| GB/T 21412.9-2009 English PDFUS$474.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 21412.9-2009: Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 9: Remotely operated tool (ROT) intervention systems Status: Valid 
 Basic dataStandard ID: GB/T 21412.9-2009 (GB/T21412.9-2009)Description (Translated English): Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 9: Remotely operated tool (ROT) intervention systems Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: E94 Classification of International Standard: 75.180.10 Word Count Estimation: 24,272 Date of Issue: 2009-04-08 Date of Implementation: 2009-11-01 Quoted Standard: GB/T 21412 Adopted Standard: ISO 13628-9-2000, IDT Regulation (derived from): National Standard Approval Announcement 2009 No.4 (Total No.144) Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the requirements and recommended practices for subsea production systems for the oil and gas industry ROT maintenance system and interface device functions. This section does not involve anyone in ROV operations and maintenance based systems (such as replacement of subsea pipeline connections and components), does not involve vertical wellhead maintenance, internal flowlines detection, oil tree people and their associated equipment. GB/T 21412.9-2009: Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 9: Remotely operated tool (ROT) intervention systems---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Petroleum and natural gas industries. Design and operation of subsea production systems. Part 9. Remotely operated tool (ROT) intervention systems ICS 75.180.10 E94 National Standards of People's Republic of China GB/T 21412.9-2009/ISO 13628-9.2000 Oil and Gas Industry Design and operation of subsea production systems Part 9. remotely operated tool (ROT) Maintenance System (ISO 13628-9.2000, IDT) Posted 2009-04-08 2009-11-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsIntroduction Ⅲ 1 Scope 1 2 terms, definitions and abbreviations 1 3 System Selection 2 4 functional requirements and recommended practices 7 5 test requirements and recommended practices 13 6 interface 14 References 17 GB/T 21412.9-2009/ISO 13628-9.2000ForewordGB/T 21412 "oil and gas industry of subsea production systems design and operation" is divided into nine sections. --- Part 1. General requirements and recommended practices; --- Part 2. Underwater and Marine use a flexible tube system; --- Part 3. Through flowline (TFL) systems; --- Part 4. subsea wellhead and Christmas tree equipment; --- Part 5. underwater umbilical; --- Part 6. Subsea production control systems; --- Part 7. Completion/Maintenance riser system; --- Part 8. subsea production systems underwater robot (ROV) interfaces; --- Part 9. remotely operated tool (ROT) Maintenance System. This section GB/T 21412 Part 9, corresponds to the ISO 13628-9.2000 "oil and gas industry of subsea production systems Design and operation - Part 9. remotely operated tool (ROT) Maintenance System "(in English). This section is equivalent to using ISO 13628-9.2000 "oil and gas industry of subsea production systems design and operation of Part 9. remote Manually operated tool (ROT) Maintenance System "(in English). This section is equivalent translation ISO 13628-9.2000. For ease of use, this section made the following editorial changes. --- "ISO 13628 this part" to "GB/T 21412 this part" or "this part"; --- Delete international standards foreword. This part is proposed by the China National Petroleum Corporation. This part of the National Oil and Gas Standardization Technical Committee centralized. This section drafted by. CNOOC (China) Co., Ltd. Research Center. The main drafters of this section. Mrs Zhao Ying, Huang Jun, SUN Zheng. GB/T 21412.9-2009/ISO 13628-9.2000 Oil and Gas Industry Design and operation of subsea production systems Part 9. remotely operated tool (ROT) Maintenance System1 ScopeGB/T 21412 in the provisions of this part of the oil and gas industry for underwater production systems ROT maintenance system and the interface device Functional requirements and recommended practices. This part was not involved in the operation and maintenance to ROV based system (such as subsea pipeline connections and component replacement), also It does not involve vertical wellhead maintenance, detect internal flowlines, oil into the trees and their associated equipment. 2 terms, definitions and abbreviations The following terms, definitions and abbreviations apply GB/T 21412 in this section. 2.1 Terms and Definitions 2.1.1 Underwater completed all maintenance work. 2.1.2 In schedule maintenance tasks to complete all the work within. 2.1.3 Special, unmanned underwater tools. These tools are used beyond the lifting capacity floating type ROV system capacity when the remote installation and set Parts replacement task. NOTE. ROT is a water control and support systems have cable tools for the completion of specialized underwater maintenance tasks. They are usually by the lifting cable or lifting ropes and Umbilical cable combination be retractable by the guide cable, a special thrust to achieve ROT or ROV traverse. 2.1.4 All ROT launching and recovery systems associated with the equipment. 2.1.5 The system is used to compensate for the ship's vertical motion of the ROT system retractable impact. 2.1.6 For storage, transportation, loading and testing framework to facilitate the movement ROT system modules and components as well as the replacement or installation. NOTE. skid systems are generally used in conjunction with a slide. 2.1.7 In the underwater installation of all piping, oil and gas pipelines, umbilical and cable. GB/T 21412.9-2009/ISO 13628-9.2000 ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 21412.9-2009_English be delivered?Answer: Upon your order, we will start to translate GB/T 21412.9-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 21412.9-2009_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 21412.9-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |