Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 21412.4-2013 English PDF

US$4394.00 · In stock
Delivery: <= 10 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 21412.4-2013: Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 4: Subsea wellhead and tree equipment
Status: Valid

GB/T 21412.4: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 21412.4-20134394 Add to Cart 10 days Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 4: Subsea wellhead and tree equipment Valid
GB/T 21412.4-2008RFQ ASK 10 days Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 4: Subsea wellhead and tree equipment Obsolete

Similar standards

GB/T 21447   SY/T 5164   SY/T 5324   GB/T 21412.2   GB/T 21412.11   GB/T 21412.10   

Basic data

Standard ID: GB/T 21412.4-2013 (GB/T21412.4-2013)
Description (Translated English): Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 4: Subsea wellhead and tree equipment
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: E92
Classification of International Standard: 75.180.10
Word Count Estimation: 220,297
Older Standard (superseded by this standard): GB/T 21412.4-2008
Quoted Standard: ISO 8501-1; ISO 10423; ISO 10424-1; ISO 11960; ISO 13533; ISO 13625; ISO 13628-1; ISO 13628-3; ISO 13628-7; ISO 13628-8; ISO 13628-9; ISO 15156-1; ISO 15156-3; ANSI/ASME B16.11; ANSI/ASME B31.3; ANSI/ASME B31.4; ANSI/ASME B31.8; ANSI/ISA 75.02; ANSI/SAE J
Adopted Standard: ISO 13628-4-2010, IDT
Regulation (derived from): National Standards Bulletin 2013 No. 27
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the subsea wellhead equipment, mudline wellhead equipment, drill through the mud line wellhead and Christmas tree underwater vertical and horizontal specifications, and equipment handling, testing and related tools required for ins

GB/T 21412.4-2013: Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 4: Subsea wellhead and tree equipment


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Petroleum and natural gas industries Design and operation of subsea production systems Part 4... Subsea wellhead and tree equipment ICS 75.180.10 E92 National Standards of People's Republic of China Replacing GB/T 21412.4-2008 Oil and Gas Industry Design and operation of subsea production systems Part 4. underwater wellhead and tree equipment productionsystems-Part 4. Subseawelheadandtreeequipment (ISO 13628-4.2010, IDT) Issued on. 2013-12-31 2014-10-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Preface Ⅶ 1 Scope 1 2 Normative references 3 3 Terms, definitions, symbols and abbreviations 4 3.1 Terms and definitions 4 3.2 Symbols and Abbreviations 9 4 Use conditions and product specification level 11 11 4.1 Conditions of Use 4.2 specification level 11 5 General System Requirements 12 5.1 Design and performance requirements 12 5.2 Materials 22 5.3 Welding 22 5.4 Quality Control 23 26 5.5 Equipment logo 5.6 Storage and shipping 27 6 overall design of subsea production tree and tubing hanger of claim 28 6.1 General 28 Christmas Tree Manifolds 29 6.2 6.3 subsea tree assembly test 37 6.4 mark 37 6.5 Storage and shipping 41 7 specific requirements --- subsea trees and related equipment and sub-assembly 41 7.1 Flanged end and outlet connections 41 7.2 ISO hub connecting clamp 54 7.3 Threaded connections 54 7.4 other end of the connection means 55 7.5 studs, nuts and bolts 55 7.6 gasket ring 55 7.7 Completion guide base 56 7.8 Christmas tree and tubing head connecting means 57 7.9 Vertical Christmas tree on the buckle or seal fitting 60 7.10 valves, manifolds, and drives 61 7.11 TFLY shaped short section 71 and diverter Reentry interface 72 7.12 7.13 subsea tree cap 73 7.14 Christmas tree cap running tool 76 7.15 Christmas tree guide frame 78 7.16 Christmas tree running tool 81 7.17 Christmas tree line 84 7.18 oil pipeline system connecting means 85 7.19 auxiliary equipment running tool 88 Hydraulic or electric or optical 7.20 Christmas tree installed in the control connection 89 7.21 Underwater throttle and drive 92 Other equipment 101 7.22 8 --- the specific requirements of the subsea wellhead apparatus 105 8.1 General 105 8.2 temporary guide base 105 8.3 106 permanent guide base 8.4 catheter tip 110 8.5 wellhead 112 8.6 casing hanger 114 8.7 annulus sealing assembly 116 8.8 casing hanger lock bushing 117 8.9 aperture and wear protection liner 118 8.10 corrosion cap 120 8.11 fed, the recovery and test tool 120 8.12 trawl protective structure 120 Inclination and orientation of wellhead 120 8.13 8.14 underwater mud line casing hanger and seal assembly 121 9 specific requirements --- underwater tubing hanger system 121 9.1 General 121 9.2 Design 121 9.3 Materials 124 9.4 Test 124 10 specific requirements --- mud line suspension device 124 10.1 General 124 10.2 take place or mud line suspension lift ring 128 10.3 casing hanger 128 10.4 casing hanger running tool joints and back 130 130 10.5 capping abandoned wells 10.6 Completion underwater mud line conversion apparatus 130 10.7 tubing hanger and completion systems --- underwater mud line conversion apparatus 131 11 specific requirements --- drilling through the mud line suspension device 131 11.1 General 131 11.2 External drilled through the casing hanger (mixed casing hanger outside of the housing) 132 11.3 mixing casing hanger housing 132 11.4 Internal drilled through the mud line casing hanger 133 11.5 annulus sealing assembly 135 11.6-hole protection devices and wear bushing 136 11.7 tubing hanger and completion systems --- underwater drilling equipment through the mud line 137 137 11.8 capping abandoned wells 11.9 fed, the recovery and test tools 137 Appendix A (informative) vertical underwater Christmas tree 138 Annex B (informative) 142 underwater horizontal christmas tree Annex C (informative) underwater wellhead 145 Annex D (informative) underwater tubing hanger 147 Appendix E (normative) mud line suspension and conversion system 150 Annex F (informative) drilling through the mud line suspension system 157 Appendix G (Informative Appendix) ISO (API) bolt flanged assembly guide 159 Appendix H (informative) underwater wellhead into the recovery and test tools designed and tested to 167 Annex I (informative) coating system application 169 Screening Annex J (informative) material compatibility 172 Annex K (informative) to enhance the design and testing of the lug plate 176 Annex L (informative) High Pressure Test Guideline 188 Annex M (informative) 190 Buyer's Guide Appendix NA (informative) of this section and GB/T 21412.4-2008 major technological changes 206 References 210 1 double subsea wellhead apparatus Path Christmas Tree Example 31 Figure 2 tubing head vertical Christmas Tree Example 32 Figure 3 Example 33 horizontal christmas tree Example 4 through 34 holes 5 Christmas Tree chemical solvent injection valve sample downhole and SCSSV 36 Figure 6 17SS type whole or blind flange 49 Figure 7 BX-149 and BX-150 corrosion resistant ring groove alternately roughing and finishing detail 50 Figure 8 17SS type welding end and welding neck flange type 17SV preparation 50 9 Christmas tree guide frame 79 10 conventional throttle orifice structure 93 On the exterior of 11 subsea trees and wellhead load 108 12 permanent guide base load 109 13 typical catheter tip 111 Figure 14 Typical wellhead 112 Figure A.1 oriented vertical Christmas tree 139 Figure A.2 oriented TFL 140 Christmas tree Figure A.3 unguided Vertical Christmas tree 141 Figure B.1 oriented horizontal christmas tree 143 Figure B.2 unguided 144 horizontal christmas tree Figure C.1 subsea wellhead 146 Figure D.1 concentric tubing hanger 147 Figure D.2 porous tubing hanger 147 Figure D.3 horizontal christmas tree tubing hanger 148 Figure D.4 extended horizontal christmas tree tubing hanger 149 Figure E.1 mud line suspension (wellhead) and conversion device 151 Figure E.2 mud line conversion apparatus 152 Figure E.3 mud line suspension member axisymmetric cross-sectional Stress Distribution 154 Figure E.4 mud line suspension member 155 threshold stress Figure F.1 drilled through the mud line suspension system 158 Figure G.1 flange alignment tolerances of the flange 164 Figure G.2 a tool, tools, and two four tools on a cross-sectional bolt tightening torque sequence 165 Figure K.1 shackle plate and ear shapes and sizes (not to scale) 177 Figure K.2 underwater lifting lug plate size (not to scale) 179 Figure K.3 sling lifting device displays the vertical angle icon 182 Figure K.4 forging ear plate NDE area 186 Figure K.5 solder lug plate 186 local test Figure K.6 ear plate welding area 187 NDE Figure M.1 underwater equipment PSL tree 191 Table 1 Material requirements 12 Table 2 rated pressure value inside the threaded connection 15 Table 3 minimum design verification testing requirements 21 Table 4 illustrates the pressure test 38 Table 5 ISO (API) flanges rated working pressure and the size range of 41 Table 6 APISBX Pressure self-styled pad ring 43 Table 7 Rated working pressure 34.5MPa (5000psi) flange and bolts of 17SS basic dimensions 46 Table 9 rated working pressure 34.5MPa (5000psi) 17SS type of welding neck flange neck and pore size 48 Table 10 API corrosion resistant ring groove 49 initial processing Detailing Table 11 rated working pressure 34.5MPa (5000psi) of 17SV flange hub and pore size 51 Table 12 rated working pressure 34.5MPa (5000psi) 17SV flange of the rotating ring and bolts basic dimensions 52 Table 13 rated working pressure 69MPa (10000psi) of 17SV hub flange size 53 Table 14 rated working pressure 69.0MPa (10000psi) 17SV type of flange and bolts basic size 53 Table 15 wellhead systems --- standard size and type 57 Table 16 valve and actuator design and operating parameters 62 Table 17 parallel twin bore diameter from the center of the manifold 63 Table 18a PSL2 valve factory acceptance test file example 66 Table 18b PSL3 valve factory acceptance test file example 67 Table 18c PSL3G valve factory acceptance test file example 68 Table 19 hydraulic drive factory acceptance test file example 69 Flag Table 20 underwater valve 70 Table 21 underwater valve drive flag 70 Table 22 underwater valve 71 and the drive assembly logo Factory Table 23 hydraulically operated underwater throttle operation test acceptance test record Example 95 Table 24 mechanical operations and (or) with mechanical override operation test of the hydraulic operating underwater throttle factory acceptance test Record Example 95 Table 25 hydraulic drive factory acceptance test data represents Example 98 Table 26 Underwater throttle factory acceptance test data Table Example 100 Table 27 Underwater throttle data table flag 101 Table 28 Underwater throttle manually drive data table flag 102 Table 29 Underwater throttle hydraulic drive data table flag 102 Table 30 underwater throttle and drive assembly flag 103 Table 31 Test pressure 114 Table 32 casing hanger and wear bushing minimum vertical pore size 116 The minimum vertical hole 119 Table 33 hole protection devices Table 34 Maximum permissible pressure-induced stress 126 Table 35 Conversion mud line tubing head pressure test assembly --- 133 Table 36 casing hanger and wear bushing minimum vertical pore size 134 The minimum vertical hole 37 hole table protector 137 Table G.1 recommended flange bolt torque (API grease) 160 Table G.2 recommended flange bolt torque (API grease) 160 Table G.3 recommended flange bolt torque (PTFE filled based coating) 161 Table G.4 recommended flange bolt torque (PTFE filled based coating) 162 Table G.5 flange connection tighten record 166 Table K.1 ear plate manufacturing tolerances 178 Table K.2 permanently installed subsea equipment upgrade Dot Design 181 Marked. This part of the National Oil Drilling Equipment and Tools Standardization Technical Committee (SAC/TC96) and focal points. This section is responsible for drafting unit. Baoji Petroleum Machinery Co., Ltd. This section participated in the drafting unit. China National Offshore Oil Corporation, the oil industry well control equipment Quality Supervision and Inspection Center, the state oil and gas wells Port Equipment Quality Supervision and Inspection Center. The main drafters of this section. Fan Yamin, Wang Ting-ya, Liu Wei, Tang capital, Li Qingping, Cao Yan Feng, Geng Yanan, Zhang Xiang, the Sun Hongxiang, Zhang Yushu, Zhang Chuan. This part of the standard replaces the previous editions are. --- GB/T 21412.4-2008. Oil and Gas Industry Design and operation of subsea production systems Part 4. underwater wellhead and tree equipment

1 Scope

This section GB/T 21412 specifies the underwater wellhead, mud line wellhead equipment, drill through the mud line and underwater wellhead vertical and horizontal Specification-tree, as well as equipment handling, testing and related tools required for installation. Also it provides for an independent sub-assembly (used to build complete Subsea tree assembly) and a complete subsea tree assembly design, materials, welding, quality control (including factory acceptance test), marking, storage Store and transport. Users are responsible for ensuring the underwater equipment to meet any additional requirements to install their respective national government regulations. This is not the scope of this part within. When applicable, this section can also be applied to satellite wells, cluster wells and for a multilayer disc based completions and other aspects of the device. This section applies to the following devices. a) subsea tree --- Tree connector means and the tubing hanger; --- Valves, manifolds and valve actuators; --- Throttle valve and the throttle valve drive; --- Discharge valve, test and isolation valves; --- TFLY shaped Stone; --- Reentry interfaces; --- Christmas tree cap; --- Christmas tree line; --- Christmas tree guide frame; --- Christmas tree running tool; --- Christmas tree cap running tool; --- Christmas tree flowlines or umbilicals installation connecting means; --- Tubing head and tubing head attachment; --- Flowlines base and into the recovery tool; --- Control device interface Christmas tree installed (instruments, sensors, hydraulic tube or pipe fittings, electrical control equipment cables and accessories); b) underwater wellhead --- Catheter tip; --- Wellhead; --- Casing hanger; --- Seal assembly; --- Guide base; --- Holes and wear protection liner; --- Corrosion cap; c) mud line suspension system
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 21412.4-2013_English be delivered?

Answer: Upon your order, we will start to translate GB/T 21412.4-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 10 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 21412.4-2013_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 21412.4-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 21412.4-2013?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 21412.4-2013 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.