Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 25343.4-2010 English PDF

US$279.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 25343.4-2010: Railway applications -- Welding of railway vehicles and components -- Part 4: Production requirements [including MODIFICATION 1]
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 25343.4-2010279 Add to Cart 3 days Railway applications -- Welding of railway vehicles and components -- Part 4: Production requirements [including MODIFICATION 1] Valid

Similar standards

TB/T 3139   GB/T 37423   GB/T 5599   GB/T 25343.3   GB/T 25343.5   GB/T 25343.2   

Basic data

Standard ID: GB/T 25343.4-2010 (GB/T25343.4-2010)
Description (Translated English): Railway applications -- Welding of railway vehicles and components -- Part 4: Production requirements [including MODIFICATION 1]
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: S30
Classification of International Standard: 45.060.01
Word Count Estimation: 12,134
Date of Issue: 2010-11-10
Date of Implementation: 2011-03-01
Quoted Standard: GB/T 5185-2005; GB/T 15169; GB/T 19867.1; GB/T 19867.2; GB/T 19867.3; GB/T 19867.4; GB/T 19867.5; GB/T 19868.1; GB/T 19868.2; GB/T 19868.3; GB/T 19868.4; GB/T 25343.1-2010; GB/T 25343.3-2010; ISO 9013-2002; ISO 9606-2; ISO 9606-3; ISO 9606-4; ISO 9606-5; ISO 14555; ISO 15614-1; ISO 15614-2; ISO 15614-3; ISO 15614-4; ISO 15614-5; ISO 15614-6; ISO 15614-7; ISO 15614-8; ISO 15614-10; ISO 15614-11; ISO 15614-12; ISO 15614-13; ISO 15620; ISO 17652-1; ISO 17652-2; ISO/TR 15608-2005; EN 1011-2; EN 1011-3; EN 1011-4; EN 1011-5; EN 1011-6; EN 1011-7; EN 1011-8
Adopted Standard: EN 15085-4-2007, MOD
Regulation (derived from): National Standard Approval Announcement 2010 No.8 (Total No.163)
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the welding production requirements (eg: preparation and implementation requirements). This section applies to welded rail vehicles and their spare parts manufacturing and repair processes in metallic materials.

GB/T 25343.4-2010: Railway applications -- Welding of railway vehicles and components -- Part 4: Production requirements [including MODIFICATION 1]


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Railway applications Welding of railway vehicles and components Part 4. Production requirements ICS 45.060.01 S30 National Standards of People's Republic of China Railway applications - welding rail vehicles and their components Part 4. Production requirements Part 4. Productionrequirements Issued on. 2010-11-10 2011-03-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

GB/T 25343 "Railway applications - welding rail vehicles and their components" is divided into five parts. --- Part 1. General; --- Part 2. Welding manufacturer's quality requirements and certification; --- Part 3. Design requirements; --- Part 4. Production requirements; --- Part 5. Inspection, testing and documentation. This section GB /Part 4 T 25343, which corresponds to EN15085-4.2007 "Railway applications rail vehicles and their components Welding - Part 4. production requirements. " The partial modification using EN15085-4.2007, the main changes are as follows. --- Remove the EN15085-4.2007's "Preface" and "Introduction"; --- To EN15085-4. International Standard (ISO ) in 2007 and the European standard references (EN), if the country has a corresponding standard, a Law cited corresponding national standards or industry standards; --- The EN15085-4. 5.2.2 2007 in the "when the workpiece temperature is below 5 ℃, under no circumstances should be preheated" is replaced by. "When the workpiece temperature is below 5 ℃, under normal circumstances need to warm up."; --- On "Compliance 5.3.2 welding material" requirements, EN15085-4.2007 requires that all welding materials should be adopted EN13479 standard certification, and obtained the certificate issued by the certification body. In this section modify the terms as follows. "All welding Bonding material shall conform to the requirements of the relevant standards and technical documents. Compliance welding material may be proved by a certificate of material. The range of valid certificates should contain the welding process has been developed, materials, welding position and welding current types of content. If the user Requirements, can be proved by a certificate issued by an authorized institution... " This section proposed by the People's Republic of China Ministry of Railways. This section from south Qishuyan Locomotive Rolling Stock Technology Research Institute Co., Ltd. under the jurisdiction. This section is drafted. CSR Qishuyan Locomotive Co., Ltd., CSR Qishuyan Locomotive & Rolling Stock Technology Research Institute Co., Ltd., CSR Yangtze River Vehicles Co., Ltd., CSR Zhuzhou Electric Locomotive Co., Ltd., CNR Changchun Railway Vehicles Co., Ltd., CSR Sifang Locomotive and Rolling Stock Shares Limited. The main drafters of this section. Fangrong Liang, Li Yusheng, Jiang Tian Fang, LI Jia Liang, Mao Junming, Hu Liguo, Zhang Haicang. Railway applications - welding rail vehicles and their components Part 4. Production requirements

1 Scope

GB/T 25343 provisions of this part of the welding production requirements (for example. the preparation and implementation requirements). This section applies to weld rail vehicles and parts manufacturing and maintenance process of metallic materials.

2 Normative references

The following documents contain provisions which, through reference GB/T 25343 in this section constitute provisions of this section. For dated references, All subsequent amendments (excluding corrections) or revisions do not apply to this section, however, encourage an agreement under this section Parties to study the latest versions of these documents. For undated reference documents, the latest versions apply to this section. GB/T 5185-2005 Method Code welding and allied processes (ISO 4063.1998, IDT) GB/T 15169 steel welders - Fusion welding skills assessment (GB/T 15169-2003, ISO /DIS9606-1.2002, IDT) GB/T 19867 (all parts) welding procedure specification [ISO 15609 (all parts), IDT] GB/T 19868.1-based procedure qualification test welding materials (GB/T 19868.1-2005, ISO 15610.2003, IDT) GB/T 19868.2 welding procedure qualification based on experience (GB/T 19868.2-2005, ISO 15611.2003, IDT) GB/T 19868.3 standard welding procedure qualification based procedures (GB/T 19868.3-2005, ISO 15612.2004, IDT) GB/T 19868.4 pre-production welding procedure qualification test (GB/T 19868.4-2005, ISO 15613.2004, IDT) Welding - Part 1 GB/T 25343.1-2010 Railway applications rail vehicles and their components. General Part of GB/T 25343.3-2010 Railway applications rail vehicles and their components soldered 3. Design requirements ISO 9013.2002 Thermal cutting Thermal cutting classified Geometrical product specification and quality tolerances Approval testing of welders welding ISO 9606-2 Part 2. Aluminium and aluminum alloys Welding ISO 9606-3 Approval testing of welders - Part 3. Copper and copper alloys Approval testing of welders welding ISO 9606-4 Part 4. Nickel and nickel alloys Welding ISO 9606-5 Approval testing of welders - Part 5. Titanium and titanium alloys, zirconium and zirconium alloys ISO 14555 welding arc stud welding of metallic materials Specification and qualification of welding procedure tests ISO 15614 (all parts) of welding procedures for metallic materials Friction welding ISO 15620 welding of metallic materials ISO 17652-1 test - Part 1 to welding and allied processes shop primers. General requirements Test Part 2 ISO 17652-2 to welding and allied processes factory primer. primer factory welding characteristics ISO /T R15608.2005 welding of metallic materials Classification System Guide EN1011 (all parts) Welding - Recommendations for welding of metallic materials

3 Terms and Definitions

Terms and definitions GB/T 25343.1-2010 established applicable to this section.

4 welding preparation

4.1 Welding planning documents 4.1.1 Overview When a new creation, modification and maintenance of rail vehicles, the manufacturer prepare welding planning documents with the help of A-level welding personnel responsibilities recognized
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 25343.4-2010_English be delivered?

Answer: Upon your order, we will start to translate GB/T 25343.4-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 25343.4-2010_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 25343.4-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.