Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 15579.6-2018 English PDF

US$584.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 15579.6-2018: Arc welding equipment -- Part 6: Limited duty equipment
Status: Valid

GB/T 15579.6: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 15579.6-2018584 Add to Cart 5 days Arc welding equipment -- Part 6: Limited duty equipment Valid
GB 15579.6-2008679 Add to Cart 3 days [GB/T 15579.6-2008] Arc welding equipment -- Part 6: Limited duty manual metal arc welding power sources Obsolete

Similar standards

GB/T 41861   GB/T 40337   GB/T 35091   GB/T 15579.1   GB/T 15579.7   GB/T 15579.5   

Basic data

Standard ID: GB/T 15579.6-2018 (GB/T15579.6-2018)
Description (Translated English): Arc welding equipment -- Part 6: Limited duty equipment
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: J64
Classification of International Standard: 25.160.30
Word Count Estimation: 31,328
Date of Issue: 2018-06-07
Date of Implementation: 2019-01-01
Older Standard (superseded by this standard): GB/T 15579.6-2008
Regulation (derived from): National Standard Announcement No. 9 of 2018
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 15579.6-2018: Arc welding equipment -- Part 6: Limited duty equipment

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Arc welding equipment--Part 6. Limited duty equipment ICS 25.160.30 J64 National Standards of People's Republic of China Replace GB/T 15579.6-2008 Arc welding equipment part 6. Load limiting device (IEC 60974-6.2010, IDT) Published on.2018-06-07 2019-01-01 implementation State market supervision and administration China National Standardization Administration issued

Content

Foreword III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 Environmental conditions 3 5 test 3 6 protection against electric shock 4 7 Thermal performance requirements 7 8 thermal control device 9 9 thermal protection 10 10 Unconventional operation 11 11 Power supply connection 11 12 output 13 13 Control circuit 16 14 anti-shock device 17 15 Mechanical requirements 17 16 auxiliary device 17 17 nameplate 18 18 output adjustment 21 19 User guide and logo 21 Appendix A (informative appendix) test tool 23 Appendix B (informative) Nameplate example 24 Appendix C (informative) Safety instructions label with only graphic symbols 25 Reference 26 Figure 1 Measurement of contact current under fault conditions 6 Figure 2 Weighted Contact Current Test Network 7 Figure 3 RMS measurement 14 Figure 4 Peak measurement 15 Figure 5 Nameplate Composition Principle 19 Figure A.1 Test piece 12 GB/T 16842-2008 Figure A.2 Test fixtures in GB/T 16842-2008 13 23 Figure B.1 Nameplate 24 Figure C.1 Safety instructions for manual metal arc welding power supplies driven by mechanical equipment 25 Table 1 Temperature limit by insulation class 9 Table 2 List of rated no-load voltages Table 3 Anti-electric shock device requirements for plasma cutting power supply 17

Foreword

GB/T 15579 "Arc Welding Equipment" is divided into 13 parts. --- Part 1. Welding power supply; --- Part 2. Liquid cooling system; --- Part 3. Arc ignition and arc stabilization devices; --- Part 4. Periodic inspection and testing; ---Part 5. Wire feeder; --- Part 6. Equipment that limits the load; --- Part 7. Welding torch (gun); --- Part 8. Gas path devices for welding and plasma cutting systems; ---Part 9. Installation and use; --- Part 10. Electromagnetic compatibility (EMC) requirements; ---Part 11. Welding tongs; ---Part 12. Welding cable coupling device; --- Part 13. Welding clamps. This part is the sixth part of GB/T 15579. This part is drafted in accordance with the rules given in GB/T 1.1-2009. This part replaces GB/T 15579.6-2008 "Arc welding equipment part 6. Manual metal arc welding power supply with limited load". The main technical changes in this section compared with GB/T 15579.6-2008 are as follows. --- Expanded the scope of application of the standard (see Chapter 1); --- Added additional requirements for plasma cutting systems (see 6.3.5); ---Modified the contact current under fault conditions (see 6.3.7); --- Eliminated the requirements of thermal cut-off devices and increased the requirements for thermal protection and thermal control devices (see Chapters 7, 8 and 9); --- Revised the thermal performance test method and assessment indicators (see Chapter 7); --- Increased overload test items in unconventional operations (see 10.4); --- Increased measurement method of input current (see 11.1.2); --- Revised the requirements for rated no-load voltage (see 12.1); --- Increase the agreed load voltage value for type inspection of welding power sources such as TIG welding (see 12.2); --- Increased requirements for protection against electric shock (see Chapter 14); ---Modified the requirements of the enclosure (see 15.2); --- Increased manual lifting device requirements (see 15.3); --- Increased requirements for auxiliary devices (see Chapter 16); ---Modified the nameplate requirements (see Chapter 17 and Appendix B); --- Added safety instructions and related markings (see 19.1.3, 19.2 and Appendix C). This section uses the translation method equivalent to IEC 60974-6.2010 "Arc Welding Equipment Part 6. Equipment for Limiting Loads". The documents of our country that have a consistent correspondence with the international documents referenced in this part are as follows. ---GB/T 4208-2017 Enclosure protection level (IP code) (IEC 60529..2013, IDT) ---GB/T 7899-2006 Cylinder pressure reducer for welding, cutting and similar processes (ISO 2503.1998, MOD) --- GB/T 15579.5-2013 Arc welding equipment - Part 5. Wire feeder (IEC 60974-5.2007, IDT) --- GB/T 15579.7-2013 Arc welding equipment - Part 7. Welding torch (gun) (IEC 60974-7.2005, IDT) --- GB/T 15579.10-2008 Arc welding equipment - Part 10. Electromagnetic compatibility (EMC) requirements (IEC 60974-10. 2007, IDT) --- GB/T 15579.11-2012 Arc welding equipment - Part 11. Welding tongs (IEC 60974-11.2010, MOD) This part was proposed by China Electrical Equipment Industry Association. This part is under the jurisdiction of the National Welding Machine Standardization Technical Committee (SAC/TC70). This section drafted by. Shanghai Hugong Welding Group Co., Ltd., Zhejiang Kende Electromechanical Co., Ltd., Shenzhen Huayilong Electric Co., Ltd., Guangzhou Yigao Electric Equipment Co., Ltd., Chengdu Sanfang Electric Co., Ltd. The main drafters of this section. Shu Zhenyu, Zhu Xuanhui, Wu Yuetao, Cheng Gang, Yang Yijun. The previous versions of the standards replaced by this section are. ---GB/T 15579.6-2008. Arc welding equipment part 6. Load limiting device

1 Scope

This part of GB/T 15579 specifies the limited load that is connected to a single-phase public low-voltage power supply system and designed for non-professionals. Arc welding and cutting power supplies and auxiliary devices, safety requirements for mechanically driven power supplies with an output power not exceeding 7.5 kVA and Performance requirements. Note 1. This equipment is usually used by non-professionals in residential areas. This section does not apply to the following arc welding and cutting power supplies. ---With arc ignition and arc stabilization device; ---With liquid cooling system; ---With pneumatic device; ---Three-phase input power; And power supplies for industrial and professional use only. This section does not apply to arc welding and cutting power supplies and auxiliary devices used in the following processes. --- Use mechanically oriented applications; ---Submerged arc welding; --- Plasma gouging; --- Plasma welding. The above situation is stipulated by other parts of GB/T 15579. Note 2. The requirements for power supply, wire feeder, welding torch and welding tongs for industrial and professional use are respectively shown in GB/T 15579.1-2013 and IEC 60974-5. IEC 60974-7 and IEC 60974-11. Note 3. This section does not include electromagnetic compatibility (EMC) requirements. See IEC 60974-10 for this requirement.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 15579.1-2013 Arc welding equipment - Part 1. Welding power supply (IEC 60974-1.2005, IDT) GB/T 16842-2008 Test kit for protection inspection of human and equipment (IEC 61032.1997, IDT) IEC 60529 enclosure protection rating (IP code) [Degreesofprotectionprovidedbyenclosures(IPCode)] IEC 60974-5 Arc welding equipment - Part 5. Wire feeders (Arcweldingequipment-Part 5. Wirefeeders) IEC 60974-7 arc welding equipment - Part 7. Torch (gun) (Arcweldingequipment-Part 7. Torches) IEC 60974-10 Arc welding equipment - Part 10. Electromagnetic compatibility (EMC) requirements [Arcweldingequipment-Part 10. Electromagneticcompatibility (EMC) requirements] IEC 60974-11 Arc welding equipment - Part 11. Welding nippers (Arcweldingequipment-Part 11. Electrodehold- Ers) ISO 2503 gas welding equipment with pressure and flow regulation for welding, cutting and similar processes up to 300 bar
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 15579.6-2018_English be delivered?

Answer: Upon your order, we will start to translate GB/T 15579.6-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 15579.6-2018_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 15579.6-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 15579.6-2018?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 15579.6-2018 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.