GB/T 41148-2021 English PDFUS$349.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 41148-2021: General requirements for gas fuel generating sets Status: Valid
Basic dataStandard ID: GB/T 41148-2021 (GB/T41148-2021)Description (Translated English): General requirements for gas fuel generating sets Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K59 Word Count Estimation: 18,126 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 41148-2021: General requirements for gas fuel generating sets---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.General requirements for gas fuel generating sets ICS 29:160:40 CCSK59 National Standards of People's Republic of China General technical conditions for gas fuel generating sets Published on 2021-12-31 2022-07-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Technical requirements 1 4:1 General 1 4:2 Unit matching 2 4:3 Environmental conditions 2 4:4 Installation 3 4:5 Rated type and operation mode of output power 3 4:6 Startup Requirements 3 4:7 Air source requirements 3 4:8 Index limits 4 4:9 Temperature rise 6 4:10 Protection device 6 4:11 Requirements for the heat consumption rate (or air consumption) of the unit 6 4:12 Structure 7 4:13 Limits for environmental pollution7 4:14 Tightness 9 4:15 Security 9 4:16 Reliability and maintainability 11 4:17 Completeness 11 4:18 Unit marking 11 5 Inspection items, inspection rules and inspection methods 12 5:1 General 12 5:2 Inspection classification 12 5:3 Inspection sequence 12 5:4 Inspection conditions 12 5:5 Identification test 12 5:6 Type inspection 13 5:7 Factory inspection 13 5:8 Acceptance inspection 15 5:9 Inspection methods 15 6 Packaging and storage 15 forewordThis document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" drafted: Please note that some content of this document may be patented: The issuing agency of this document assumes no responsibility for identifying patents: This document is proposed by China Electrical Equipment Industry Association: This document is under the jurisdiction of the National Standardization Technical Committee for Reciprocating Internal Combustion Gas Power Generation Equipment (SAC/TC372): This document is drafted by: Lanzhou Power Vehicle Research Institute Co:, Ltd:, China National Petroleum Corporation Jichai Power Co:, Ltd:, Shenzhen Dongkang Electric Power Co:, Ltd: Power Equipment Co:, Ltd:, Jiangxi Tsinghua Tellhow Sanbo Motor Co:, Ltd:, Changzhou Changfa Agricultural Equipment Engineering Technology Research Co:, Ltd:, Shenzhen Worbenda New Energy Co:, Ltd:, Shanghai Dingxin Electric (Group) Co:, Ltd:, Air Force Early Warning Academy Radar Non-commissioned Officer School, Shandong Saiwa Special Power Equipment Co:, Ltd:, Shanghai Cooltech Power Co:, Ltd:, Fujian Yongqiangjia Power Equipment Co:, Ltd:, Zhengzhou Foguang Power Generation Equipment Co:, Ltd: Equipment Co:, Ltd: The main drafters of this document: Li Xueming, Guo Jinju, Chen Hongbin, Deng Yanping, Zheng Herui, Lu Gang, Wang Yong, Zhang Yourong, Zhong Shenghua, Xu Naiqiang, Zhuo Ruixing, Guo Haiqin, Xue Chen: General technical conditions for gas fuel generating sets1 ScopeThis document specifies the technical requirements, inspection items, inspection rules and inspection methods for gas fuel generating units (hereinafter referred to as "units"): Packaging and storage requirements: This document is applicable to machines with rated voltage of 15kV and below, rated frequency of 50Hz, and fueled by natural gas, biogas, gas and other gases: Group: Units using other gas fuels, voltage levels and frequencies can refer to this document:2 Normative referencesThe contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document: GB/T 311:1-2012 Insulation coordination - Part 1: Definitions, principles and rules GB/T 311:2-2013 Insulation Coordination Part 2: Guidelines for Use GB/T 2820:1-2009 Reciprocating internal combustion engine-driven alternator sets - Part 1: Use, rating and performance GB/T 2820:2 Reciprocating Internal Combustion Engine Driven Alternator Sets Part 2: Engines GB/T 2820:3 Reciprocating Internal Combustion Engine Driven Alternator Sets Part 3: Alternators for Generator Sets GB/T 2820:4-2009 Reciprocating internal combustion engine-driven alternator sets - Part 4: Control devices and switching devices GB/T 2820:5-2009 AC generator sets driven by reciprocating internal combustion engines - Part 5: Generator sets GB/T 2820:6-2009 Reciprocating internal combustion engine-driven alternator sets - Part 6: Test methods GB/T 2820:9-2002 Reciprocating internal combustion engine-driven alternator sets - Part 9: Measurement and evaluation of mechanical vibration GB/T 2820:10 Reciprocating internal combustion engine-driven alternator sets - Part 10: Measurement of noise (cladding method) GB/T 6072:1-2008 Performance of reciprocating internal combustion engines - Part 1: Calibration and testing of power, fuel consumption and oil consumption Additional requirements for method general purpose engines GB/T 13306 Signs GB/T 20136-2006 General test method for internal combustion engine power station GB/T 37089 Reciprocating internal combustion engine driven alternator set controller JB/T 8194 terminology of internal combustion engine power station JB/T 9583:2 Gas fuel generator set-Part 2: Rated power, voltage and speed3 Terms and DefinitionsGB/T 2820:1-2009, GB/T 2820:2, GB/T 2820:3, GB/T 2820:4-2009, GB/T 2820:5-2009, GB/T 2820:6-2009, GB/T 2820:9-2002, GB/T 6072:1-2008, GB/T 20136-2006 and JB/T 8194 The defined terms and definitions apply to this document:4 Technical requirements4:1 General 4:1:1 The unit shall comply with the provisions of this document: The supporting parts of the unit, which are not specified in this document, shall meet the requirements of their respective technical conditions: ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 41148-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 41148-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 41148-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 41148-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |