GB 50606-2010 PDF EnglishUS$735.00 · In stock · Download in 9 seconds
GB 50606-2010: Code for installation of intelligent building systems Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure Status: Valid
Similar standardsGB 50606-2010: Code for installation of intelligent building systems---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB50606-2010GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA UDC P GB 50606-2010 Code for Installation of Intelligent Building Systems Issued on. JULY 15, 2010 Implemented on. FEBRUARY 1, 2011 Issued by. Ministry of Housing and Urban-Rural Construction of the People’s Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China. NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA Code for Installation of Intelligent Building Systems Chief Development Department. Ministry of Housing and Urban-Rural Development of the People's Republic of China Approving Department. Ministry of Housing and Urban-Rural Development of the People's Republic of China Implementation Date. February 1, 2011 China Planning Press 2011 Beijing Table of Contents1 General Provisions... 9 2 Terms... 10 3 Basic Requirements... 11 4 Comprehensive Pipeline... 18 5 Generic Cabling System... 6 Information Network System... 27 7 Satellite TV Reception and Cable TV System... 32 8 Conference System... 39 9 Public Address System... 48 10 Information Facility System... 52 11 Information Application System... 63 12 Building Automation System... 66 13 Fire Alarm and Control System... 77 14 Security System... 80 15 Intelligent Integration System... 86 16 Lightning Protection and Grounding... 91 16.1 Equipment Installation... 91 17 Machine Room Engineering... 95 Appendix A Records of Project Implementation and Quality Control... 99 Appendix B Test Records... 105 Explanations of Wording in This Code... 136 List of Quoted Standards... 137 Code for Installation of Intelligent Building Systems1 General Provisions1.0.1 This code is formulated with a view to strengthening the management of the installation of intelligent building systems, guaranteeing the installation quality of intelligent building systems, and achieving advanced technology, reliable process, economy and rationality and efficient management. 1.0.2 This code is applicable to the installation of intelligent building systems in construction, renovation and extension engineering. 1.0.3 This code shall be used in supporting with the current national standards "Standard for Design of Intelligent Building" (GB/T 50314), "Unified Standard for Constructional Quality Acceptance of Building Engineering" (GB 50300), "Code for Acceptance of Quality of Intelligent Building Systems" (GB 50339), "The code of Construction Project Management " (GB/T 50326), "Evaluating standard for excellent quality of building engineering" (GB/T 50375), "Code of Acceptance of Construction Quality of Electrical Installation in Building" (GB 50303) and "Technical Code for Safety of Temporary Electrification on Construction Site" (JGJ 46). 1.0.4 The installation of intelligent building systems shall not only comply with the requirements stipulated in this code, but also comply with those in the current relevant ones of China.2 Terms2.0.1 Deepening design The process to refine the construction scheme on the basis of scheme design and technical design and also to plot the construction drawing. 2.0.2 Comprehensive pipeline The basic platform of the building intelligent system, which is the basic channel of the construction and normal function exertion of its subsystems and also is the public pipeline for the subsystems of building intelligent system to provide the demand. 2.0.3 Hybrid fiber coaxial The access network which takes optical fiber as the main line and coaxial cable as the distribution network. 2.0.4 Public address system An organic entirety formed by all the broadcasting equipment and facilities serving for public places and the acoustical environment of the public coverage areas. 2.0.5 Net control unit The device that is used for the communication between the server/workstation and the field control unit to complete the function transformation between the field control network and the IP network.3 Basic Requirements3.1 General Requirements 3.1.1 Before installation of intelligent building systems, deepening design shall be carried out on the basis of schematic design and technical design, and the construction drawing shall be plotted. 3.2.3 The construction quality management shall meet the following requirements. 3.3 Construction Preparation 3.3.5 The construction preparation for all the systems included in this code shall meet those specified in Section 3.3 of this code. 3.4 Project Implementation 3.4.1 Inspection and appearance quality acceptance shall be conducted over the installation quality of engineering equipment according to such engineering design documents as construction drawing by adopting such methods as on-site observation and random inspection and test. The inspection lots shall be divided according to those specified in Article 4.0.5 and Article 5.0.5 of the current national standard "Unified Standard for Constructional Quality Acceptance of Building Engineering" (GB 50300-2001). The quality acceptance records shall be filled in according to the corresponding requirements in appendixes when inspecting and shall also be kept properly.4 Comprehensive Pipeline4.1 General Requirements 4.1.1 The power wire cable and signal wire cable must not be laid in one wire pipe. 4.1.2 The construction of the wire cables of generic cabling system shall meet those specified in Chapter 5 of this code. 4.2 Construction Preparation 4.3 Pipeline Installation 4.3.1 Bridge installation shall meet the following requirements. 4.4 Wire Cable Laying 4.4.1 The wire cable shall be provided with permanent labels for waterproofing and friction resistance at both ends, and the characters on the labels shall be distinct and accurate. 4.4.2 Wire cables in a pipe shall not be twisted or buckled and shall be without joints. 4.4.3 The minimum allowable bending radius of wire cable shall meet those specified in Table 12.2.1-1 of the current national standard "Code of Acceptance of Construction Quality of Electrical Installation in Building" (GB 50303-2002). 4.5 Quality Control 4.6 Self-examination and Test 4.6.1 The bridge and wire pipe shall be inspected for their specification, position, bending and flattening degree, bending radius, connection, bridge ground wire, corrosion protection, pipe box fixation, pipe orifice treatment, protective layer and welding quality, etc. The bent pipe and connection accessories shall be of uniform radian and shall be free from such defects as folding, depression, crack, bending or flattening and dead turn, and the welds of pipe shall be at the outer side. 4.6.2 According to the requirements of deepening design documents, the specification, type, labeling and laying quality of wire cable shall be inspected.5 Generic Cabling System5.1 Construction Preparation 5.1.1 The preparation of materials and equipment used in engineering shall meet the following requirements. 5.2 Wire Cable Laying and Equipment Installation 5.2.1 In addition to complying with those specified in Section 4.4 of this code, the laying of wire cables shall also meet the following requirements. 5.2.2 The installation elevation of information outlet shall meet the design requirements, the horizontal distance between this outlet and the installed power socket shall be in accordance with those specified in Article 5.1.1 of the national standard "Code for Engineering Acceptance of Generic Cabling System" (GB 50312-2007). Where there is no requirement in the design, installation elevation of information outlet shall be equal to that of the power socket. 5.2.3 Wire cables in cabinet shall be banded on the cable management arms on both sides of the cabinet and shall be arranged neatly and beautifully, the distribution frame shall be installed firmly, and the information point labeling shall be accurate. 5.6 Quality Record 5.6.1 In addition to complying with those specified in Section 3.7 of this code, the quality record of the generic cabling system also shall comply with the relevant requirements of the current national standard "Code for Engineering Acceptance of Generic Cabling System" (GB 50312). 6 Information Network System 6.1 Construction Preparation 6.1.1 The construction organization shall complete the planning and configuration scheme of the information network system according to the requirements of design document and also shall be approved through the joint review of the design organization, development organization and using organization. 6.2 Equipment and Software Installation 6.2.1 Equipment installation of information network system shall meet the following requirements. 6.3 Quality Control 6.3.1 The dominant items shall meet the following requirements. 6.4 System Debugging 6.4.1 The debugging preparation shall meet the following requirements. 6.5.3 Attacking software used for the testing of network security system as well as their carriers shall be kept properly. 6.6 Quality Record 6.6.1 The configuration table of network equipment shall be filled in Table A.0.5 of this code. 6.6.2 Configuration table of application software system shall be filled in Table A.0.6 of this code. 6.6.3 Debugging record of network system shall be filled in Table B.0.4 of this code.7 Satellite TV Reception and Cable TV System7.1 Construction Preparation 7.1.1 The construction organization shall obtain the satellite TV reception and cable TV system engineering construction qualification issued by the relevant functional department of the nation or of the industry or speciality. 7.1.2 Prior to construction of satellite TV reception and cable TV system engineering, information such as corresponding field investigation, design documents and drawings shall be available. The construction shall be carried out in accordance with the design drawing. 7.2 Equipment Installation 7.2.1 Installation of satellite receiving antenna shall meet the following requirements. 7.2.2 Installation of optical workstation shall meet the following requirements. 7.2.6 The wire cable laying in case body shall be in accordance with the design requirements; when being bent, its bending radius shall not be less than the specified bending radius of wire cable; each wire cable shall be reliably connected and be made with labeling. 7.2.7 The installation height of amplifier case, branching distribution box and pass-by case from the bottom edge to the ground should not be less than 0.3 m. 7.2.10 Installation of the users' indoor terminals shall meet the following requirements. 7.3 Quality Control 7.4 System Debugging 7.4.3 System debugging of cable line and distribution network shall meet the following requirements. 7.5 Self-examination and Test 7.5.1 The satellite TV receiving system shall be inspected in accordance with the current professional standards "Methods of Measurement for Satellite Digital Television Receive-only Earth Station - System Measurement" (GY/T 149) and "Methods of Measurement for Satellite Digital Television Receive-only Earth Station - Outdoor Unit Measurement" (GY/T 151), and the index inspection results shall be in accordance with the requirements of the design documents. 7.6 Quality Record 7.6.1 The (positive) debugging record of optical node shall be filled in Table B.0.5 of this code. 7.6.2 The (reverse) debugging record of optical node shall be filled in Table B.0.6 of this code. 7.6.3 The (positive) debugging and testing record of amplifier shall be filled in Table B.0.7 of this code. 7.6.4 The (reverse) debugging record of amplifier shall be filled in Table B.0.8 of this code.8 Conference System8.1 Construction Preparation 8.1.1 Technical preparation shall meet the following requirements. 8.1.2 Construction environment shall meet the following requirements. 8.2 Equipment Installation 8.2.1 The setting of cabinets shall meet the following requirements. 8.2.5 Installation of speaker system shall meet the following requirements. 8.2.6 Installation of audio equipment shall meet the following requirements. 8.3 Quality Control 8.5.2 Inspection on video and audio switching and display systems shall meet the following requirements. 8.5.3 Inspection on centralized control system shall meet the following requirements. 8.6 Quality Record 8.6.1 In addition to complying with those specified in Section 3.7 of this code, the quality record of conference system also shall comply with the relevant requirements of national or professional standards.9 Public Address System9.1 Construction Preparation 9.1.1 Preparation for materials and equipment shall not only meet the requirements of 3.3.2 of this code, but also meet the following requirements. 9.2 Equipment Installation 9.2.3 Except the speaker, other equipment should be installed on the console, equipment cabinet or rack which located in the monitoring room (or machine room); where there is no monitoring room (machine room), the console, equipment cabinet or rack shall be installed at the place where is safe and convenient to control. 9.2.4 The arrangement of equipment in the equipment cabinet and rack shall allow the operator on duty to see them clearly for the frontage of a majority of the equipment, and allow the operator to operate and adjust them rapidly and conveniently as well as to monitor the running signals of each equipment. 9.3 Quality Control 9.4 System Debugging 9.4.1 Debugging preparation shall meet the following requirements. 9.4.2 Equipment debugging shall meet the following requirements. 9.5 Self-examination and Test 9.5.1 Inspection of transmission line shall meet the following requirements. 9.5.2 Measurement of the insulation resistance shall meet the following requirements. 9.5.3 Measurement of the ground resistance shall meet the following requirements. ......Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al. Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of English version of GB 50606-2010 be delivered?Answer: The full copy PDF of English version of GB 50606-2010 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.Question 2: Can I share the purchased PDF of GB 50606-2010_English with my colleagues?Answer: Yes. The purchased PDF of GB 50606-2010_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB 50606-2010 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.How to buy and download a true PDF of English version of GB 50606-2010?A step-by-step guide to download PDF of GB 50606-2010_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).Step 2: Search keyword "GB 50606-2010". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9 |