Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 15558.1-2023 PDF English

US$380.00 · In stock · Download in 9 seconds
GB/T 15558.1-2023: Buried polyethylene(PE) piping systems for the supply of gaseous fuels - Part 1: General
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB/T 15558.1: Historical versions

Standard IDUSDBUY PDFDeliveryStandard Title (Description)Status
GB/T 15558.1-2023380 Add to Cart Auto, 9 seconds. Buried polyethylene(PE) piping systems for the supply of gaseous fuels - Part 1: General Valid
GB/T 15558.1-20151359 Add to Cart 6 days Buried polyethylene (PE) piping systems for the supply of gaseous fuels -- Part 1: Pipes Obsolete
GB 15558.1-2015RFQ ASK 6 days [GB/T 15558.1-2015] Buried polyethylene (PE) piping systems for the supply of gaseous fuels -- Part 1: Pipes Obsolete
GB 15558.1-2003959 Add to Cart 5 days Buried polyethylene (PE) piping systems for the supply of gaseous fuels -- Part 1: Pipes Obsolete
GB 15558.1-1995559 Add to Cart 4 days Buried polyethylene (PE) pipes for the supply of gaseous fuels Obsolete
GB/T 15558.1-1995RFQ ASK 3 days Buried polyethylene (PE) pipes for the supply of gaseous fuels Obsolete

Similar standards

GB/T 19472.1   GB/T 15560   GB/T 15267   GB/T 15558.4   

GB/T 15558.1-2023: Buried polyethylene(PE) piping systems for the supply of gaseous fuels - Part 1: General


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT15558.1-2023
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 83.140.30 CCS G 33 Buried polyethylene (PE) piping systems for the supply of gaseous fuels - Part 1: General [ISO 4437-1:2014, Plastics piping systems for the supply of gaseous fuels - Polyethylene (PE) - Part 1: General, MOD] ISSUED ON: NOVEMBER 27, 2023 IMPLEMENTED ON: JUNE 01, 2024 Issued by: State Administration for Market Regulation; National Standardization Administration.

Table of Contents

Foreword ... 3 Introduction ... 5 1 Scope ... 6 2 Normative references ... 6 3 Terms, definitions, symbols and abbreviations ... 8 4 Materials ... 13 5 Test methods ... 18 6 Inspection report requirements ... 22 Appendix A (Informative) Comparison of structure numbers between this document and ISO 4437-1:2014 ... 24 Appendix B (Informative) Technical differences between this document and ISO 4437- 1:2014 and their reasons ... 26 Appendix C (Informative) Relationship between maximum working pressure, working temperature and RCP critical pressure ... 30 Appendix D (Informative) Additional information on PE 100-RC materials ... 31 Appendix E (Normative) Parameters and values of hot-melt butt welding procedure 33 Appendix F (Normative) Changes and evaluation of compounds ... 35 References ... 37

Foreword

This document was drafted in accordance with the provisions of GB/T 1.1-2020 "Directives for standardization - Part 1: Rules for the structure and drafting of standardizing documents". This document is Part 1 of GB/T 15558 "Buried polyethylene (PE) piping systems for the supply of gaseous fuels". GB/T 15558 has published the following parts: - Part 1: General; - Part 2: Pipes; - Part 3: Fittings; - Part 4: Valves; - Part 5: Fitness for purpose of the system. This document modifies and adopts ISO 4437-1:2014 "Plastics piping systems for the supply of gaseous fuels - Polyethylene (PE) - Part 1: General". Compared with ISO 4437-1:2014, this document has more structural adjustments. See Appendix A for a comparison of the structural number changes between the two documents. Compared with ISO 4437-1:2014, this document has more technical differences; the outer margins of the involved clauses are marked with a vertical single line (︱). A list of these technical differences and their reasons is given in Appendix B. This document has made the following editorial changes: - To coordinate with the existing standard, CHANGE the name of the standard to "Buried polyethylene (PE) piping systems for the supply of gaseous fuels - Part 1: General"; - To facilitate the understanding and use of the standard, DELETE the notes that do not conform to China's national conditions, changing or adding some notes; - ADD Appendix C (Informative) "Relationship between maximum working pressure and working temperature and RCP critical pressure"; - ADD Appendix D (Informative) "Additional information on PE 100-RC materials"; - DELETE Appendix A (Informative) of ISO 4431-1:2014. Please note that some of the contents of this document may involve patents. The issuing Buried polyethylene (PE) piping systems for the supply of gaseous fuels - Part 1: General

1 Scope

This document specifies the material requirements and inspection report requirements for buried polyethylene (PE) piping systems for the supply of gaseous fuels; describes the corresponding test methods. This document, together with other parts of GB/T 15558, is applicable to buried polyethylene (PE) piping systems for the supply of gaseous fuels, which have an operating temperature of -20 °C ~ 40 °C and a maximum operating pressure (MOP) not exceeding 1.0 MPa. Note 1: The maximum operating pressure of the pipeline system is related to the operating temperature and the critical pressure of the material's resistance to rapid crack propagation (RCP), see Appendix C. The reference operating temperature is 20 °C. Note 2: The MOP of polyethylene pipes is determined based on the design stress σD, the influence of RCP performance is considered; the MOP depends on the minimum required strength (MRS) of the material type, the standard dimension ratio (SDR), the overall service (design) factor (C ≥ 2), etc. Note 3: The relevant parties are responsible for appropriately selecting the products specified in GB/T 15558 (all parts) according to specific application requirements and in combination with relevant regulations, standards or specifications.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, for referenced documents with dates, only the version corresponding to that date applies to this document; for referenced documents without dates, the latest version (including all amendments) applies to this document. GB/T 1033.1 Plastics - Methods for determining the density of non-cellular plastics - Part 1: Immersion method, liquid pycnometer method and titration method (GB/T 1033.1-2008, ISO 1183-1:2004, IDT) GB/T 1033.2 Plastics - Methods for determining the density of non-cellular plastics - Part 2: Density gradient column method (GB/T 1033.2-2010, ISO 1183-2:2004, It is tested by direct calcination method according to GB/T 9345.1. 5.10 Tensile fracture nominal strain and tensile yield stress Prepare specimens according to GB/T 1845.2 and test according to GB/T 1040.2. 5.11 Trace metal element content It is tested according to GB/T 39994. During arbitration, prepare specimens by dry ashing method and test by inductively coupled plasma spectrometer (ICP-OES method). 5.12 Strain hardening test (SHT) It is tested according to GB/T 40919. The number of specimens is 5. 5.13 Accelerated full-notch creep test (AFNCT) It is tested according to GB/T 32682. The length × width × thickness of the specimen is 100 mm × 10 mm × 10 mm; the notch depth is 1.6 mm. The number of specimens is 4. 5.14 Resistance to gas components 5.14.1 Specimens Use dn32 mm, SDR 11 pipe specimens, the number of specimens is 3. If there is a clear relationship with the test results of dn32 mm, SDR 11 pipes, other specifications of pipe specimens can be used. 5.14.2 Condensate The condensate is composed of a mixture of 50% by mass of n-decane (99%) and 50% by mass of 1,3,5-trimethylbenzene. 5.14.3 Conditioning Fill the pipe with condensate; place it in an air environment at (23 ± 2) °C for 1500 h for conditioning. 5.14.4 Test It is tested according to GB/T 6111. The internal medium of the specimen is condensate, the external medium is water, the A-type joint is used. 5.15 Weather resistance 5.15.1 Test specimen Use pipe specimens with dn110 mm, SDR 11, length of 1 m. 5.15.2 Test steps Mark the exposed surface of the pipe sample; test according to GB/T 3681.2. After sun exposure with a total energy of at least 3.5 GJ/m2, remove the specimen and test: a) Conduct a fusion strength test on the socket end of the electric fusion pipe fitting according to GB/T 19808, where the electric fusion joint is prepared at (23 ± 2) °C; the number of specimens is 4; b) Conduct a break elongation test and a hydrostatic strength test. The break elongation test is conducted according to GB/T 8804.3; the specimen is prepared from the exposed surface of the pipe; the hydrostatic strength test is conducted according to GB/T 6111. 5.16 Rapid crack propagation resistance (RCP) It is tested according to GB/T 19280. If the test results according to GB/T 19280 do not meet the requirements of Table 3, retest according to ISO 13478; use the full-size test results as the final basis for judgment. In this case, pC,FS ≥ 1.5 × MOP. 5.17 Resistance to slow crack growth (notch test) It is tested according to GB/T 18476. If the accelerated notched pipe test (ANPT) is used, the specimen can be immersed in a constant temperature bath of 80 °C and 2% (mass fraction) nonylphenol polyoxyethylene ether neutral solvent; the internal medium of the specimen is water; the test is carried out according to GB/T 18476. 5.18 Determination of failure form of butt fusion tensile test 5.18.1 Specimen Use the parameters specified in Appendix E, to prepare two sections of pipe into butt fusion joints according to the procedure of GB/T 19809. 5.18.2 Test It is tested according to GB/T 19810.

6 Inspection report requirements

6.1 The manufacturer of compounds shall provide classification certificates according ......

Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Image 1     Image 2     Image 3     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of English version of GB/T 15558.1-2023 be delivered?Answer: The full copy PDF of English version of GB/T 15558.1-2023 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 15558.1-2023_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 15558.1-2023_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 15558.1-2023 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB/T 15558.1-2023?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 15558.1-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB/T 15558.1-2023?

A step-by-step guide to download PDF of GB/T 15558.1-2023_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 15558.1-2023".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9