Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 25342-2010 English PDF

US$399.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 25342-2010: Vocabulary for railway track-laying machine and girder-erecting machine
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 25342-2010399 Add to Cart 3 days Vocabulary for railway track-laying machine and girder-erecting machine Valid

Similar standards

TB/T 3396.7   TB/T 1632.4   GB/T 10082   GB/T 25339   GB/T 25335   

Basic data

Standard ID: GB/T 25342-2010 (GB/T25342-2010)
Description (Translated English): Vocabulary for railway track-laying machine and girder-erecting machine
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: S19
Classification of International Standard: 45.120
Word Count Estimation: 17,119
Date of Issue: 2010-11-10
Date of Implementation: 2011-03-01
Regulation (derived from): National Standard Approval Announcement 2010 No.8 (Total No.163)
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the railway track laying machine, terms and definitions bridge machine. This standard applies to erect the T-rail and box beam, railway track laying or replace all kinds of arrangements and rail bridge machine and laying machine.

GB/T 25342-2010: Vocabulary for railway track-laying machine and girder-erecting machine

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Vocabulary for railway track-laying machine and girder-erecting machine ICS 45.120 S19 National Standards of People's Republic of China Railway track laying machines, erecting machine vocabulary Issued on. 2010-11-10 2011-03-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

This standard is carried out on the basis of the development of "railway track laying machines, Bridge machines term" of TB/T 1728-1991 on. This standard was drafted in accordance with GB/T 1.1-2000 given rules. The standard proposed by the People's Republic of China Ministry of Railways. This standard by China Railway Group Corporation centralized. This standard was drafted. China Railway Group Corporation, China Railway Heavy Industry Co., Ltd. Railway Tenth Group. The main drafters of this standard. Li Xiaogang, Li Ling, Rao drizzly, Cheng Feng, such as Liang Yi, Zhang Li, Fan Youhong, Liyan Gang. Railway track laying machines, erecting machine vocabulary

1 Scope

This standard specifies the terms and definitions railway track laying machines, bridge machines. This standard applies to T and erecting railway box girder, railway track laying or replacing row and rail bridge all kinds of machines and laying machine.

2 Basic terms and definitions

2.1 Laying machine track-layingmachine Railroad rail track rail and a long row of special sets of construction equipment. 2.2 Erecting machine girder-erectingmachine Erection of precast concrete railway bridge sets of special construction equipment. 2.3 Host mainworkingmachine Capable of running the railway line, and is capable of laying special job or bridge construction equipment. 2.3.1. Hosts With flat car flatwagonofthemainmachine For the installation of pillars, diesel engines and other parts of railway vehicles. 2.3.2 Host car part upperstructureofthemainmachine A host of other structures with flat car outside. 2.4 Auxiliary (motor-car) auxiliarymachine (motorizedflatwagon) Supporting the track panel stack, beams, along the railway line and to its own special equipment. 2.5 Auxiliaries flat car flatwagonoftheauxiliarymachine For mounting the beam drag car, Diesel and other parts of railway vehicles. 2.6 Main beam (machine arm) beam Laying, when the bridge operation to withstand the longitudinal girder rail row, bridge load by hanging. 2.7 Main beam (machine arm) Rocker mechanism swingingmechanismforthebeam Curve operation, make left and right main beam oscillating means. 2.8 Main beam (machine arm) lifting mechanism liftingandloweringmechanismforthebeam The arm is used to adjust the vertical height of the mechanical or hydraulic means. 2.9 Traveling traction mechanism runningmechanism Host drive, motor-car bodies on the line to go row.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 25342-2010_English be delivered?

Answer: Upon your order, we will start to translate GB/T 25342-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 25342-2010_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 25342-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.