GB/T 10066.11-2016 English PDFUS$294.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 10066.11-2016: Test methods for electroheat installations -- Part 11: Submerged-arc furnaces Status: Valid GB/T 10066.11: Historical versions
Basic dataStandard ID: GB/T 10066.11-2016 (GB/T10066.11-2016)Description (Translated English): Test methods for electroheat installations -- Part 11: Submerged-arc furnaces Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K61 Classification of International Standard: 25.180.10 Word Count Estimation: 15,158 Date of Issue: 2016-02-24 Date of Implementation: 2016-09-01 Older Standard (superseded by this standard): GB/T 10066.11-2005 Quoted Standard: IEC 60398; IEC 60519-1-2010; IEC 60519-4 Adopted Standard: IEC 60683-2011, IDT Regulation (derived from): National Standard Announcement No Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 10066.11-2016: Test methods for electroheat installations -- Part 11: Submerged-arc furnaces---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Test methods for electroheat installations - Part 11. Submerged-arc furnaces ICS 25.180.10 K61 National Standards of People's Republic of China Replacing GB/T 10066.11-2005 Test methods for electroheat installations - Part 11. submerged arc furnace (IEC 60683.2011, IDT) Issued on. 2016-02-24 2016-09-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released CONTENTSIntroduction Ⅲ ... 1 Scope 1 ... 2 Normative references 1 ... 3 Terms and definitions ... Features 4 submerged arc furnace system 4 ... 4.1 submerged arc electric furnace assembly 4 ... 4.2 Y/Δ switch 4 ... 4.3 submerged arc furnace type 4 ... 4.4 submerged arc furnace works 4 ... 4.5 type electrode 5 ... 4.6 electrode system 5 ... 4.7 Water cooling 5 ... 4.8 Electrical connection 5 ... 5 General test conditions and test 5 ... 5.1 General test conditions 5 ... 5.2 Cold Test Item 6 ... 5.3 heat and hot commissioning pilot projects 6 ... 6 6 ... technical test 6.1 Electrical insulation 6 ... 6.2 Cooling Water System 7 ... 6.3 Characteristics of electrode regulator 7 ... 6.4 Determination of the process running the electrical characteristics 7 ... 6.5 secondary voltage measuring 8 ... 6.6 operating parameters 8 ... Reference 9 ...ForewordGB/T 10066 "Standard Test Method for electric apparatus" has 12 sections. --- Part 1. Common part; --- Part 3. determined induction furnaces and coreless induction furnace; --- Part 31. Determination of high-frequency induction heating power output of the generator means; --- Part 4. Indirect resistance furnaces; --- Part 5. electrochemical and plasma electric equipment; --- Part 6. Industrial microwave heating apparatus of power output measurement method; --- Part 7. Electric apparatus having an electron gun; --- Part 8. ESR furnaces; --- Part 9. high-frequency dielectric heating apparatus determination of power output; --- Part 10. Direct electric arc furnace; --- Part 11. submerged arc furnace; --- Part 12. infrared heating devices. This section GB/T Part 1,110,066, and used in conjunction with Part 1. This section drafted in accordance with GB/T 1.1-2009 given rules. This section instead of GB/T 10066.11-2005 "electric heat apparatus test methods Part 11. Buried arc furnace", and GB/T 10066.11-2005 compared to the main technical changes are as follows. a) "3 Terms and definitions", according to IEC 60683.2011, adds the following terms. --- Apparent power (see 3.2); --- Bottom electrode (see 3.3); --- Cold test (see 3.5); --- Dead (see 3.6); --- Furnace power consumption (see 3.9); --- Heat test (see 3.12); --- Reactive power (see 3.16); --- Reactive power compensation (see 3.17); --- Rectifier (see 3.18); --- Semiconductor inverter (see 3.19); --- Smoothing reactors (see 3.20). Delete the following terms. --- Furnace (see GB/T 10066.11-2005 in 3.3); --- Furnace high voltage switch (see GB/T 10066.11-2005 in 3.4); --- Furnace transformer rated capacity (see GB/T 10066.11-2005 3.6); --- Electrode holders (see GB/T 10066.11-2005 in 3.8); --- Primary asymmetry coefficient (see GB/T 10066.11-2005 in 3.11); --- Cooling water flow (see GB/T 10066.11-2005 in 3.15). b) increase the Chapter 4. Characteristics of submerged arc furnace system. This section identical with IEC 60683.2011 "Industrial electric equipment submerged arc furnace test methods" (in English). Consistency correspondence between this part of international documents and normative references of our files are as follows. --- GB/T 10066.1 Test Method for electric devices - Part 1. General section (GB/T 10066.1-2004, IEC 60398.1999, MOD) --- GB 5959.2-2008 Safety of electric devices - Part 2. Particular requirements for arc furnace apparatus (GB 5959.2-2008, IEC 60519-4.2006, IDT) For ease of use, the IEC 60683.2011, this section also made the following editorial changes. --- Modify the standard name, "Industrial electric equipment submerged arc furnace test methods" to "Test methods for electroheat installations - Part 11. submerged arc furnace", the English name of the corresponding changes. This part is proposed by the China Electrical Equipment Industrial Association. This part of the National Electric Equipment Industry Standardization Technical Committee (SAC/TC121) centralized. This section is drafted. Xi'an Institute Furnace Co., CISDI Engineering Technology Co., Ltd., China Metallurgical Furnace Engineering Technology Center, the State Quality Supervision and Inspection Center Furnace, Shaanxi electric engineering technology research center. The main drafters of this section. Yuanfang Lan, Ge Hua, Huangkui Gang, Zhu Lin. This part of the standard replaces the previous editions are. --- GB/T 10066.11-2005; --- GB/T 7405-1987. Test methods for electroheat installations - Part 11. submerged arc furnace1 ScopeGB/T 10066 in this section according to the rated power level of the main parameters of submerged arc furnace and the main operational characteristics 500kVA or more, and provides test procedures, test conditions and test methods for submerged arc furnaces. This section applies to a single electrode or multiple electrode submerged arc furnace. To further determine the technical and economic assessment of submerged arc furnace, additional testing may be necessary. Some semiconductor inverter control by a special furnace equipment, such as a controlled rectifier or controlled AC converter test by GB/T 3859.1 regulations.2 Normative referencesThe following documents for the application of this document is essential. For cited documents with dates, only the dated edition applies to this document. For undated references, the latest edition (including any amendments) applies to this document. Common test methods IEC 60398 industrial electric equipment IEC 60519-1.2010 electric heat means safety - Part 1. Generic requirements Safety - Part 2 IEC 60519-4 electric equipment. Particular requirements for arc heating device3 Terms and DefinitionsIEC 60519-1.2010 and defined the following terms and definitions apply to this document. NOTE. Common definitions refer to the International Electrotechnical Vocabulary GB/T 2900. On industrial electric entry defined in GB/T 2900.23 in. 3.1 Active activepower The average furnace under conditions of a period of time period of the instantaneous power (kW), see calculation formula (1). Note. The active power instantaneous value at any time, at any stage of the measurement. [GB/T 2900.74-2008,131-11-42, modified] 3.2 Apparent power apparentpower Submerged arc furnace for the power transformer rated power (MVA), are calculated in the formula (2) and (3). S = UI = P2 + Q2 (for single-phase submerged arc furnace) ... (2) S = 3UI (for three-phase submerged arc furnace) ... (3) ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 10066.11-2016_English be delivered?Answer: Upon your order, we will start to translate GB/T 10066.11-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 10066.11-2016_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 10066.11-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 10066.11-2016?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 10066.11-2016 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |