GB/T 23110-2008 English PDFUS$674.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 23110-2008: Photometry for floodlights Status: Valid
Basic dataStandard ID: GB/T 23110-2008 (GB/T23110-2008)Description (Translated English): Photometry for floodlights Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K72 Classification of International Standard: 29.140.40 Word Count Estimation: 34,322 Date of Issue: 2008-12-30 Date of Implementation: 2009-09-01 Adopted Standard: CIE 43-1979, IDT Regulation (derived from): Announcement of Newly Approved National Standards No. 26 of 2008 (total 139) Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies recommended standard photometric test method which does not include the signal for the purpose of searchlights, road lighting, car headlights (some of which are processed by another document), does not include " imaging " optical devices, although a similar approach can already be these devices are used in good photometric measurements. This standard does not include peak and half peak intensity angle between the direction of less than 2 �� (ie 2X2 ��, or half-peak divergence angle of 4 �� symmetrical beam) lamps, they require special methods for photometric measurements. These measurements can be found in the literature for information, such as: a) J. M. Waldram, " searchlight photometric measurements ", Trans. Illuminating Engineering Society (London), 16, 187, 1951 b) " Searchlight seminar on " Illuminating Engineering Society (London) Publishing, 1948 c) "IES photometric testing guidelines on the searchlight, " lighting project, 53, 155, 1958 d) " national Bureau of Standards: searchlight photometric measurements ", NBS Technical Note 198, published in 1963-12-17 article photometric measurements are described in the light intensity values ??that can light intensity distribution curve, such as light intensity map or table for computer calculations to express. These intensity values ??are established at a distance by the inverse square law extrapolated illuminance measurement. See 4. 4. 2. GB/T 23110-2008: Photometry for floodlights---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Photometry for floodlights ICS 29.140.40 K72 National Standards of People's Republic of China GB/T 23110-2008/CIE43-1979 Floodlights photometry (CIE43-1979, IDT) Posted 2008-12-30 2009-09-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsIntroduction Ⅲ Introduction Ⅳ 1 Scope 1 2 Definitions 1 3 light-emitting light of acceptable accuracy test 5 Laboratory equipment 4 5 5 measurement conditions 8 6 9 Process 7 Expression of results 15 Measurement Appendix A (normative) and linear response of the photocell 19 Appendix B (normative) use photocell spectral response of color filter inspection method Stability 20 Annex C (normative) Floodlights for photometric test and its application coordinate system and a goniometer 21 Annex D (normative) binding recommended V-H coordinate system A and Type C goniometer 25 GB/T 23110-2008/CIE43-1979ForewordThis standard is equivalent to using CIE43-1979 "Floodlights photometric test." For ease of use, this standard made the following editorial changes. The term --- the "Technical Report" to "this standard"; --- Instead of using the decimal point as a decimal point ",". ","; --- Remove CIE43-1979 preface. The Standard Appendix A, Appendix B, Appendix C, Appendix D are normative appendix. The standard proposed by China National Light Industry Council. This standard by the National Standardization Technical Committee of electrical lighting (SAC/TC224) centralized. This standard was drafted. National Lighting Fitting Quality Supervision and Inspection Center, the National Electric Light Source Quality Supervision and Inspection Center (Shanghai), Shanghai era Lighting Appliance Co., Ltd. detection. The main drafters of this standard. Wang Ye, Shi Xiaohong, Zhang Fang steel. GB/T 23110-2008/CIE43-1979IntroductionThe main purpose of this standard is recommended adoption Floodlights testing methods so that it can provide acceptable photometric properties measured and reported. This standard is intended to provide the basis for a unified national standard, and test instruments for industrial select photometric laboratory, test operation and presentation Floodlights light Of performance data to provide guidance. This is not the official views of the CIE standard, this standard is recommended for any suggestion rather than mandatory. GB/T 23110-2008/CIE43-1979 Floodlights photometry1 Scope1.1 These recommendations are intended to cover the photometric test for indoor and outdoor lamps for light, and light cast light using incandescent or discharge lamps (Includes a tubular fluorescent lamps) or lamp with reflector. Similar methods can be used using a gas or oil lamps for light. These recommendations apply only to on Visual stable lighting fixtures does not apply to flash. 1.2 Recommended standard photometric test method does not include for the purpose of signaling searchlight road lights, car headlights (some of which are made Other document processing), not including the "image" of the optical apparatus, although a similar approach has been applied to the photometric well to these devices. 1.3 This standard does not include the angle between the light intensity peak and semi-peak direction by less than 2 ° (ie, 2 × 2 °, or half-peak divergence angle of 4 ° symmetrical beam Beam) lamps, they require special methods photometric measurements. These measurements information can be found in literature, for example. a) J. M. Waldram, "searchlight photometry", Trans. Illuminating Engineering Society (London), 16,187,1951 b) "searchlight on the seminar", the Illuminating Engineering Society (London) published in 1948 c) "IES photometric testing on Searchlight Guide", lighting, 53,155,1958 d) "National Bureau of Standards. Searchlight photometry", NBS Technical Note 198, published on 1963-12-17 1.4 This article describes the results of photometric light intensity value, light intensity distribution curve, and other light intensity graph or table suitable for computer calculations To express. The light intensity value is at a distance estimated by the inverse square law established illuminance measurements derived. See 4.4.2. In some cases, Other measurements photometric data may be more appropriate, such as flat lighting illuminance distribution from very close, like "wall washer" like lamps. This standard This measure does not involve, by a separate document to deal with.2 Definitions2.1,2.2,2.3 and 2.4 definitions for a single peak and the light intensity distribution angle increases continuously with decreasing case, more than one Special beam shape of the peak is still under consideration. 2.1 Contains all of the light intensity on the selected plane polar curves of the radius vector is greater than 50% of the peak beam angle range. 2.2 The maximum light intensity and the angle between the direction of the selected 50% of the maximum light intensity on the direction of the half-plane measured. Note. When the light intensity distribution is only one plane of symmetry or asymmetry, half-peak corners is particularly important. In the Cartesian rectangular coordinates shown in FIG. 1, the ab plane In the half-plane light intensity distribution on a half-peak corner of β1, in the upper half plane half peak b corners of β2, then half-peak divergence angle (β1 + β2). Test test distance and angle number 6.12 4.4.3 by smaller one half the peak corners β1 decision. Practical application, the spot lights half-peak corners can be expressed as follows. "This plane ab lamps on the corners for the half-peak + β1 and -β2". GB/T 23110-2008/CIE43-1979 ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 23110-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 23110-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 23110-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 23110-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |