Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 15558.4-2023 English PDF

US$909.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 15558.4-2023: Buried polyethylene(PE) piping systems for the supply of gaseous fuels - Part 4: Valves
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 15558.4-2023909 Add to Cart 7 days Buried polyethylene(PE) piping systems for the supply of gaseous fuels - Part 4: Valves Valid

Similar standards

GB/T 15558.1   GB/T 19472.1   GB/T 15560   GB/T 43982.11   GB/T 15558.5   GB/T 15558.2   

Basic data

Standard ID: GB/T 15558.4-2023 (GB/T15558.4-2023)
Description (Translated English): Buried polyethylene(PE) piping systems for the supply of gaseous fuels - Part 4: Valves
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: G33
Classification of International Standard: 83.140.30
Word Count Estimation: 45,487
Date of Issue: 2023-11-27
Date of Implementation: 2024-06-01
Older Standard (superseded by this standard): GB/T 15558.3-2008
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 15558.4-2023: Buried polyethylene(PE) piping systems for the supply of gaseous fuels - Part 4: Valves


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 83:140:30 CCSG33 National Standards of People's Republic of China Replace GB/T 15558:3-2008 Buried polyethylene (PE) piping system for gas Part 4: Valves Polyethylene(PE)-Part 4:Valves,MOD] Published on 2023-11-27 2024-06-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration Committee

Table of contents

Preface III Introduction V 1 Scope 1 2 Normative references 1 3 Terms, definitions, symbols and abbreviations 2 4 Materials 3 5 Product Categories 4 6 Requirements 5 7 Test methods 10 8 Inspection Rules 12 9 flag 15 10 Technical Documents 16 11 Packaging, transportation and storage16 Appendix A (informative) This document is compared with ISO 4437-4:2022 structure number comparison list 17 Appendix B (informative) Technical differences between this document and ISO 4437-4:2022 and their reasons 19 Appendix C (Normative) Sealing test (inner seal and outer seal) test method 22 Appendix D (normative) Operating torque test method 24 Appendix E (Normative) Bending resistance test method 26 Appendix F (normative) Temperature cycle resistance test method 28 Appendix G (normative) Sealing test method after temperature cycle under bending conditions 30 Appendix H (Normative) Operating torque and sealing test methods after tensile loading 32 Appendix I (Normative) Sealing performance of opening and closing device after bearing bending load 34 Appendix J (normative) Valve integrity test method after impact 36 Reference 38

Foreword

This document complies with the provisions of GB/T 1:1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting: This document is Part 4 of GB/T 15558 "Underground polyethylene (PE) piping system for gas use": GB/T 15558 has been released The following parts: ---Part 1: General provisions; ---Part 2: Pipes; ---Part 3: Pipe fittings; ---Part 4: Valves; ---Part 5: System suitability: This document replaces GB/T 15558:3-2008 "Buried polyethylene (PE) piping system for gas use - Part 3: Valves" and is consistent with Compared with GB/T 15558:3-2008, in addition to structural adjustments and editorial changes, the main technical changes are as follows: a) The maximum working pressure is increased by no more than 1:0MPa (see Chapter 1); b) The nominal outer diameter range has been changed (see Chapter 1, Chapter 1 of GB/T 15558:3-2008); c) Changes in terms and definitions (see Chapter 3, Chapter 3 of GB/T 15558:3-2008); d) The requirements for recycled materials/recycled materials in polyethylene compounding have been changed (see 4:1:3, 4:2:1 of GB/T 15558:3-2008); e) The requirements for metal materials have been changed (see 4:2:2, 4:1 of GB/T 15558:3-2008); f) Changed the requirements for elastic seals (see 4:2:3, 4:3 of GB/T 15558:3-2008); g) Changed lubricant requirements (see 4:2:4, 4:4 of GB/T 15558:3-2008); h) Added requirements for recycled materials/recycled materials for non-polyethylene parts (see 4:2:5); i) The weldability requirement is deleted (see 4:5 of GB/T 15558:3-2008); j) Added requirements for pre-installed components (see 4:2:6); k) Added product classification (see Chapter 5); l) Changed the valve color requirements (see 6:2, 5:1 of GB/T 15558:3-2008); m) The general requirements for valve design have been changed (see 6:3:1, 5:2 of GB/T 15558:3-2008); n) Added valve body port design requirements (see 6:3:3); o) Added appearance requirements for factory prefabricated joints (see 6:3:6); p) Added relevant requirements for brackets to prevent the socket from being out of round (see 6:4:1); q) The relevant dimensional requirements for the square hole key of the operating cap have been changed (see 6:4:4); r) Changed the parameters of low-pressure seal test, pressure drop, operating torque, and stopping strength (see 6:5, GB/T 15558:3-2008 7:2); s) Added bending resistance (dn >63mm) and valve testing requirements when dn >125mm (see 6:5, GB/T 15558:3- 7:2 of:2008); t) Added requirements for torsional strength and strain hardening test (SHT) of hoisting devices (see 6:5); u) Added ash content, carbon black content, carbon black dispersion/pigment dispersion, and changed the requirements for oxidation induction time (see 6:6, GB/T 15558:3- Chapter 8 of:2008); v) Added gas flow and system applicability requirements (see 6:7 and 6:8); w) Added condition adjustment time and test standard environment, appearance and color, opening and closing device torsional strength, strain hardening test, ash content Test method requirements; changed the requirements for dimensional measurement and hydrostatic pressure testing (see Chapter 7, Chapter 9 of GB/T 15558:3-2008); x) The batch group requirements have been changed (see 8:2:1, 10:4:1 of GB/T 15558:3-2008); y) Added the list of inspection items (see 8:4:1); z) The requirements for final inspection and type inspection have been changed (see 8:3 and 8:5, 10:2 and 10:3 of GB/T 15558:3-2008); aa) Added labeling requirements for internal fluid and compound brands (see 9:2); ab) Changes in technical documentation requirements (see Chapter 10, 12:4 of GB/T 15558:3-2008); ac) Changes in packaging, transportation and storage requirements (see Chapter 11, Chapter 12 of GB/T 15558:3-2008); ad) Changed the test method of sealing test (inner seal and outer seal) (see Appendix C, 9:5 of GB/T 15558:3-2008); ae) Changed the sealing performance of the opening and closing device after bearing bending load (see Appendix I, Appendix D of GB/T 15558:3-2008): This document is modified to adopt ISO 4437-4:2022 "Plastic piping systems for gas use polyethylene (PE) Part 4: Valves": Compared with ISO 4437-4:2022, this document has many structural adjustments: Comparison list of structure number changes between two files See Appendix A for the table: Compared with ISO 4437-4:2022, there are many technical differences between this document and the clauses involved in the outer margin of the page: Single lines (|) are marked: A list of these technical differences and their causes is shown in Appendix B: The following editorial changes have been made to this document: ---In order to coordinate with the existing standards, the name of the standard is changed to "Buried polyethylene (PE) pipeline system for gas use Part 4: Valves"; ---In order to facilitate the understanding and use of the standard, notes that are not in line with my country's national conditions have been deleted, and some notes have been changed or added: Please note that some content in this document may be subject to patents: The publisher of this document assumes no responsibility for identifying patents: This document is proposed by China Light Industry Federation: This document is under the jurisdiction of the National Technical Committee for Standardization of Plastic Products (SAC/TC48): This document was drafted by: Yada Plastic Products Co:, Ltd:, Beijing Songtiancheng Technology Co:, Ltd:, Ningbo Yuhua Industrial Co:, Ltd:, Ningbo Hengyuan Precision Pipe and Valve Technology Co:, Ltd:, Guangdong Liansu Technology Industrial Co:, Ltd:, Cangzhou Mingzhu Plastic Co:, Ltd:, Jilin Song Jiang Plastic Pipe Equipment Co:, Ltd:, Zhejiang Xinda Plastic Pipe Fittings Co:, Ltd:, Beijing Technology and Business University, Hong Kong and China Gas Company Limited, Egypt Veco Plastic Technology (Anhui) Co:, Ltd:, Chengde Precision Testing Machine Co:, Ltd:, Beijing Gas Group Co:, Ltd:, Zhengzhou China Resources Gas Co:, Ltd:, China Gas Industrial (Shenzhen) Co:, Ltd:, and Shenzhen Gas Group Co:, Ltd: The main drafters of this document: Wang Zhiwei, Lin Songyue, Sun Zhiqiang, Chen Jianqiang, Li Tongyi, Chi Yongsheng, Wang Haorong, Wang Lijun, Xiang Aimin, He Jianwen, Yang Jian, Wang Xinhua, Bai Liping, Jia Fengxiao, Nie Tingzhe, Li Heshan, Li Yu: The previous versions of this document and the documents it replaces are as follows: ---First published as GB/T 15558:3-2008 in:2008;

Introduction

GB/T 15558 "Buried Polyethylene (PE) Pipeline System for Gas" is to standardize the materials of buried polyethylene (PE) pipeline system for gas: Materials, pipes, fittings, valves and system suitability requirements: During this revision process, GB/T 15558:1-2023 and Replaced GB/T 15558:1-2015, GB/T 15558:2-2005 and GB/T 15558:3-2008 respectively: GB/T 15558 "Buried Polyethylene (PE) Pipeline System for Gas" was drafted based on the actual production and application of polyethylene pipeline products in my country: It consists of five parts: general principles, pipes, fittings, valves and system applicability: ---Part 1: General principles: The purpose is to establish the terms, definitions, symbols and regulations applicable to buried polyethylene (PE) piping systems for gas: Abbreviations, materials, test methods and inspection report requirements: ---Part 2: Pipes: The purpose is to establish terms, definitions, symbols and abbreviations applicable to buried polyethylene (PE) pipes for gas language, materials, product classification, requirements, test methods, inspection rules, marking and packaging, transportation and storage: ---Part 3: Pipe fittings: The purpose is to establish terms, definitions, symbols and abbreviations applicable to buried polyethylene (PE) pipe fittings for gas language, materials, product classification, requirements, test methods, inspection rules, markings, technical documents and packaging, transportation and storage: ---Part 4: Valves: The purpose is to establish terms, definitions, symbols and abbreviations applicable to buried polyethylene (PE) valves for gas use: language, materials, product classification, requirements, test methods, inspection rules, markings, technical documents and packaging, transportation and storage: ---Part 5: System suitability: The purpose is to establish the system suitability for buried polyethylene (PE) piping systems for gas Terms, definitions, requirements, test methods and inspection rules: The performance requirements and test verification specified in this document are based on polyethylene ball valves: If applied to other types of valves, the correlation needs to be checked: Can meet the requirements for further verification: Buried polyethylene (PE) piping system for gas Part 4: Valves

1 Scope

This document specifies the materials, product classification, specifications, dimensions, deviations and physical properties of underground polyethylene valves for gas use (hereinafter referred to as "valve"): Mechanical properties, inspection rules, markings, technical documents and packaging, transportation and storage requirements describe the corresponding test methods: This document, together with other parts of GB/T 15558, is applicable to operating temperatures of -20℃~40℃ and maximum operating pressure (MOP) Buried polyethylene pipeline system for gas not exceeding 1:0MPa: This document is applicable to gas buried ground with a nominal outer diameter dn of 16mm~400mm made of PE100 or PE80 grade compounds: Polyethylene valve: Note 1: When transporting artificial coal gas and liquefied petroleum gas, it is necessary to consider the impact of other components (such as aromatic hydrocarbons and condensate) present in the gas on the valve performance at a certain concentration: adverse effects on performance: Note 2: The maximum working pressure of the pipeline system is related to the working temperature and the material’s rapid crack propagation resistance (RCP) critical pressure, see GB/T 15558:1-2023 Appendix C: The reference operating temperature is 20℃: Note 3: Relevant parties have the responsibility to appropriately select the products specified in GB/T 15558 (all parts) based on specific application needs and in combination with relevant laws, standards and specification requirements: product:

2 Normative reference documents

The contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document: GB/T 2828:1 Enumeration sampling inspection procedures Part 1: Batch-by-batch inspection sampling plan retrieved by acceptance quality limit (AQL) (GB/T 2828:1-2012,ISO 2859-1:1999,IDT) GB/T 2918 Standard environment for conditioning and testing of plastic specimens (GB/T 2918-2018, ISO 291:2008, MOD) GB/T 3682:1 Measurement of melt mass flow rate (MFR) and melt volume flow rate (MVR) of plastic thermoplastics Part 1: Standard method (GB/T 3682:1-2018, ISO 1133-1:2011, MOD) GB/T 6111 Determination of internal pressure resistance of thermoplastic piping systems for fluid transportation (GB/T 6111-2018, ISO 1167-1:2006, ISO 1167-2:2006, ISO 1167-3:2007, ISO 1167-4:2007, NEQ) GB/T 8806 Determination of dimensions of plastic components of plastic piping systems (GB/T 8806-2008, ISO 3126:2005, IDT) GB/T 9345:1 Determination of ash content of plastics Part 1: General method (GB/T 9345:1-2008, ISO 3451-1: 1997,IDT) GB/T 13021 Determination of carbon black content in polyolefin pipes and fittings Calcination and pyrolysis method (GB/T 13021-2023, ISO 6964:2019,IDT) GB/T 15558:1-2023 Buried polyethylene (PE) piping system for gas use Part 1: General principles (ISO 4437-1:2014, MOD) GB/T 15558:2-2023 Buried polyethylene (PE) piping systems for gas use Part 2: Pipes (ISO 4437-2:2014, MOD) GB/T 15558:3-2023 Buried gas polyethylene (PE) piping systems Part 3: Pipe fittings (ISO 4437-3:2014,
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 15558.4-2023_English be delivered?

Answer: Upon your order, we will start to translate GB/T 15558.4-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 15558.4-2023_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 15558.4-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.