Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 15772-2008 English PDF

US$1039.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 15772-2008: Comprehensive control of soil and water conservation -- General rule of planning
Status: Valid

GB/T 15772: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 15772-20081039 Add to Cart 7 days Comprehensive control of soil and water conservation -- General rule of planning Valid
GB/T 15772-1995RFQ ASK 9 days General rule of planning for comprehensive control of soil erosion Obsolete

Similar standards

NY/T 1121.10   GB 20287   NY/T 1121.11   GB/T 37067   GB/T 15774   GB/T 15773   

Basic data

Standard ID: GB/T 15772-2008 (GB/T15772-2008)
Description (Translated English): Comprehensive control of soil and water conservation -- General rule of planning
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: B11
Classification of International Standard: 13.080
Word Count Estimation: 47,474
Date of Issue: 2008-11-14
Date of Implementation: 2009-02-01
Older Standard (superseded by this standard): GB/T 15772-1995
Quoted Standard: GB/T 15771-2005; GB/T 21010
Regulation (derived from): National Standard Approval Announcement 2008 No.18 (Total No.131)
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the task of preparing the Soil and Water Conservation Plan, basic requirements for achievement of finishing, contents, procedures, methods. This standard applies to the country, different area of soil and water conservation planning and other administrative jurisdiction, basin. Special plan for implementation.

GB/T 15772-2008: Comprehensive control of soil and water conservation -- General rule of planning

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Comprehensive control of soil and water conservation.General rule of planning ICS 13.080 B11 National Standards of People's Republic of China Replacing GB/T 15772-1995 General Soil and Water Conservation Plan Posted 2008-11-14 2009-02-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ Introduction Ⅳ 1 Scope 1 2 Normative references 1 3 1 General Provisions Task 3.1 Planning 1 3.2 Content and Program Planning 1 4 Soil Conservation Comprehensive Survey 2 4.1 Survey Objective 2 Preparation prior to the survey 2 4.2 4.3 survey content 2 4.4 The survey asked 2 4.5 Investigation Outcome 3 5 Water Conservation Zone 3 5.1 Partition Task 3 5.2 Principles of Regional Division 3 5.3 3 partition main content 5.4 partitioning method steps 4 5.5 zoning classification requirements 5 5.6 partition naming 5 5.7 Partition result 5 6 5 Land Use Assessment 6.1 Evaluation Objective 5 6.2 Evaluation Principles 5 5 6.3 Evaluation methods and procedures 6.4 Evaluation of the results of 6 7 Soil and Water Conservation Measures Plan 6 The overall layout of the comprehensive regulation measures 6 7.1 Comprehensive Management Measures 7.2 flat configuration 6 Implementation of integrated management measures of the order of 7.3 7 7.4 Planning of control measures 7 8 8 Technical and Economic Indices 8.1 8 input indicators calculated 8.2 Calculation Progress Indicator 9 8.3 Calculation efficiency indicators 9 9 9 Finishing planning results 9.1 Planning Report 9 9.2 Schedule 10 9.3 Figure 10 9.4 Annex 11 Content and Methodology Appendix A (informative) Soil Conservation Comprehensive survey of 12 Annex B (informative) Land Use evaluation method step 21 Annex C (informative) Calculation input and schedule requirements 26 Annex D (informative) Form 31 Schedule planning major Annex E (informative) Soil and Water Conservation Professional legend 41

Foreword

This standard replaces GB/T 15772-1995 "General soil and water conservation planning." This standard compared with GB/T 15772-1995, modified as follows. a) improve the planning system, and further clarify the affiliation of the scope of this standard and planning at all levels; b) the preparation of a standard 3.2.3 land use planning, land use change evaluation; c) the original standard catchment planning and preliminary design to small watershed, and remove the original standard entry catchment planning; d) increasing the environmental impact assessment of entry; e) the soil and water conservation division, to soil and water conservation district; f) the entry relating to engineering measures with reference to GB/T 16453-2008 "soil and water conservation technical specifications"; g) the technical and economic indicators calculated with reference to GB/T 15774-2008 "Soil and Water Conservation Benefit Calculation Method"; h) further defined the appendix soil erosion survey content, methodology and work base map scale. The Standard Appendix A, Appendix B, Appendix C, Appendix D and Appendix E are informative appendices. This standard was proposed by the Ministry of Water Resources. This standard by the Department of International Cooperation, Science and Technology. This standard was drafted. Division of Soil and Water Conservation, Soil and Water Conservation Monitoring Centre, on the middle reaches of the Yellow River Conservancy Commission Authority, yellow Rural water conservancy bureau River Water Resources Commission Water Conservation, Soil Conservation Service Changjiang Water Resources Commission, Songliao Water Resources Commission Water Conservancy Department, Pearl River water The Committee on Irrigation and Water Conservancy Department, the Haihe River Water Resources Commission Water Conservancy Department, the Huaihe River Water Resources Commission Water Conservancy Department, Beijing Forestry University soil and water conservation Hold college. The main drafters of this standard. Guo Ting Fu, Liu Wan Quan Zhou record with, Zhangfeng Zhou, Qi Dalai Di, Fan Qi Jing, Wangzhi Kai, cable Guo Yan, Lu Sheng force, Ning heap Tiger, Chang India, Zhao Yongjun, Chen Fayum, FORESTRY AND Cong Peijuan, often Dandong, Feng Wei, Li Qi. This standard replaces the standards previously issued as follows. --- GB/T 15772-1995.

Introduction

GB/T 15772-1995 has been implemented ten years on China's soil and water conservation planning has played an important role in guiding. With the change of social and economic development of rural industrial structure and content of soil and water conservation, nature, it is also undergone a profound change Of. In order to adapt to the soil and water conservation work under the new situation, to further standardize and water conservation planning, according to the Department of International Cooperation, Science and Technology, Water Soil conservation Division unified arrangement of GB/T 15772-1995 been revised. General Soil and Water Conservation Plan

1 Scope

This standard specifies the basic requirements for the preparation of soil and water conservation planning tasks, content, procedures, methods, outcomes of finishing. This standard applies to the national soil and water conservation planning, watershed, etc. under the jurisdiction of different administrative areas. Special plan for implementation.

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard. GB/T 15774-2008 Soil and Water Conservation Benefit Calculation Methods 21010 Status of Land Use GB/T category

3 General

Task 3.1 Planning 3.1.1 draw up plans should implement the "prevention first, overall planning, comprehensive prevention and control, according to local conditions, strengthening management, focusing on efficiency," the party and Water Conservation needle. The General Plan of governance based. 3.1.2 should be based on a comprehensive investigation, according to the local rural economic development, rationalizing land use and rural industrial structure, For the characteristics of soil erosion, the configuration of the local conditions and water conservation measures, technical requirements of the measures. 3.1.3 should analyze the measures required labor, material and financial resources in the planning period (small areas 3a ~ 5a, a large area 5a ~ 10a) arranged The progress of governance, forecasting benefits after the implementation of the plan, put forward measures to ensure the implementation of the plan. 3.2 Content and Program Planning 3.2.1 comprehensive survey from the following aspects. 3.2.1.1 Investigation of the basic situation in the planning area, including natural conditions, natural resources, socio-economic situation, especially soil erosion Point and so on. 3.2.1.2 Soil and Water Conservation survey summarizes achievements and experience. Including soil and water conservation process, governance status quo (the regulation measures Quantity, quality, and efficiency), soil and water conservation (technical measures experience and organizational leadership experience), the problems and improvements and the like. 3.2.2 Water Conservation zoning should be based on the natural conditions in different regions, socio-economic situation and the characteristics of soil erosion in the planning, division if Dry different types of areas, according to the different types of zones are proposed different land-use planning and control measures layout. 3.2.3 Evaluation should be based on land use planning within the current land use and land resources evaluation, consideration of population and the development of agricultural production The number of levels, the need to develop commodity economy and improve people's lives, the researchers evaluated each rural sector (agriculture, forestry, animal husbandry, and fisheries) and other land uses of The amount and location as the basis for the deployment of the soil and water conservation measures. 3.2.4 Prevention planning should be based on different land use and soil erosion different characteristics, different control measures were taken. 3.2.4.1 of woodland, grassland and other minor soil erosion but potentially dangerous loss (slope at 15 ° above) the place should be taken "to prevent Master "protective measures. 3.2.4.2 above for mild soil erosion farmland, wasteland, ravines and sand areas, should be taken separately corresponding control measures, control of water Soil erosion, and the use of land and water resources development of the rural economy. 3.2.4.3 Planning should include the following. a) propose different regions different types of preventive measures. b) in each type of area at least the preliminary design or implementation of a typical small watershed effect.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 15772-2008_English be delivered?

Answer: Upon your order, we will start to translate GB/T 15772-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 15772-2008_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 15772-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 15772-2008?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 15772-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.