GB/T 30104.102-2013 digital addressable lighting interface - Part 102. General requirements for control devices (IEC 62386-102. 2009, IDT)

3 Terms and Definitions

GB/T 30104.101-2013 Chapters 3 GB/T 30104.102-2013 defined in Chapter 3 and the following terms and definitions apply This file. 3.1 Normal mode (self-contained emergency control device) normalmode (forself-containedemergencycontrolgear) Power supply is normal, while the battery is being charged or charging mode. 3.2 Emergency mode (self-contained emergency control device) emergencymode (forself-containedemergencycontrolgear) Power supply failure, and during which the control device powered by a battery deep discharge the battery until the point mode. 3.3 Sleep mode (self-contained emergency control device) restmode (forself-containedemergencycontrolgear) Interested lights off, during which the control device consists of a battery-powered model. 3.4 Suppression mode (self-contained emergency control device) inhibitmode (forself-containedemergencycontrolgear) Its normal mode control device powered by a power, but when the power failure is prevented from entering the emergency mode. 3.5 Extended emergency mode (self-contained emergency control device) extendedemergencymode (forself-containedemergency controlgear) After power is restored to its normal mode, the control device in accordance with the emergency mode duration set to continue in the same way that the lamp jobs.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 30104.202-2013_English be delivered?

Answer: Upon your order, we will start to translate GB/T 30104.202-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 30104.202-2013_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 30104.202-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.