GB/T 5753-2013 English PDFUS$174.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 5753-2013: Steel cord conveyor belts -- Methods for the determination of total thickness and cover thickness Status: Valid GB/T 5753: Historical versions
Basic dataStandard ID: GB/T 5753-2013 (GB/T5753-2013)Description (Translated English): Steel cord conveyor belts -- Methods for the determination of total thickness and cover thickness Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: G42 Classification of International Standard: 53.040.20 Word Count Estimation: 9,997 Older Standard (superseded by this standard): GB/T 5753-2008 Adopted Standard: ISO 7590-2009; IDT Regulation (derived from): National Standards Bulletin No. 25 of 2013 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies: three for steel cord conveyor belt, and the total thickness of the cover layer thickness measurement test methods. This standard applies to: steel cord conveyor belt. Methods Al and A2 (thickness meter method) for the determinatio GB/T 5753-2013: Steel cord conveyor belts -- Methods for the determination of total thickness and cover thickness---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Steel cord conveyor belts. Methods for the determination of total thickness and cover thickness ICS 53.040.20 G42 National Standards of People's Republic of China Replacing GB/T 5753-2008 Steel cord conveyor belt Determination of total thickness and cover thickness (ISO 7590.2009, IDT) Issued on. 2013-12-17 2014-10-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordThis standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard replaces GB/T 5753-2008 "Determination of total thickness and cover thickness of steel cord conveyor belt", and GB/T 5753-2008 compared to the main technical changes are as follows. --- Increasing the sources of measurement of coating thickness of the sample (see 5.1); --- Modify the label location map measuring point and the detection of the sample (see Figure 2; 2008 edition of the FIG. 1); --- Modify the cover layer thickness of letter code (see 5.4; 2008 version 5.3); --- Increased by reference. This standard uses the translation method identical with ISO 7590. Determination of "steel cord conveyor belt and the total thickness of the cover layer thickness of 2009 method". This standard made the following editorial changes. --- Added "This standard applies to steel cord conveyor belt" in scope; --- With "GB/T 17044" instead of "ISO 8094"; --- Corrected Fig. 4, s3, s8 errors painting (see Figure 4). The standard proposed by China Petroleum and Chemical Industry Association. This standard by the National Standardization Technical Committee pulley and the belt conveyor Technical Committee (SAC/TC428/SC1) centralized. This standard was drafted. Zhejiang Double Arrow Rubber Co., Ltd. Fuxin Huanyu Rubber (Group) Co., Ltd., Zhejiang Fenfei Rubber Products Ltd., Shandong Xiang Tong Rubber Group Co., Ltd., Qingdao Shinkansen Technical Advisory Co., Ltd. Qingdao Branch Co., Dah Sing Rubber Technology Services The company, Qingdao University of Science and Technology. Drafters of this standard. people will Shen, ZHANG Chun-lei, Cheng Chi Liu, Liu Shengping, Lvgui Qin, Zhu Hanhua, Lee Cheng Cheng. This standard replaces the standards previously issued as follows. --- GB/T 5753-1986, GB/T 5753-1994, GB/T 5753-2008. Steel cord conveyor belt Determination of total thickness and cover thickness1 ScopeThis standard specifies three test methods for steel cord conveyor belt and the total thickness of the cover layer thickness measurement. This standard applies to steel cord conveyor belt. Method A1 and A2 (thickness gauge method) for the determination of total thickness and cover thickness all steel cord conveyor belt. Method B (optical method) is recommended only for measuring the thickness of the cover layer. This standard does not apply to the case with a fabric or metal cross member or the cutting end face twisted rope happen.2 Terms and definitionsThe following terms and definitions apply to this document. 2.1 The buffer layer breaker Contained in the coating layer enhancement layer. 2.2 Transverse member weft For reinforcing the tape core, are not considered part of the lateral layer covering layer. Principle 3 Bandwidth predetermined thickness measuring points with the total thickness. Cover thickness measurement can optionally be one of the following methods. a) the removal of the cover layer before the next and after detection sample thickness was measured at several points specified, then subtraction Cover Cap thickness; b) with optical instruments directly measure the thickness of the cover layer.4 device4.1 Method A1 and A2 are used to rotate the pointer thickness gauge The device measurement accuracy of 0.1mm, diameter flat round head is 10mm, the ram pressure applied to the specimen for the detection of 22kPa ± 5kPa. 4.2 Method B used in the optical measuring device The apparatus should include a hand-held magnifying glass with an accuracy of 0.1mm, the magnification should be at least eight times. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 5753-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 5753-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 5753-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 5753-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 5753-2013?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 5753-2013 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |