| CART (Up to 12 items/PDFs). How to add more items? Search 'GB/T 1.1' --> Add to Cart |
| Delete | 1 | JB/T 6457.2-2004_ENGLISH | Small-sized valve-regulated lead-acid batteries Part 2: Technical conditions | 1 | 4 | 439 | | Need to translate |
| Delete | 2 | JB/T 6465-1992_ENGLISH | (Rated voltage of 35kV power cable indoor type, outdoor type Bushing terminal) | 1 | 4 | 439 | | Need to translate |
| Delete | 3 | NY/T 3250-2018_ENGLISH | (High oleic peanut) | 1 | 3 | 149 | | Need to translate |
| Delete | 4 | JB/T 7219-1994_ENGLISH | (Cylinder Pressure Filter. Filter performance test method) | 1 | 6 | 879 | | Need to translate |
| Delete | 5 | JB/T 6440-1992_ENGLISH | (Pressure valve castings Radiographic examination) | 1 | 4 | 599 | | Need to translate |
| Delete | 6 | GA/T 1060.2-2013_ENGLISH | General technical requirements for portable instruments for radioactive material detection and radionuclides identification-Part 2: Radionuclides identification instruments | 1 | 4 | 559 | | Need to translate |
| Delete | 7 | NB/SH/T 6025-2021_ENGLISH | (Liquid petroleum pitch) | 1 | 3 | 259 | | Need to translate |
| Delete | 8 | LY/T 1502-2022_ENGLISH | Masson pine poles | 1 | 3 | 109 | | Need to translate |
| Delete | 9 | GB/T 41638.3-2023_ENGLISH | Plastics - Carbon and environmental footprint of biobased plastics - Part 3: Process carbon footprint - Requirements and guidelines for quantification | 1 | 3 | 294 | | Need to translate |
| Delete | 10 | JB/T 6464-1992_ENGLISH | (Rated voltage 26/35kV and below power cable wrap-through connectors) | 1 | 3 | 359 | | Need to translate |
| Delete | 11 | JB/T 6439-2008_ENGLISH | Methods of magnetic examination for valves | 1 | 3 | 239 | | Need to translate |
| Delete | 12 | YD/T 1388.2-2005_ENGLISH | Technical requirements of the soft switch based services. Part 2: Number identification services | 1 | 5 | 879 | | Need to translate |
| More PDF Samples Total (USD) | 5203.00 |