Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

DL/T 831-2015 English PDF

US$669.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
DL/T 831-2015: Guide on selection of furnace characteristic parameters for large pulverized coal fired boilers
Status: Valid

DL/T 831: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
DL/T 831-2015669 Add to Cart 5 days Guide on selection of furnace characteristic parameters for large pulverized coal fired boilers Valid
DL/T 831-2002RFQ ASK 9 days Guide on selection of furnace characteristic parameters for large pulverized coal fired power boilers Obsolete

Similar standards

GB/T 16507.2   GB/T 16507.1   GB/T 12145   DL/T 939   DL/T 649   DL/T 589   

Basic data

Standard ID: DL/T 831-2015 (DL/T831-2015)
Description (Translated English): Guide on selection of furnace characteristic parameters for large pulverized coal fired boilers
Sector / Industry: Electricity & Power Industry Standard (Recommended)
Classification of Chinese Standard: J98
Classification of International Standard: 27.060
Word Count Estimation: 29,231
Date of Issue: 2015-04-02
Date of Implementation: 2015-09-01
Older Standard (superseded by this standard): DL��T 831-2002
Quoted Standard: GB/T 211; GB/T 212; GB/T 213; GB/T 214; GB/T 219; GB 474; GB 475; GB/T 1574; GB/T 3715; GB/T 5751; GB/T 5762; DL/T 568; DL/T 660; DL/T 1106; DL/T 1446
Regulation (derived from): ?Energy Bureau Announcement 2015 No. 3
Issuing agency(ies): National Energy Administration
Summary: This standard specifies the main criteria and relevant limits for selecting the combustion mode and selecting the characteristic parameters of the furnace according to the designed coal quality for the large-capacity solid-state slag pulverized coal boilers, and also stipulates the requirements for the design of the furnace and the burner. This standard applies to the maximum continuous evaporation capacity of 1000t/h ~ 3000t/h level of large-capacity boilers.
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of DL/T 831-2015_English be delivered?

Answer: Upon your order, we will start to translate DL/T 831-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of DL/T 831-2015_English with my colleagues?

Answer: Yes. The purchased PDF of DL/T 831-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version DL/T 831-2015?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version DL/T 831-2015 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.