GB/T 42994-2023 English PDFUS$269.00 ยท In stock  
  Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 42994-2023: Guidelines for management consultancy services - Project management Status: Valid 
 Basic dataStandard ID: GB/T 42994-2023 (GB/T42994-2023)Description (Translated English): Guidelines for management consultancy services - Project management Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: A01 Classification of International Standard: 03.100.40 Word Count Estimation: 14,180 Date of Issue: 2023-09-07 Date of Implementation: 2023-09-07 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 42994-2023: Guidelines for management consultancy services - Project management---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.ICS 03.100.40 CCSA01 National Standards of People's Republic of China Management Consulting Services Guide to Project Management Published on 2023-09-07 Implemented on 2023-09-07 State Administration for Market Regulation Released by the National Standardization Administration Committee Table of contentsPreface III 1 Scope 1 2 Normative reference documents 1 3 Terms and Definitions 1 4 Principle 2 4.1 Value Principle 2 4.2 Implementable Principle 2 4.3 Code of Ethics and Professional Conduct2 4.4 Confidentiality Principle 2 5 Service Resources 2 5.1 Professional Competencies 2 5.2 Service operation mechanism 2 5.3 Service Capability 3 5.4 Management system and quality assurance capabilities3 6 Service classification and service process 3 6.1 Service Category 3 6.2 Service process 4 6.3 Matrix 4 of service classification and service process Reference 9ForewordThis document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents" Drafting. Please note that some content in this document may be subject to patents. The publisher of this document assumes no responsibility for identifying patents. This document is proposed and coordinated by the National Project Management Standardization Technical Committee (SAC/TC343). This document was drafted by. China Inspection and Certification Group Testing Technology Co., Ltd., China Quality Certification Center, Meager Strength (Beijing) Management Consulting Co., Ltd., China Council for the Promotion of International Trade Commercial Industry Committee, Xiamen Kaimu Management Consulting Co., Ltd., Shanghai Zhensai Electromechanical Technology Co., Ltd., China Association for Standardization, China International Talent Exchange Foundation, China Standard Technology Group Co., Ltd., Hangzhou Quality Technology Technical Supervision and Inspection Institute, National Marine Standards and Metrology Center, Shandong Institute of Standardization, Shandong Expressway Co., Ltd., Huixiang Tiandi Management Consulting Consulting (Beijing) Co., Ltd., Beijing Gaoyuan Huaxin Technology Co., Ltd., Guangdong Xintailong Environmental Protection Group Co., Ltd., Beijing Yika Zhixing Technology Development Exhibition Co., Ltd., Certification and Accreditation Technology Research Center of the State Administration for Market Regulation, Tengzhou Rural Economic Affairs Center, Dongguan Shenzhen Tsinghua University University Research Institute Innovation Center, Xi'an Xiongjian Energy Assistance Project Management Consulting Co., Ltd., China Petrochemical Corporation Shengli Oilfield Branch, China Southern Power Grid Co., Ltd. Extra High Voltage Transmission Company Electric Power Research Institute, Zhongyi Instek Technology Co., Ltd., Jiaxing City Standards and Quality Construction Promotion Association, Inspur Electronic Information Industry Co., Ltd., China Chemical Safety Association, Jincheng Chengxin Mining Management Co., Ltd. Co., Ltd., Qingdao Biaoyi Technology Co., Ltd., Qingdao Engineering Consulting Institute, Xi'an Municipal Construction (Group) Co., Ltd., Qingdao Qingyi Engineering Consulting INQUIRY LIMITED. The main drafters of this document. Liu Wenwen, Wu Feng, Wu Xiangke, Xiao Yang, Yao Xin, Jin Chaoyang, Liu Jie Baixue, Xu Ziqiang, Wang Fei, Zhong Chunlan, Zeng Weipeng, Yu Biao, Jia Baoshan, Hu Baisong, Tang Yirong, Cao Yangdong, Song Huitao, Tong Jun, Zheng Hong, Zhang Yange, Zhou Jin, Liu Zhiqiang, Xie Shujuan, Zhu Zhenxiang, Qi Junli, Zhao Hong, Zhang Huibin, Xin Yongguang, Ou Hongsen, Deng Yunfeng, Zhang Bo, Chen Shuai, Wu Xinguo, Xu Di, Ou Lixiong, Zhu Jinsu, Li Jia, Liu Wanying, Liang Zheng, He Yin, Gang Yong, Cao Yan, Li Jianjie, Gao Honggang, Shi Jun, Lu Nianming, Wang Da, Wang Qinghai, Wang Xiancheng, An Huajuan, Ma Zhongjun, Li Hua, Ma Songtao, Shi Lijun, Cui Qi. Management Consulting Services Guide to Project Management1 ScopeThis document establishes the principles of project management consulting services and provides guidance on project management consulting service resources, service classifications, and service processes. This document is applicable to project management consulting service agencies that provide single or combined services such as planning, consulting, training, and digitalization, and other relevant parties. Reference use.2 Normative reference documentsThe contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document. GB/T 19001 Quality Management System Requirements GB/T 23691 Project Management Terminology GB/T 37507 Project Management Guide GB/T 41831 Competency evaluation requirements for project management professionals3 Terms and definitionsThe terms and definitions defined in GB/T 23691 and the following apply to this document. 3.1 project managementprojectmanagement Coordinated activities of planning, organizing, implementing, monitoring and controlling to achieve the established goals of the project. [Source. GB/T 23691-2009,2.1.4] 3.2 In the field of management consulting, in order to create value or promote change, by providing suggestions, solutions, considering countermeasures or forming communicable A series of interdisciplinary mental activities are carried out to deliver results. [Source. ISO 20700.2017,3.11] 3.3 An organization that provides management consulting services. [Source. SB/T 11222-2018,2.3] 3.4 Utilize information technology and other emerging technologies to integrate into management consulting solutions, solidify and optimize consulting results through technology, and transform management consulting into The result delivery method that transforms consulting results into consulting solutions. [Source. SB/T 11222-2018,2.4] ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 42994-2023_English be delivered?Answer: Upon your order, we will start to translate GB/T 42994-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 42994-2023_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 42994-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |