Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 29487-2013 English PDF

US$509.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 29487-2013: Medium/high-power mine gas generating set
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 29487-2013509 Add to Cart 4 days Medium/high-power mine gas generating set Valid

Similar standards

GB/T 14478   GB/T 15468   JB/T 6688   GB/T 44300   GB/T 41148   GB/T 29488   

Basic data

Standard ID: GB/T 29487-2013 (GB/T29487-2013)
Description (Translated English): Medium/high-power mine gas generating set
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: K59
Classification of International Standard: 29.160.40
Word Count Estimation: 22,291
Quoted Standard: GB 146.1; GB 146.2; GB/T 191; GB/T 2820.1; GB/T 2820.3; GB/T 2820.5; GB/T 2820.9; GB/T 2820.10; GB 3836.1; GB 4556; GB/T 6072.1; GB 7231-2003; GB/T 8190.1; GB/T 8190.4; GB/T 13306; GB/T 20136-2006; GB 20651.1; GB/T 21428-2008; GB/T 22343-2008
Regulation (derived from): National Standards Bulletin 2013 No. 2
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the requirements for high-power gas turbines, testing, inspection rules, marking and packaging and storage requirements. This standard applies to the rated power of not less than 250 kw, a frequency of 50 (or 60) Hz, with coal gas

GB/T 29487-2013: Medium/high-power mine gas generating set

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Medium/high-power mine gas generating set ICS 29.160.40 K59 National Standards of People's Republic of China High-power gas turbines Issued on. 2013-02-07 2013-07-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 requires 2 4.1 Gas Requirements 2 4.2 Monitoring Equipment 2 4.3 Standard reference conditions 3 4.4 kW load types and operating mode 3 4.5 predetermined output power condition 4 4.6 start-up requirements 4 4.7 Performance Level 4 5 4.8 Electrical Performance 4.9 Structure 6 Polluted the limits 4.10 Economy 7 4.11 4.12 Security 7 4.13 protective measures 9 4.14 monitoring unit 10 4.15 appearance quality 10 10 4.16 Complete Set 5 Test 10 5.1 Instruments 10 5.2 Test Item 10 5.3 Test requirements 11 5.4 Test Method 12 15 6 Inspection Rules 6.1 Inspection classification 15 6.2 determine the rules 16 7 signs, packaging and storage 16 7.1 marks 16 7.2 Packaging 17 7.3 Storage 17 References 18

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. The standard proposed by China Electrical Equipment Industrial Association. This standard by the national gas reciprocating internal combustion power generation equipment Standardization Technical Committee (SAC/TC372) centralized. This standard by the Chinese CNPC Jinan Diesel Power Plant is responsible for drafting. Zhejiang Yiwu Power Equipment Co., Ltd., Jiang Su Shengyuan gas power Machinery Co., Ltd., Zibo Zi Chai New Energy Co., Ltd., Zhengzhou Jinyang Electric Co., Ltd. participated in the drafting. Drafters of this standard. Qu Yuling, Plum, Nixiu Yong, Wang Anzhong, Wang Ling Jin, Tang Honghui, early season Xiao SOCIETY OF Shiqing Chen, Liu Gencheng, Zhang Hongbin, Chen Junmin, Zhang Shijuan. High-power gas turbines

1 Scope

This standard specifies the high-power gas turbines (hereinafter referred to as "units") requirements, testing, inspection rules, logo and packaging and storage Transportation requirements. This standard applies to the rated power of not less than 250kW, frequency of 50 (or 60) Hz, coal mine gas as main fuel reciprocating internal Combustion engine driven alternator group.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB 146.1 standard gauge railway rolling stock clearance GB 146.2 standard gauge railway locomotive construction clearance GB/T 191 Packaging - Pictorial signs GB/T 2820.1 reciprocating internal combustion engine driven alternating current generating sets - Part 1. Application, ratings and performance GB/T 2820.3 reciprocating internal combustion engine driven alternating current generating sets - Part 3. Generator with alternator GB/T 2820.5 reciprocating internal combustion engine driven alternator group Part 5. Generator Part 9 GB/T 2820.9 reciprocating internal combustion engine driven alternator group. Measurement and evaluation of mechanical vibrations GB/T 2820.10 Reciprocating internal combustion engine driven alternating current generating sets - Part 10. Measurement of noise (enveloping surface method) GB 3836.1 explosive atmospheres - Part 1. General requirements for equipment GB 4556 Reciprocating internal combustion engines fire GB/T 6072.1 reciprocating internal combustion engine performance - Part 1. Calibration and test methods of power, fuel and lubricating oil consumptions General Additional requirements for engines Basic identification colors GB 7231-2003 industrial piping, identifying symbols and safety identification GB/T 8190.1 Reciprocating internal combustion engines - Exhaust emission measurement - Part 1. Gas and particulate emissions test bed measurement (ISO 8178-1) GB/T 8190.4 Reciprocating internal combustion engines - Exhaust emission measurement - Part 4. steady-state test cycles for different engine applications (ISO 8178-4) GB/T 13306 signs GB/T 20136-2006 internal combustion engine power plant Common test methods GB 20651.1 Reciprocating internal combustion engines - Safety - Part 1. Compression ignition engines GB/T 21428-2008 Reciprocating internal combustion engine driven generating sets safety GB/T 22343-2008 Petroleum Industry natural gas combustion turbines

3 Terms and Definitions

GB/T 2820.1 and GB/T 2820.5 and define the following terms and definitions apply to this document.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 29487-2013_English be delivered?

Answer: Upon your order, we will start to translate GB/T 29487-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 29487-2013_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 29487-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.