GB 39496-2020 English PDFUS$559.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB 39496-2020: Safety regulation for tailings pond Status: Valid
Basic dataStandard ID: GB 39496-2020 (GB39496-2020)Description (Translated English): Safety regulation for tailings pond Sector / Industry: National Standard Classification of Chinese Standard: Z61 Classification of International Standard: 73 Word Count Estimation: 30,392 Date of Issue: 2020-10-11 Date of Implementation: 2021-09-01 Older Standard (superseded by this standard): AQ 2006-2005 Quoted Standard: GB 16423; GB 50135; GB 50191 Regulation (derived from): National Standard Announcement No. 21 of 2020 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration Summary: This standard specifies the safety requirements for the construction, production and operation, mining, closure, safety inspection, emergency management of production and business units, and safety evaluation of tailings ponds. GB 39496-2020: Safety regulation for tailings pond---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.(Safety regulations for tailings pond) ICS 73 Z61 National Standards of People's Republic of China Replace AQ2006-2005 Safety regulations for tailings pond 2020-10-11 released 2021-09-01 implementation State Administration for Market Regulation Issued by the National Standardization Management Committee Table of contentsPreface Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Basic regulations 4 5 Tailings pond construction 5 5.1 Investigation of tailings pond 5 5.2 General requirements for tailings pond design 5 5.3 Tailings dam design 6 5.4 Flood drainage design 10 5.5 Safety monitoring facility design 11 5.6 Construction and acceptance of tailings pond 11 6 Production and operation of tailings pond 12 6.1 General provisions 12 6.2 Inbound tailings index detection 12 6.3 Dam construction and discharge of tailings 13 6.4 Reservoir water level control and flood prevention 14 6.5 Seepage control 15 6.6 Earthquake resistance and seismic resistance 15 6.7 Safety monitoring of tailings pond 15 6.8 Reservoir area and surrounding conditions regulations 16 6.9 Treatment of hidden dangers and major dangers of tailings pond 16 7 Tailings pond stop 17 8 Tailings storage closure 18 9 Safety inspection of production and business units 18 9.1 General provisions 18 9.2 Flood control safety inspection 18 9.3 Safety inspection of tailings dam 19 9.4 Safety inspection of ore drawing 20 9.5 Safety inspection of tailings reservoir area 20 9.6 Safety inspection of monitoring system 20 9.7 Safety inspection of other facilities 20 10 Emergency management of production and business units 20 11 Safety Evaluation of Tailings Pond 21 11.1 General provisions 21 11.2 Safety pre-evaluation 22 11.3 Safety acceptance evaluation 22 11.4 Assessment of safety status 23 12 Tailings pond project archives 23 Appendix A (informative appendix) Sketch map of typical parameters of tailings pond 24 Appendix B (Normative Appendix) Tailings Naming Table 26ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard replaces AQ2006-2005 "Safety Technical Regulations for Tailings Pond". Compared with AQ2006-2005, except for structural adjustments and editorial changes, the main technical changes of this standard are as follows. --- Deleted part of the normative references, and only quoted GB 16423, GB 50135 and GB 50191 (see Chapter 2, Chapter 2 of AQ2006-2005); ---Modified terms and definitions such as tailings ponds (see Chapter 3, Chapter 3 of AQ2006-2005), and added wet tailings ponds and dry tailings ponds. Terms and definitions such as tailings pond (see Chapter 3); --- Revise the grading standards of the first-class tailing pond and the second-class tailing pond (see 4.5, 4.1 of AQ2006-2005); ---In the analysis method of the anti-sliding stability of the tailings dam slope, the simplified Bishop method and the corresponding minimum safety factor are added (see 5.3.16); ---Added relevant requirements for dynamic seismic calculation of tailings dams (see 5.3.17); ---Modified the flood control standard of tailing pond (see 5.4.1, 5.4.2 of AQ2006-2005); --- Deleted the content of "tailing pond safety" and "tailing pond utilization and reuse after tailing pond closure" (see Chapter 8 and Chapter 10 of AQ2006-2005); ---Added the content of "tailing pond mining" and "emergency management of production and business units" (see Chapter 7 and Chapter 10). This standard was proposed and managed by the Ministry of Emergency Management of the People's Republic of China. This standard is issued for the first time. Safety regulations for tailings pond1 ScopeThis standard specifies the construction, production operation, stoping, closure, safety inspection, emergency management of production and business units, safety evaluation, etc. of tailings ponds Safety requirements. This standard applies to tailings ponds within the territory of the People's Republic of China.2 Normative referencesThe following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this document. For undated references, the latest version (including all amendments) applies to this document. GB 16423 Safety Regulations for Metal and Nonmetal Mines GB 50135 High-rise structure design standard GB 50191 Code for seismic design of structures3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 Tailings pond A place used to store metal and non-metal mines for ore separation and discharge tailings. 3.2 Wet tailings pond Inbound tailings have natural fluidity, and the tailings reservoir that discharges tailings by hydraulic conveyance. 3.3 Dry tailings pond The tailings in the reservoir do not have natural fluidity, and the tailings reservoir with mechanical discharge of tailings and no water in the reservoir under non-flood operation conditions is adopted. 3.4 Full storage capacity The volume of space enclosed by the elevation level of the dam crest, below the outer slope of the tailings dam, and above the bottom of the reservoir (excluding the volume of the dam constructed by non-tailings). 3.5 Effective storage capacity The volume of space below the outer surface of the tailings dam and above the bottom of the silo for storing tailings (including suspended tailings slurry). 3.6 Flood storage capacity The volume of space that can accumulate flood water above the initial flood level and below the design flood level. 3.7 Total storage capacity Design the full storage capacity in the final state. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB 39496-2020_English be delivered?Answer: Upon your order, we will start to translate GB 39496-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB 39496-2020_English with my colleagues?Answer: Yes. The purchased PDF of GB 39496-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |