GB/T 18494.2-2022 English PDFUS$819.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 18494.2-2022: Convector transformers - Part 2: Transformers for HVDC applications Status: Valid GB/T 18494.2: Historical versions
Basic dataStandard ID: GB/T 18494.2-2022 (GB/T18494.2-2022)Description (Translated English): Convector transformers - Part 2: Transformers for HVDC applications Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K41 Word Count Estimation: 41,421 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 18494.2-2022: Convector transformers - Part 2: Transformers for HVDC applications---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Convetor transformers - Part 2.Transformers for HVDC applications ICS 29.180 CCSK41 National Standards of People's Republic of China Replacing GB/T 18494.2-2007 Converter transformer part 2. Converter transformer for HVDC transmission (IEC /IEEE60076-57-129.2017, Powertransformers- Published on 2022-03-09 2022-10-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 Symbol 2 5 General Requirements 3 6 Rating 4 7 Loss 4 8 Test requirements 6 9 Test methods 9 10 Insulation test of transformers that have been put into operation 16 11 Sound level 17 12 Casing 17 13 Tap changer 18 14 High Frequency Model 18 15 Deviation 18 16 Nameplate 19 17 Design Review 19 18 Technical Specifications 19 Appendix A (Informative) Overload of HVDC Converter Transformers Using Rectifier Valves (Mercury Arc Valves or Thyristors) During Operation 20 Appendix B (informative) Determine the transformer operation under non-sinusoidal commutation current according to the loss measurement value under the rated fundamental frequency current of the transformer Row Load Loss 23 Appendix C (Informative) Converter Transformer Noise 26 Appendix D (Informative) Design Review 28 Appendix E (Informative) Contents of Transformer Technical Specifications 30 Reference 33 Fig. 1 Voltage pattern of bipolar reversal test12 Figure A.1 Example of overload curve 21 Figure B.1 Cross section of winding wire 24 Table 1 Routine test, type test and special test 6 Table A.1 Overload Example 21 forewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. This document is part 2 of GB/T 18494 "Converter Transformers". GB/T 18494 has released the following parts. --- Part 1.Industrial converter transformers; --- Part 2.Converter transformers for HVDC transmission; --- Part 3.Application guidelines. This document replaces GB/T 18494.2-2007 "Converter Transformers Part 2.Converter Transformers for High Voltage Direct Current Transmission", and Compared with GB/T 18494.2-2007, in addition to structural adjustment and editorial changes, the main technical changes are as follows. --- Modified normative references (see Chapter 2, Chapter 2 of the.2007 edition); --- Added the terms and definitions of "valve side winding" and "grid side winding" (see Chapter 3); --- The conditions of use have been supplemented and improved (see Chapter 5, Chapter 4 of the.2007 edition); ---The number of harmonics in loss calculation is increased from 25 to 49 (see Chapter 7, Chapter 8 of the.2007 edition); --- The relevant content of the test has been supplemented and improved (see Chapter 8 and Chapter 9, Chapter 11 of the.2007 edition); --- The relevant requirements for sound level have been revised and improved (see Chapter 11, Chapter 10 of the.2007 edition); --- The relevant requirements for casing have been revised and improved (see Chapter 12, Chapter 14 of the.2007 edition); --- The relevant requirements of the tap changer have been revised and improved (see Chapter 13, Chapter 15 of the.2007 edition); --- Added provisions for the nameplate (see Chapter 16). This document uses the redrafting method to modify the use of IEC /IEEE60076-57-129.2017 "Power Transformers Part 57-129.High Converter Transformers for Voltage Direct Current Transmission. The following adjustments have been made in the text structure of this document. ---Adjusted 3.1 and 3.2 of the original IEC text to Chapter 3 and Chapter 4 of this document respectively, and retained the references in Chapter 3 of the original IEC text. introduction; --- Adjusted the article number and the serial number of the note in the original IEC text, and adjusted 8.2.2~8.2.4 to 8.2.1~8.2.3, 9.6.2~ 9.6.5 is adjusted to 9.6.1~9.6.4, 9.9~9.21 is adjusted to 9.8~9.20; Notes 1 and 2 in 9.13.2 are adjusted to 9.12.2 Note 2 and Note 3 in; --- Added Chapters 17 and 18 so that Appendix D and Appendix E are mentioned in the main text; --- Adjusted the order of the appendices in the original IEC text, and adjusted Appendix F to Appendix B, Appendix E to Appendix C, and Appendix C to adjust The whole is Appendix D, and Appendix D is adjusted to Appendix E; --- Deleted the content of IEC original C.2, and the corresponding chapter and article numbers are extended in turn. The technical differences between this document and IEC /IEEE60076-57-129.2017 and the reasons are as follows. ---IEC The original text is compatible with the contents of both the IEC standard and the IEEE standard. This document only adopts the contents of the IEC standard, and deletes all the contents of the IEC standard. The content of the IEEE standard in the paper is in line with the actual situation of our country; ---In Chapter 1, the provisions that this document does not apply to "Technical Specifications for Transformers for Flexible DC Transmission (see GB/T 37011)" are added, To be compatible with my country's standard system; --- Regarding normative reference documents, this document has made adjustments with technical differences to adapt to the technical conditions of our country and the circumstances of the adjustment. The situation is reflected in Chapter 2 "Normative References", and the specific adjustments are as follows. ● Replaced IEC 60076-1.2011 and GB/T 1094.2 generation with GB/T 1094.1-2013, which adopts international standard Instead of IEC 60076-2, GB/T 1094.3-2017 instead of IEC 60076-3.2013, GB/T 1094.5 instead IEC 60076-5, GB/T 1094.10 replace IEC 60076-10, GB/T 1094.18 replace IEC 60076-18, GB/T 4109 replaces IEC 60137, GB/T 7354 replaces IEC 60270, GB/T 10230.1 replaces the IEC 60214-1; ● Replacing IEC 60050-421 with non-equivalent GB/T 2900.95 adopting international standards; ● Added references to GB/T 1094.7 and JB/T 501; --- Deleted Chapter 4 "Use of Normative Reference Documents" in the original IEC text to conform to the actual situation in our country; --- Modified Table 1 of 8.1 by deleting "extended polarity reversal test", "repeated impulse waveform (RSO) measurement" and "starting Lifting and moving device test" to meet the actual situation in our country; --- Deleted the content of IEC original 8.2.1 to be compatible with my country's standard system; ---In 8.3.1, "It should be noted that the voltage transmitted to the valve side winding cannot exceed the specified operating shock level of the valve side winding", To improve the standard technical content; --- Deleted the content of IEC original 9.6.1 "DC withstand voltage test is not applicable to transformers for extended polarity reversal test" to comply with the actual situation in our country; ---Improved the content of paragraphs 1 and 2 of 9.6.4, and the test method cited GB/T 1094.3-2017 to meet the requirements of our the actual situation of the country; --- Deleted the paragraph 2 of IEC original 9.7.1 "The polarity reversal test does not apply to transformers for extended polarity reversal tests". to meet the actual situation of our country; --- The test time in 9.7.3 is adjusted from "30min" to "45min" to conform to the actual situation in my country; ---Improved the content of paragraphs 1 and 2 of 9.7.4, and the test method cited GB/T 1094.3-2017 to meet the requirements of our the actual situation of the country; --- Deleted the content of IEC original 9.8 "extended polarity reversal test" to conform to the actual situation of our country; ---In the test purpose of 9.12.1 (corresponding to IEC original 9.13.1), "determining the temperature rise of the surface of the fuel tank" has been added to conform to the actual situation of our country. Condition; ---In 9.15 and 9.16 (corresponding to 9.16 and 9.17 of the original IEC text), JB/T 501 is used instead of IEEEstdC57.12.90, and added Added "during the test, the oil temperature is generally 20℃±10℃" to conform to the actual situation in my country; --- Deleted "Once the number of operations is very high (30,000 times per year), online switching of the oil filter should be considered" in 13.2 to comply with my country's the actual situation; --- Deleted the content of Appendix B of the IEC original text to be compatible with my country's standard system; ---In the "system data" of E.2, the "current rate of change (dI/dt)" and "DC bias current" are added to conform to the actual situation in our country Condition. The following editorial changes have been made to this document. --- Modified the standard name; ---In 5.4, a reference to Appendix A was added; --- The names of some test items in Table 1 of 8.1 have been improved, and the repeated "impact test" and "AC test" have been deleted. "Test" two lines; ---In 9.12.2 (corresponding to 9.13.2 of the original IEC text), "Note 1.If required by the user, it is appropriate to determine the loss in the temperature rise of the top oil. Consider the effects of DC bias current and box-in"; --- Edited the formula (17) in 15.2; --- Added "DC bias current" to the column item of E.2; --- Adjusted the references, deleted documents not mentioned in the text, and added GB/T 37011. Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed by China Electrical Equipment Industry Association. This document is under the jurisdiction of the National Transformer Standardization Technical Committee (SAT/TC44). This document is drafted by. Shenyang Transformer Research Institute Co., Ltd., TBEA Shenyang Transformer Group Co., Ltd., TBEA Hengyang Transformer Co., Ltd., Shandong Electric Power Equipment Co., Ltd., China Southern Power Grid Research Institute Co., Ltd., Xi'an West Electric Transformer Co., Ltd. Limited Liability Company, China Electric Power Research Institute Co., Ltd., Baoding Tianwei Baobian Electric Co., Ltd., Chint Electric Co., Ltd., China Southern Power Grid Co., Ltd. EHV Transmission Company Maintenance Test Center, State Grid Jiangsu Electric Power Co., Ltd., Zhejiang Jiangshan Transformer Co., Ltd., State Grid Shaanxi Electric Power Company Electric Power Research Institute. The main drafters of this document. Zhang Xianzhong, Li Guiping, Zhang Zhongguo, Wang Xiangzhong, Tan Lijun, Tan Chong, Lei Yuanyuan, Shuai Yuanming, Fu Chao, Li Shicheng, Wang Qingpu, Li Jinbiao, Deng Jun, Wei Chao, Wang Tao, Wang Xinsheng, Jiang Zhenjun, Liu Xiaowei. The previous versions of the documents replaced by this document are as follows. ---First published in.2007 as GB/T 18494.2-2007; ---This is the first revision.IntroductionThe establishment of the standard for converter transformers is to establish a set of optimal evaluation criteria for Provide guidance on matters needing attention in selection, product design, product production, product inspection, product selection, and operation and maintenance. GB/T 18494 aims to establish compliance principles and relevant regulations applicable to the design, manufacture, test methods, operation and maintenance of converter transformers. Then, it is proposed to consist of 3 parts. --- Part 1.Industrial converter transformers. The purpose is to establish the technical requirements and tests applicable to various industrial converter transformers. inspection requirements. --- Part 2.Converter transformers for HVDC transmission. The purpose is to establish a converter transformer suitable for various types of HVDC transmission Technical requirements and test requirements of the device. --- Part 3.Application guidelines. The purpose is to give the technical background of Part 1 and Part 2, It provides a reference for the practical application of converters and various types of converter transformers for HVDC transmission. GB/T 18494 clarifies the technical requirements of various industrial converter transformers and converter transformers for HVDC transmission through three parts Summation test requirements are provided, and guidance is provided for the practical application of these two types of products. By establishing clear scope, terminology, technical requirements for various products Summation test methods, etc., allow producers, users and related test personnel to operate more clearly and accurately, so as to design and manufacture high quality products, better promote trade, exchanges and technical cooperation, and provide guarantees for the normal operation of my country's power grid. Converter transformer part 2. Converter transformer for HVDC transmission1 ScopeThis document specifies oil-immersed three-phase converter transformers and Technical requirements for single-phase converter transformers. This document applies to converter transformers with two, three or more windings. This document does not apply to. --- Industrial converter transformers (see GB/T 18494.1); --- Traction transformers (see GB/T 25120); --- Transformers for flexible DC transmission (see GB/T 37011).2 Normative referencesThe contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document. GB/T 1094.1-2013 Power Transformers Part 1.General (IEC 60076-1.2011, MOD) GB/T 1094.2 Power Transformers Part 2.Temperature Rise of Liquid Immersion Transformers (GB/T 1094.2-2013, IEC 60076-2. 2011, MOD) GB/T 1094.3-2017 Power Transformers Part 3.Insulation Level, Insulation Test and External Insulation Air Clearance (IEC 60076-3. 2013, MOD) GB/T 1094.5 Power Transformers Part 5.Ability to withstand short circuits (GB/T 1094.5-2008, IEC 60076-5. 2006, MOD) GB/T 1094.7 Power Transformers Part 7.Loading Guidelines for Oil-immersed Power Transformers (GB/T 1094.7-2008, IEC 60076-7.2005, MOD) GB/T 1094.10 Power Transformers Part 10.Determination of Sound Level (GB/T 1094.10-2003, IEC 60076-10.2001, MOD) GB/T 1094.18 Power Transformers Part 18.Frequency Response Measurement (GB/T 1094.18-2016, IEC 60076-18. 2012, MOD) GB/T 2900.95 Electrical Terms Transformers, Voltage Regulators and Reactors (GB/T 2900.95-2015, IEC 60050-421. 1990, NEQ) GB/T 4109 Insulating sleeves with AC voltage higher than 1000V (GB/T 4109-2008, IEC 60137Ed.6.0, MOD) GB/T 7354 High Voltage Test Technology Partial Discharge Measurement (GB/T 7354-2018, IEC 60270.2000, MOD) GB/T 10230.1 Tap-changer Part 1.Performance requirements and test methods (GB/T 10230.1-2019, IEC 60214-1. 2014, MOD) JB/T 501 Power Transformer Test Guide ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 18494.2-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 18494.2-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 18494.2-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 18494.2-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 18494.2-2022?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 18494.2-2022 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |