| GB/T 14598.10-2012 English PDFUS$519.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 14598.10-2012: Measuring relays and protection equipment -- Part 22-4: Electrical disturbance tests -- Electrical fast transient/burst immunity test Status: Obsolete GB/T 14598.10: Historical versions
 Basic dataStandard ID: GB/T 14598.10-2012 (GB/T14598.10-2012)Description (Translated English): Measuring relays and protection equipment -- Part 22-4: Electrical disturbance tests -- Electrical fast transient/burst immunity test Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K45 Classification of International Standard: 29.120.70 Word Count Estimation: 13,199 Older Standard (superseded by this standard): GB/T 14598.10-2007 Quoted Standard: GB/T 14598.2-2011; GB/T 17626.4-2008; IEC 60050-161 Adopted Standard: IEC 60255-22-4-2008, IDT Regulation (derived from): National Standards Bulletin No. 13 of 2012 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies requirements for electrical fast transient immunity test General requirements. These tests apply to the power system used for measuring relays and protection equipment, including devices used in conjunction with these control, moni GB/T 14598.10-2012: Measuring relays and protection equipment -- Part 22-4: Electrical disturbance tests -- Electrical fast transient/burst immunity test---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Measuring relays and protection equipment Part 22-4. Electrical disturbance tests Electrical fast transient/burst immunity test ICS 29.120.70 K45 National Standards of People's Republic of China Replacing GB/T 14598.10-2007 Measuring relays and protection equipment Part 22-4. Electrical disturbance tests Electrical fast transient/burst immunity test Part 22-4. Electricaldisturbancetests- (IEC 60255-22-4.2008, IDT) Issued on. 2012-11-01 2012-06-29 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsIntroduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 test severity 2 5 3 Test Equipment 6 Test Configuration 3 7 Test Procedure 5 8 5 acceptance criteria 9 Test Report 6 Appendix A (informative) Background information fast transient/burst immunity test 7 Annex B (informative) Electromagnetic environment test sample A and B are two levels of 8 Test port 1 for measuring relays and protection equipment 2 Figure 2 The test configuration example of the coupling/decoupling network 4 Figure 3 test configuration using the example of capacitive coupling clamp 5 Table 1 is the test voltage test device port 3 Table 2 acceptance criteria 6ForewordGB/T 14598 "for measuring relays and protection equipment" is divided into several parts. --- Part 1. Electrical relays - Part 23. Contact performance; --- Part 3. Electrical relays - Part 5. Measuring relays and protection equipment insulation coordination requirements and tests; --- Part 4. Electrical relays Part XIV. Priority value of the electrical contacts of the relay contact life test load; --- Part 5. Electrical relays - Part 15. Electrical characteristics of relay contacts life testing of test equipment; --- Part 6. Electrical relays - Part 18. There are no size or generic relay; --- Part 7. Electrical relays - Part 3. Single input dependent or independent time energizing quantity measuring relays; --- Part 8. Electrical relays - Part 20. Protection system; --- Part 9. 22-3 metric part relays and protection equipment. Electrical disturbance tests --- radiated electromagnetic field immunity; --- Part 10. 22-4 section for measuring relays and protection equipment. Electrical disturbance tests - Electrical fast transient/burst immunity Test; --- Part 11. Part 11 for measuring relays and protection equipment. Auxiliary power port voltage dips, short interruptions, voltage variations And ripple; --- Part 13. Electrical relays - Part 22-1. Electrical disturbance tests for measuring relays and protection 1MHz pulse device Immunity test; --- Part 14. Measuring Part 22-2 relays and protection equipment. Electrical disturbance tests --- electrostatic discharge test; --- Part 15. Electrical relays - Part 8. Thermal electrical relays; --- Part 16. Electrical relays - Part 25. Electromagnetic emission tests measure relays and protection equipment; --- Part 17. Electrical relays - Part 22-6. Measuring relays and protection equipment - Electrical disturbance tests --- RF field sense Should be conducted disturbances immunity; --- Part 18. Measuring relays and protection equipment - Part 22-5. Electrical disturbance tests - Surge immunity test; --- Part 19. Electrical relays - Part 22-7. Measuring relays and protection equipment - Electrical disturbance tests --- frequency immunity Test; --- Part 20. Electrical relays - Part 26. Measuring relays and protection equipment electromagnetic compatibility requirements; --- Part 27. Part 27 measurement relays and protection devices. product safety requirements; --- Part 300. Computer transformer protection equipment requirements; --- Section 301. Computer generator transformer fault recorder technology requirements; --- Part 303. Digital motor protection devices General. This section GB/T 14598 Part 10. This section drafted in accordance with GB/T 1.1-2009 given rules. This Part replaces GB/T 14598.10-2007 "Electrical relays - Part 22-4. Electrical Sao measuring relays and protection equipment --- Electrical interference test fast transient/burst immunity test ", compared with the GB/T 14598.10-2007, the main technical changes are as follows. --- Standard name becomes "Part 22-4 for measuring relays and protection equipment. Electrical disturbance tests - Electrical fast transient/burst Immunity test "; --- Repetition rate to test part of the voltage (5 or 100) (1 ± 10%) kHz. Consistency correspondence between this part of international documents and normative references of our files are as follows. --- GB/T 4365-2003 Electrotechnical terminology Electromagnetic compatibility [IEC 60050 (161).1990, IDT]. This section uses the translation method is equivalent to using IEC 60255-22-4.2008 "Part 22-4 for measuring relays and protection equipment. Electrical Sao Test for immunity Electrical fast transient/burst immunity test. " This part is proposed by the China Electrical Equipment Industrial Association. This part of the National measuring relays and protection equipment Standardization Technical Committee (SAC/TC154) centralized. This section is drafted. Nanjing NARI-RELAYS Electric Co., Guodian Nanjing Automation Co., Ltd., Xuchang smart grid equipment Test and Research Institute, XJ Electric Co., Ltd., Beijing Sifang Automation Co., Ltd., Xuchang Cape Electrical Testing Institute, beads Sea Wanlida Electric Co., Ltd., Beijing Purple Control Co., Ltd., Dongfang Electronics Co., Ltd., integrated into an electronic Co., Ltd., Shanghai Relay Co., Ltd., Hebei North Heng Electric Co., Ltd., Shanghai Electric Power Automation Tianzheng tomorrow Limited, ABB (China) have Limited, Schneider Electric (China) Investment Co., Ltd., Jiang Su Jinzhi Technology Co., Ltd., Siemens Power Automation Limited. The main drafters of this section. Anti-Lee Zhong Ze Zhang, Liu, Jin Quanren, Fan Wei, Liquan Xi, Wang Lei, Hu is the right constitutional army, Du Sheng-yun, Wang Jiemin, Tian Jianjun, Mao Yasheng, Li Yan, Li Yao, Shen Jun, Zhu Bin, Marsh die. This part of the standard replaces the previous editions are. --- GB/T 14598.10-1996, GB/T 14598.10-2007. Measuring relays and protection equipment Part 22-4. Electrical disturbance tests Electrical fast transient/burst immunity test1 ScopeGB/T 14598 in this section to GB/T 17626.4-2008 basis, refer to the appropriate part of this publication, it provides for electrical fast General requirements for fast transient immunity test. These measuring relays and protection equipment tests for electric power used by the system, including those Apparatus for use with control, monitoring and process interface equipment. Purpose of the test is to verify the test was repeated and the apparatus is energized by the subject, such as inductive loads, relay contact bounce caused by Of Fast Transient (burst) whether the harassment work correctly. The requirements of this section apply to new measuring relays and protection equipment, all the tests only type testing. The purpose of this section is to provide. ● The definitions of terms used; ● test severity; ● test equipment; ● Test configurations; ● test procedures; ● acceptance criteria; ● test report.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 14598.2-2011 metric Part 1 relays and protection equipment. General requirements (IEC 60255-1.2009, IDT) GB/T 17626.4-2008 Electromagnetic compatibility - Testing and measurement techniques - Electrical fast transient burst immunity test (IEC 61000- 4-4.2004, IDT) IEC 60050-161 International Electrotechnical Vocabulary - Part 161. Electromagnetic compatibility (Internation Electrontechnical Vocabulary.Chapter161. Electromagneticcompatibility)3 Terms and DefinitionsThe following terms and definitions apply to this document. 3.1 Subjects means equipmentundertest; EUT Is means tested. It can be a measure of the relay or a protection device. 3.2 Auxiliary equipment auxiliaryequipment Provision of equipment for the desired signal is a pilot plant work, and are used to verify the performance of the pilot plant equipment. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 14598.10-2012_English be delivered?Answer: Upon your order, we will start to translate GB/T 14598.10-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 14598.10-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 14598.10-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 14598.10-2012?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 14598.10-2012 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |